Changes from report parliamentary committee draft to plenary report

ITRE-PR-785274 → A-10-2026-0195

From
ITRE-PR-785274 report parliamentary committee draft of 16 Apr 2026
To
A-10-2026-0195 Plenary report of 3 Jul 2026
Changes
Not comparable
Paragraphs
+290 added · −90 removed · 2 changed
More facts (2)
Title (from)
on the proposal for a directive of the European Parliament and of the Council amending Directives (EU) 2018/2001, (EU) 2019/944, (EU) 2024/1788 as regards acceleration of permit-granting procedures
Title (to)
on the proposal for a directive of the European Parliament and of the Council amending Directives (EU) 2018/2001, (EU) 2019/944, (EU) 2024/1788 as regards acceleration of permit-granting procedures

These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.

Changes that matter, 1

Changes to the text in document order — the ones the change notes describe. Cover page, renumbering and punctuation-only edits are left out (see “Every difference”); changes to citations and references stay in and are marked as formal in the notes.

Change 1

RemovedRecital 3 a (new): (3a) Another significant barrier to grid expansion is the lack of sufficient financing. According to the Commission, EUR 1,2 trillion is needed for investments in electricity grids by 20401a to achieve a decarbonised economy. Therefore, Member States should facilitate access to financing sources, including the Union funding instruments, in particular the European Competitiveness Fund and the policy window for Energy Infrastructure, Industrial Decarbonisation and Clean Technology. Such instruments are planned to contribute covering, inter alia, investments in transmission and distribution networks with a view to enabling the integration of renewable energy. Furthermore, Member States are encouraged to prioritise and make effective use of innovative financial instruments, such as blended finance, guarantees and project development assistance, by combining Union support with financing from the European Investment Bank Group, national promotional banks and other public and private financial institutions, to support the development, reinforcement and integration of electricity grid infrastructure projects. Such instruments are essential to accelerate investment delivery, improve project bankability and substantially reduce investment risks for complex grid projects, thereby contributing to the large-scale integration of renewable energy and strengthening the resilience, security and affordability of the Union’s energy system. / 1a EUR 1,2 trillion by 2040 for electricity grids, in…

AddedAMENDMENTS BY THE EUROPEAN PARLIAMENT*

RemovedRecital 5: (5) Unsound public participation processes leading to opposition in the form of administrative and judicial challenges continue to contribute to lengthy implementation of relevant energy projects. Challenges give rise to additional steps outside of the foreseen administrative permit-granting procedures timelines, leading to unforeseen delays that vary in duration according to the judicial speed of the Member State in question. Lack of public acceptance is one of the primary barriers to renewable energy permit-granting procedures and thus market uptake. Ensuring public participation by local communities in renewable energy projects, can increase public acceptance. Therefore, Member States should adopt measures so that renewable energy projects with an installed capacity above 3 MW share their benefits with local citizens and communities by means of direct or indirect participation, without prejudice to the free choice of supplier in accordance with Article 4 of Directive (EU) 2019/944 of the European Parliament and of the Council7. Such measures should achieve the objective of the Citizens Energy Package of 90GW of community energy projects by 2030, including direct participation in renewable energy projects, through co-ownership models, to enhance local acceptance and deliver additional social and economic value. Such measures should deliver tangible economic benefits to the communities affected. They should prioritise discounts in the price of electricity, ensuring lower ele…

Addedto the Commission proposal

RemovedRecital 6: (6) Local resistance, often rooted in lack of transparency, and insufficient community involvement can result in delays in permit-granting procedures and subsequent litigation. Early-stage and appropriate involvement of the public is a clear success factor in renewable energy projects, as indicated in Commission Recommendation (EU) 2024/1343.8 To ensure transparency from the initial stages of the process, Member States should ensure that local communities have access to all necessary information on the project, their rights and benefit sharing measures. A professional independent facilitator can accelerate the deployment of large renewable energy installations above 3 MW by promoting consultations between the project developers and the local communities, where appropriate, prior and during the permit-granting procedures with the aim to promote dialogue and build consensus among the relevant parties, including on equitable benefit-sharing measures, during the entire process and avoid legal disputes. The facilitator should be a third party, independent from the relevant parties, and should not have any financial stake connected to the developer or to the community where the project is located. If a Member State already has procedures in place that are equally effective in ensuring participation and public acceptance of renewable energy projects, it should be able to retain and use those instead of appointing a facilitator.

Added---------------------------------------------------------

Show 373 more lines

RemovedRecital 7 a (new): (7a) The use of advanced digital tools, such as the use of digital twins and other dynamic digital models, can significantly support the acceleration of permit-granting procedures while ensuring high environmental protection standards. Digital twins include dynamic virtual representations of a physical asset or infrastructure that are continuously updated with real-world data throughout their lifecycle, enabling simulation, predictive maintenance, performance optimisation and impact assessment of proposed modifications. Digital twins of the European electricity grid could enhance the efficiency and smartness of the grid as a way to make networks, and the energy system as a whole, more intelligent. The development of a federated ecosystem of this solution on a European scale would allow each operator to make independent implementation decisions while ensuring interoperability. In general, advanced digital technologies can improve the efficiency, transparency and quality of environmental assessments by enabling data-driven comparisons between existing and proposed infrastructure configurations. In particular, digital models can facilitate the assessment of whether modifications such as repowering or grid upgrades remain within an existing footprint, thereby supporting more proportionate assessment procedures while preserving environmental safeguards and public scrutiny.

AddedProposal for a

RemovedRecital 8: (8) Faster and shorter permitting deadlines for permit-granting procedures need to be accompanied by additional measures which ensure their effectiveness in practice. Administrative tacit approval measures ensure that an application is automatically approved if the public administration fails to act within a legally defined deadline and are therefore a useful tool to address administrative inaction by providing legal effect to the administration’s silence. Directive (EU) 2018/2001 introduces tacit approval for certain decisions, namely for intermediate steps of the permit-granting procedure in renewable acceleration areas, and for the final permits for all small-scale solar installations with a capacity below 100 kW. Directive (EU) 2018/2001 introduced Renewable Acceleration Areas to ensure faster and shorter permitting, however their implementation has been uneven across Member States. In particular, the absence or insufficient designation of such areas may result, in practice, in large parts of national territories being treated as de facto exclusion zones, thereby undermining the objective of ensuring the timely deployment of renewable energy projects. Therefore, it is important to also apply this measure in the permit-granting procedures applicable to projects located outside acceleration areas. In these procedures, Member States should ensure that the principle of administrative tacit approval is applied, including for final decisions with the exception of environmental …

AddedDIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

RemovedRecital 8 a (new): (8a) To accelerate the deployment of electricity infrastructure, the Commission and Member States should aim to agree on a high level of standardisation of key grid equipment across the Union. Enhanced coordination and, where appropriate, joint technical assessment by the Commission, distribution system operators, transmission system operators and industry, should be encouraged to ensure consistency, interoperability and streamlined permitting.

Addedamending Directives (EU) 2018/2001, (EU) 2019/944, (EU) 2024/1788 as regards acceleration of permit-granting procedures

RemovedRecital 8 b (new): (8b) Member States are encouraged to apply European preference in public procurement processes for electricity grid equipment, software and services in order to reduce the Union’s dependence on third-country suppliers. The Commission should ensure a strategic approach to acquiring energy technologies, components or critical materials related to grids while promoting resilience, sustainability and security in public procurement procedures.

RemovedRecital 9: (9) Repowering of existing renewable energy power plants has significant potential to contribute to the achievement of renewable energy targets. Since existing renewable energy power plants have, for the most part, been installed in sites with significant renewable energy source potential, repowering can ensure the continued use of those sites, thus ensuring efficient land use and exploitation of the best renewable energy resources. This is particularly the case for onshore wind, especially taking into account that in Europe many onshore wind farms are approaching the end of contracts supporting their electricity generation and that 26 GW of existing wind plants have been in operation for more than 20 years10 . Repowering includes further benefits such as an existing grid connection, a likely higher degree of public acceptance and knowledge of the likely environmental impacts. Considering that the repowering of wind plants often leads to a lower number of turbines being installed in the same site, the environmental impact of repowered wind plants is limited. Therefore, requirements on environmental screening or environmental impact assessment should be reduced or even waived where the repowering of an existing wind plant does not entail the use of significant additional land surface and the height of the wind installation is not significantly increased, while the repowering increases the total capacity of the installation and complies with the applicable environmental mitigat…

AddedTHE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,

RemovedRecital 13: (13) Accelerating the deployment of stand-alone energy storage is crucial to increase the flexibility of the energy system and to ensure system integration of renewable energy production. Stand-alone storage should therefore benefit from accelerated permit-granting procedures. Small-scale energy storage with a capacity below 100 kW is not likely to have significant adverse effects on the environment or the grid and is not expected to raise concerns related to competing uses of space. In view of this, it is appropriate to streamline the permit-granting procedures applicable to this type of storage by eliminating all administrative permits, with the exception of the grid connection permit, and exempting, with appropriate safeguards, these installations from the obligation to carry out an environmental impact assessment pursuant to Directive 2011/92/EU. The deployment of energy storage with a capacity above 100 kW also needs to be accelerated. Therefore, it is appropriate to streamline their permit-granting procedure by establishing a maximum overall deadline of six months, except for pumped hydropower storage, which must comply with stricter environmental requirements and therefore requires a longer maximum overall deadline. To ensure system integration of renewable energy production, it is necessary to increase flexibility sources, notably batteries of electric vehicles, as they can contribute to shifting peak electricity demand and reducing grid congestion. In order to achiev…

AddedHaving regard to the Treaty on the Functioning of the European Union, and in particular Article 192(1) and Article 194(2) thereof,

RemovedRecital 14: (14) Obtaining grid connection permits is a crucial and often time-consuming part of the procedures to build and operate a renewable energy installation. It is therefore appropriate to further streamline the deadlines applicable for the grid connection procedures applicable to certain small-scale renewable energy projects, storage assets and recharging stations, and the repowering and hybridisation of renewable energy projects, and to introduce clear rules regarding the obligations of the system operators during the permit procedures. Within the applicable deadlines, system operators should grant connection requests where capacity allows or, where capacity is insufficient, propose alternative solutions such as flexible connections, alternative connection points, or adjusted timelines; refusal should remain a last resort where no viable option exists. Small-scale solar installations, storage and recharging stations should benefit from streamlined grid connection procedures in cases where a grid connection already exists, under appropriate conditions to ensure grid stability, reliability and safety.

AddedHaving regard to the proposal from the European Commission,

RemovedRecital 16: (16) Lack of resources in national authorities and the reduced digitalisation of permit-granting procedures results in delays in the permitting of electricity system infrastructure and generation assets. Member States should ensure that such authorities have adequate human financial and technical resources, including skills, and digital management tools and systems that enable them to render decisions within the deadlines provided in the Directive. To ensure the necessary financial resources, Member States should make use of relevant Union funding instruments.

AddedAfter transmission of the draft legislative act to the national parliaments,

RemovedRecital 16 a (new): (16a) There is an urgent need to address labour shortages in the energy sector to support renewable deployment, grid expansion and related technologies. The persistent shortages of skilled electrical workers such as electrical mechanics and fitters in several Member States as well as increasing staffing pressures on transmission and distribution system operators calls for action. Therefore, Member States should provide indicative projections of workforce needs in the energy sector, including for skilled energy and network-related professions, and to outline measures to address those needs, which may include training, upskilling and reskilling. In order to ensure adequate skilled staff, the Member States should rely on the Commission’s support in ensuring training, upskilling and reskilling in grid-related skills.

AddedHaving regard to the opinion of the European Economic and Social Committee

RemovedRecital 25: (25) Due the urgency in deploying energy infrastructure, the importance of streamlining authorisation procedures and the fact that environmental assessments represent the step with the longest duration in authorisation procedures, it matters to minimise such assessments without jeopardising the protection of the environment. The refurbishment, modernisation or repowering of existing transmission and distribution system infrastructure, and the construction of new distribution system infrastructure, are projects which generally entail minimal environmental impacts. Refurbishment, modernisation or repowering projects are routinely of limited size and affect only part of existing assets for which environmental impacts have been previously assessed. As a result, the impacts of such projects are often limited to those of construction works, with the operation of the asset having the same, or even a lesser, impact than the operation of the project it targeted. Distribution systems on the other hand, due to the smaller size of their projects, lower voltage of their assets and tendency to be developed in built areas closer to consumers tend not to have significant environmental impacts. As such, to accelerate the deployment of the electricity system infrastructure, enable the electrification of industry and digitalisation of the economy and achieve climate neutrality and renewable energy targets, Member States should be allowed to justifiably exempt, under certain conditions, the proj…

AddedHaving regard to the opinion of the Committee of the Regions,

RemovedRecital 25 a (new): (25a) One of the environmental assessments contributing to long authorisation procedures when deploying energy infrastructure is the assessment mandated under Directive 2000/60/EC, despite the fact that grid infrastructure projects are usually unlikely to result in deterioration of a body of surface or groundwater. In order to significantly speed up the authorisation procedure without jeopardising the protection of the environment, transmission projects may be exempted from these assessments, provided that mitigation measures constitute an inherent component of the project.

AddedActing in accordance with the ordinary legislative procedure,

RemovedRecital 27 a (new): (27a) The legally binding energy efficiency first principle is to be applied consistently to grid infrastructure planning to maximise the use of existing grid infrastructure in the most cost-effective way. Grid-enhancing technologies, hardware and software solutions that increase the capacity and efficiency of transmission infrastructure can deliver 20 to 40% additional capacity gains using existing infrastructure1a. / 1a Source: https://www.europarl.europa.eu/RegData/etudes/BRIE/2025/772854/EPRS_BRI(2025)772854_EN.pdf https://www.acer.europa.eu/monitoring/MMR/electricity_infrastructure_2024

AddedWhereas:

RemovedRecital 29: (29) Lack of resources in national authorities and the limited digitalisation of permitting procedures results in delays in the permitting of natural gas facilities, hydrogen production facilities, and hydrogen system infrastructure. Member States should ensure that such authorities have adequate human, financial and technical resources, including skills and digital management tools and systems that enable them to render decisions within the deadlines provided in the Directive. To ensure the necessary financial resources, Member States should make use of relevant Union funding instruments.

Added(1) Slow and complicated permit-granting procedures, including grid connection procedures, is one of the main factors causing delays in the development of energy projects and electricity infrastructure. Electricity transmission grids take around 10 years for completion, of which permitting accounts for more than half of the time needed. Similarly, permitting of renewable energy projects can still take up to nine years depending on the Member State and the technology involved. Storage installations can take from one to seven years depending on the technology. The permit-granting procedures for construction or transformation of recharging stations and recharging pools along highways and in depots can take up to two years in some Member States. Slow permitting is due, among other things, to incoherent administrative systems among multiple authorities, inadequate staffing in authorities, the duration of environmental assessments, lack of public acceptance, limited digitalisation and data availability as well as administrative and judicial challenges.

RemovedDirective (EU) 2018/2001

Added(2) In recent years, new measures have been introduced at Union level to accelerate the permit-granting procedures for renewable energy projects and, to some extent, infrastructure projects. In 2022, Council Regulation (EU) 2022/2577 was adopted to accelerate permit-granting procedures for renewable energy and related infrastructure projects. Its partial application was prolonged by Council Regulation (EU) 2024/223 until 30 June 2025. Furthermore, Directive (EU) 2023/2413 of the European Parliament and of the Council amended Directive (EU) 2018/2001 of the European Parliament and the Council to streamline administrative procedures for authorising renewable energy plants by introducing a comprehensive permitting framework, with shorter deadlines and simpler rules. The amended Directive included mapping obligations, the obligation to designate renewables acceleration areas where the environmental impacts stemming from projects are expected to be low and therefore faster and simpler rules can apply, and optional measures to introduce acceleration areas for infrastructure projects where infrastructure projects are exempted from an environmental impact assessment under certain conditions such as carrying out a strategic environmental assessment of the area.

RemovedArticle 1 – paragraph 1 – point 1, Article 2 – paragraph 2 – point 10f a (new): (10fa) ‘non-wire solutions’ means investments in the energy infrastructure in electricity, which can increase the available grid capacity or improve the efficiency of grid operation by deploying grid enhancing technologies, and any other resource or technology that reduce the need for grid expansion, including digital solutions;

Added(3) A further improvement simplification and shortening of the administrative permit-granting procedures in a coordinated and harmonised manner is necessary in order to ensure that the Union reaches its ambitious climate and energy targets for 2030 and the objective of climate neutrality by 2050. Directive (EU) 2018/2001 did not address important issues which significantly delay permit-granting procedures and the integration of renewables into the system, such as slow permit-granting procedures for grids, stand-alone energy storage recharging stations or recharging pools, lack of public acceptance or insufficient digitalisation of procedures. Moreover, that Directive includes only certain of the measures of Regulation (EU) 2022/2577 but lacks several important measures included therein which have ceased to apply, such as expanding the priority of renewable energy projects beyond environmental aspects and streamlining compliance with certain environmental rules. Finally, some targeted amendments to existing measures of Directive (EU) 2018/2001 are necessary to ensure their full effectiveness and ensure cost-effective decarbonisation pathways and to avoid fragmentation of national approaches thereby strengthening investment certainty across the Union.

RemovedDirective (EU) 2018/2001

Added(3a) Another significant barrier to grid expansion is the lack of sufficient financing. According to the Commission, EUR 1,2 trillion is needed for investments in electricity grids by 2040 to achieve a decarbonised economy. Therefore, Member States should facilitate access to financing sources, including the Union funding instruments. Furthermore, Member States are encouraged to prioritise and make effective use of innovative financial instruments, such as blended finance, guarantees and project development assistance, by combining Union support with financing from the European Investment Bank Group, national promotional banks and other public and private financial institutions, to support the development, reinforcement and integration of electricity grid infrastructure projects. Such instruments are essential to accelerate investment delivery, improve project bankability and substantially reduce investment risks for complex grid projects, thereby contributing to the large-scale integration of renewable energy, and strengthening the resilience, security and affordability of the Union’s energy system.

RemovedArticle 1 – paragraph 1 – point 1, Article 2 – paragraph 2 – point 10f b (new): (10fb) ‘share of the benefits of renewable projects’ means the equitable redistribution of economic benefits generated throughout all stages of the project lifecycle to local communities hosting or affected by renewable energy installations, including financial or ownership-based forms, such as participation through energy communities, as well as contributions to the local economy;

Added(4) Article 15c of Directive (EU) 2018/2001 introduces an obligation for Member States to designate renewables acceleration areas for at least one renewable energy technology. For the purposes of such designation, Member States may exclude certain areas from becoming renewables acceleration areas due to their high environmental value and sensitivities. However, an assessment of the implementation of Articles 15b and 15c of Directive (EU) 2018/2001 demonstrates that a significant number of Member States have neither yet designated renewables acceleration areas nor fulfilled their obligations to map sufficiently large areas for the installation of renewables in their territories required to meet their national contributions towards the Union renewable energy target for 2030. In that regard, available spatial analyses indicate that only approximately 2% of the Union's total land area is required to accommodate the solar and wind installations needed to meet the Union's climate and energy objectives, and that suitable land identified on the basis of strict environmental and agricultural constraints, amounts to more than twice that figure, confirming that adequate areas for renewable energy deployment can be identified before any territorial restrictions are imposed. In order not to undermine the objectives of the designation of renewables acceleration areas, it should be ensured that Member States do not designate exclusion areas without introducing sufficient land surface for renewable acceleration areas and Member States must not identify large territories where the installation of renewable energy projects is a priori not possible due to environmental reasons including protection of landscape, since those projects will be subject to the relevant dedicated environmental assessments which will allow to identify potential environmental impacts and to address them. In order to ensure effective and uniform implementation, Member States should not designate large areas where the installation of renewable energy projects and their related infrastructure is legally or de facto restricted due to environmental reasons, and any existing restricted areas should be reviewed and potentially repealed or amended.

RemovedDirective (EU) 2018/2001

Added(5) Unsound public participation processes leading to opposition in the form of administrative and judicial challenges continue to contribute to lengthy implementation of relevant energy projects. Challenges give rise to additional steps outside of the foreseen administrative permit-granting procedures timelines, leading to unforeseen delays that vary in duration according to the judicial speed of the Member State in question. Lack of public acceptance is one of the primary barriers to renewable energy permit-granting procedures and thus market uptake. Ensuring effective public participation by local communities in renewable energy projects, ▌can increase public acceptance. Therefore, Member States should adopt measures so that renewable energy projects with an installed capacity above 7 MW share their benefits with local citizens and communities by means of direct or indirect participation, without prejudice to the free choice of supplier in accordance with Article 4 of Directive (EU) 2019/944 of the European Parliament and of the Council. Economic benefits to the communities affected should be prioritised when deciding on measures, and these may include lowering electricity bills for households and businesses, financial compensation to local communities, or enabling shared ownership schemes of the energy generating assets, and the energy produced by those assets, such as through renewable energy communities, including via cooperation with energy communities. The latter is particularly relevant given the Citizens Energy Package’s objective of reaching 90 GW of community energy projects by 2030 and the fact that direct participation in renewable energy projects through co-ownership models has proven to enhance local acceptance and deliver additional social and economic value. Moreover, the logic of benefit sharing that is inherent in non-commercial renewable energy projects developed directly by citizens and renewable energy communities, which justifies exempting those projects from additional requirements. Particular attention should be paid to ensuring that communities most affected by renewable ▌energy projects, including vulnerable households, receive an adequate share of benefits through participation mechanisms. Member States or relevant regional authorities should ensure that project developers comply with established measures, including by providing any needed information. However, Member States should not be required to implement any new measures if it can be demonstrated that equally effective direct or indirect measures are already in place. Indirect benefits that would occur in the ordinary course of the development, construction or operation of a project, should not, in themselves, be deemed to constitute benefit-sharing.

RemovedArticle 1 – paragraph 1 – point 2, Article 15c – paragraph 6: 6. Member States shall not designate large areas where the installation of renewable energy plants and their related infrastructure is legally or de facto restricted due to environmental reasons, including protection of landscape, unless they can demonstrate that those types of plants and their related infrastructure would result in irreversible damage in the area which cannot be mitigated or compensated for during the environmental assessment pursuant to Directive 2011/92/EU and, where relevant, the appropriate assessment pursuant to Article 6(3) of Directive 92/43/EEC;

Added(6) Local resistance, often rooted in lack of transparency, and insufficient community involvement can result in delays in permit-granting procedures and subsequent litigation. Early-stage and appropriate involvement of the public is a clear success factor in renewable energy projects, as indicated in Commission Recommendation (EU) 2024/1343. To ensure transparency from the initial stages of the process, Member States should ensure that local communities have access to all necessary information on the project, their rights and benefit sharing measures. A professional independent facilitator can accelerate the deployment of renewable energy installations above 7 MW by promoting consultations between the project developers and the local communities, if requested by the municipality, energy community or the project developer, prior and during the permit-granting procedures with the aim to promote dialogue and build consensus among the relevant parties including on proportionate benefit-sharing measures during the entire process and avoid legal disputes. The facilitator should be a third party, independent from the relevant parties, technically competent and should not have any financial stake connected to the developer or to the community where the project is located. The prioritisation of entities with proven experience in community energy when designating a facilitator would be beneficial in ensuring a brief and meaningful process. If a Member State already has alternative procedures in place that are fulfilling a similar function and are equally effective in ensuring participation and public acceptance of renewable energy projects, it should be possible for that Member State to retain and use those instead of appointing a facilitator.

RemovedThe effectiveness of Renewable Acceleration Areas introduced under Article 15c of the Renewable Energy Directive is barrier to ensure faster and shorter permitting deadlines. The current implementation has shown that its application has been uneven across Member States. In particular, the absence or insufficient designation of Renewable Acceleration Areas may result in large parts of national territories being treated, in practice, as de facto “no-go zones” undermining the objective of facilitating the timely deployment of renewable energy projects.

Added(7) The lack of resources of permitting authorities and the lack of digitalisation of permit-granting procedures and data availability are bottlenecks slowing down permit-granting procedures. Digitalisation and an appropriate use of artificial intelligence features are key tools to speed up procedures and to increase efficiency for all parties involved. It allows a faster handling of applications by the relevant authorities, and it allows project promoters to have quick access to clear information on process steps and requirements from the outset, therefore ensuring transparency and monitoring. However, digitalisation of permit-granting procedures is lagging behind, as it is often scattered among permit-granting procedures and steps across different competent authorities and in most Member States there is no unified digital process. Moreover, often more than one digital portal is used to treat the same project application and interoperability is not always ensured. This leads to a high administrative burden for project promoters, limited internal coordination among authorities dealing with permit-granting procedures at different levels, lack of visibility of the status of the application and unclarity on the bottlenecks slowing down permit-granting procedures. Member States should set up a single digital portal at national level for all the steps of the permit-granting procedures for renewable energy, storage and grid projects so that it contributes to more uniform digitalisation, interoperability and transparency across different permitting authorities in Member States and ultimately speed up permit-granting procedures. Where several elements of the same project, or of functionally linked projects, including renewable generation, storage and grid connection, are subject to permit-granting procedures, Member States should ensure that environmental impact assessment data are stored in systems that allow competent authorities to access and reuse the same dataset. Such systems should be designed to enable seamless communication between competent authorities through standardised interfaces and should simplify the process by allowing applicants to file their application in a single portal that can automatically attribute the applications to the competent authority, which will treat them directly in the portal avoiding intermediate paper-based steps. The single digital portal should be built, to the greatest extent possible, on existing national platforms and available data infrastructures, to avoid duplication, ensure efficiency and interoperability with relevant administrative systems, including existing portals of system operators. However, if cost-efficient and preferred by the Member State a new digital platform may be built. The portal should present features, including by means of artificial intelligence, allowing the single contact point, other authorities and applicants to check the status of the application and where delays are, as well as check compliance with the permitting deadlines. The portal should provide for means of artificial intelligence to allow for automated processing of mass requests that have the potential of delaying the built-out of electricity grids, renewable energy and storage projects. In addition, it should allow for the extraction of statistics to check the overall progress of permit-granting procedures in Member States. The format chosen for storing and communicating the relevant data collected through the portal should be interoperable. The portal should facilitate the duties of the single contact point who should have access to all relevant data and information. In order to further enhance legal certainty and predictability for applicants, competent authorities and system operators should provide clear and precise guidance at an early stage on the documentation and information requirements applicable to connection procedures. Such guidance should be presented in standardised formats, including structured requirement frameworks and procedural checklists, differentiated by connection type, and should be made available in advance through the single digital portal.

RemovedDirective (EU) 2018/2001

Added(7a) The use of advanced digital tools can significantly support the acceleration of permit-granting procedures while ensuring high environmental protection standards. The possibility to use tools that include dynamic virtual representations of a physical asset or infrastructure that are continuously updated with real-world data throughout their lifecycle should be further explored.

RemovedArticle 1 – paragraph 1 – point 3, Article 15d – paragraph 3: 3. Member States shall adopt measures to ensure that an equitable share of the benefits of renewable energy projects with an installed capacity above 3 MW is passed on, directly or indirectly, to local citizens and communities in proximity to or otherwise affected by those projects, including households affected by energy poverty or vulnerability, as well as the expected local industrial development and employment associated with such projects. Those measures shall deliver economic benefits, prioritising lower electricity bills for households and businesses in affected communities, introducing a resource rent, namely a fixed share per kWh renewable energy produced in the local community, or enabling community ownership of the energy generating assets, and the energy produced by those assets through renewable energy communities.

Added(8) Faster and shorter permitting deadlines for permit-granting procedures need to reflect in their timelines the complexity of the projects concerned and be accompanied by additional measures which ensure their effectiveness in practice. Administrative tacit approval measures ensure that an application is automatically approved if the public administration fails to act within a legally defined deadline and are therefore a useful tool to address administrative inaction by providing legal effect to the administration’s silence. Directive (EU) 2018/2001 introduces tacit approval for certain decisions, namely for intermediate steps of the permit-granting procedure in renewable acceleration areas, and for the final permits for all small-scale solar installations with a capacity below 100 kW. Given the need to accelerate the deployment of renewable energy sources and the fact that the implementation of renewable acceleration areas is a time-consuming process, it is appropriate to also apply this measure in the permit-granting procedures applicable to projects located outside acceleration areas. In these procedures, Member States should ensure that the principle of administrative tacit approval is applied, including for final decisions with the exception of environmental decisions. In order to ensure an effective application of this measure and to guarantee the rights of third parties to judicial protection, the relevant authorities should make public that a decision has been tacitly adopted.

RemovedDirective (EU) 2018/2001

Added(9) Refurbishment, modernisation and repowering of existing renewable energy power plants have significant potential to contribute to the achievement of renewable energy targets. Since existing renewable energy power plants have, for the most part, been installed in sites with significant renewable energy source potential, refurbishment, modernisation and repowering can ensure the continued use of those sites, thus ensuring efficient land use and exploitation of the best renewable energy resources. This is particularly the case for the refurbishment, modernisation and repowering of onshore wind plants, especially taking into account that in Europe many onshore wind farms are approaching the end of contracts supporting their electricity generation and that 26 GW of existing wind plants have been in operation for more than 20 years. Refurbishment, modernisation and repowering includes further benefits such as an existing grid connection, a likely higher degree of public acceptance and knowledge of the likely environmental impacts. Considering that the repowering of wind plants often leads to a lower number of turbines being installed in the same site, the environmental impact of repowered wind plants is limited. Therefore, requirements on environmental screening or environmental impact assessment should be reduced or even waived where the refurbishment, modernisation or repowering of an existing wind plant does not entail the use of significant additional land surface, increases the total capacity of the installation and complies with the applicable environmental mitigation measures established for the original wind energy installation. The same should apply to the repowering of existing solar installations provided that it does not entail the use of additional space and complies with the applicable environmental mitigation measures established for the original solar installation. Repowering of existing renewable energy power plants should be done in accordance with the good practices laid down in Commission Staff Working Document entitled Guidance to Member States on good practices to speed up permit-granting procedures for renewable energy and related infrastructure projects, including any subsequent amendments or replacements, and taking into account the latest scientific developments.

RemovedArticle 1 – paragraph 1 – point 3, Article 15d – paragraph 3 a (new): 3a. Member States shall identify the public likely to be affected, including residents, civil society organisations, local businesses, and municipalities representing local communities, taking into account the type, scale, geographical and environmental impact of the renewable energy project. Member States shall establish minimum standards for benefit sharing and appropriate criteria to assess the effectiveness of those measures.

Added(10) Self-consumption installations, including those for jointly-acting self-consumers and as local energy communities, contribute to reducing overall demand for natural gas, increasing resilience of the system and achieving the Union’s renewable energy targets, and supporting citizens and SMEs with ways to face recurrent energy crises characterised by volatile prices on fossil fuels and thus financial uncertainty. The installation of solar energy equipment and co-located energy storage with a capacity below 200 kW is not likely to have significant adverse effects on the environment or the grid and does not raise safety concerns. In addition, small installations do not generally require capacity expansion at the grid-connection point. In order to further accelerate the deployment of small-scale solar equipment and co-located energy storage, Member States should not require any administrative permits for these installations, with the exception of the grid connection permits or agreements, as is already the case in several Member States. Aligning Union legislation with existing best practices should allow further acceleration of the deployment of these installations in a harmonised manner. The installation of solar energy equipment and co-located energy storage above 200 kW in existing or future artificial structures does not typically raise concerns related to competing uses of space or environmental impact. Those installations should therefore benefit from shorter permit-granting procedures and be exempt, with appropriate safeguards, from the obligation to carry out an environmental impact assessment pursuant to Directive 2011/92/EU of the European Parliament and of the Council.

RemovedDirective (EU) 2018/2001

Added(11) Renewable energy plays a key role in the decarbonisation of the Union’s energy system by offering immediate solutions to replace fossil-fuel based energy and contributes to reduce energy prices and increase energy security. Therefore, the authorisation of renewable energy projects and related electricity grid infrastructure should not be too easily blocked due to the mere existence of any type of conflicting interests. Member States should promote renewable energy plants contributing to or supporting the transition towards climate neutrality and infrastructure assets such as co-located and stand-alone storage assets and the related grid and recharging stations or recharging pools by expanding the existing presumption applicable for conflicts with environmental interests to any other conflicting interests, except in relation to where it is strictly necessary for the protection of cultural heritage▌. Renewable energy projects, when presumed of being of overriding public interest over non-environmental interests, should be given priority and authorised. In order to ensure a harmonised application of this rebuttable presumption, Member States should not be allowed to introduce exceptions when dealing with all types of conflicts, including environmental ones. That approach should apply consistently across renewable energy technologies to ensure a level playing field and to fully exploit the potential of all renewable energy sources available in the Union.

RemovedArticle 1 – paragraph 1 – point 3, Article 15d – paragraph 3 b (new): 3b. The Commission shall develop guidelines on benefit sharing to support Member States establishing standards and criteria, taking into account existing best practices, establishing key principles and baseline common standards for fair community engagement and benefit sharing in renewable energy projects.

Added(12) In order to speed up the deployment of renewables, their related assets and their connection to the grid, it is appropriate to also specify how the remaining conditions for applying specific derogations as provided for in Union environmental legislation can be met. In particular, for the purposes of relevant Union environmental law, when assessing whether there are satisfactory alternative solutions to the specific renewable energy project, the scope of such assessment should be limited to alternative solutions that ensure the achievement of the same objectives as the project in question within the same or similar timeframe and without resulting in significantly higher costs. When comparing the timeframe and the cost of satisfactory alternative solutions, the relevant authorities should take into account the need to deploy renewable energy in an accelerated and cost-effective manner in accordance with the priorities set out in their integrated national energy and climate plans and updates thereof submitted pursuant to Regulation (EU) 2018/1999 of the European Parliament and the Council and the expected speed to achieve those priorities. Similarly, when applying the relevant derogation provided for in Council Directive 92/43/EEC, it is appropriate that the relevant authorities may, in some justified cases where it can be reasonably demonstrated that the relevant plan or project would not affect irreversibly the ecological processes essential for maintaining the structure and functions of the site, that the overall coherence of the Natura 2000 network is not compromised, the environmental integrity of the site is preserved and that a high level of protection of the Natura 2000 sites is ensured, allow the compensatory measures to be carried out in parallel with the implementation of such plan or project.

RemovedDirective (EU) 2018/2001

Added(13) Accelerating the deployment of stand-alone energy storage is crucial to increase the flexibility of the energy system and to ensure system integration of renewable energy production. Stand-alone storage should therefore benefit from accelerated permit-granting procedures. Small-scale energy storage with a capacity below 200 kW is not likely to have significant adverse effects on the environment or the grid and is not expected to raise concerns related to competing uses of space. In view of this, it is appropriate to streamline the permit-granting procedures applicable to this type of storage by eliminating all administrative permits, with the exception of the grid connection permit or agreement, and exempting, with appropriate safeguards, these installations from the obligation to carry out an environmental impact assessment pursuant to Directive 2011/92/EU. The deployment of energy storage with a capacity above 200 kW also needs to be accelerated. Therefore, it is appropriate to streamline their permit-granting procedure by establishing a maximum overall deadline of six months, except for pumped hydropower storage, which must comply with stricter environmental requirements and therefore requires a longer maximum overall deadline. To ensure system integration of renewable energy production, it is necessary to increase flexibility sources, notably batteries of electric vehicles, as they can contribute to shifting peak electricity demand and reducing grid congestion. In order to achieve this, a swifter and easier deployment of recharging road infrastructure should be further promoted, notably covering cars, vans, trucks, busses or motorcycles, and plug-in hybrid or pure electric vehicles. Both alternating current and direct current recharging stations or recharging pools should benefit from accelerated permit-granting procedures, including for grid connection permits or agreements. Small recharging stations or recharging pools with a capacity below 200 kW and recharging pools below 1MW on artificial structures are not likely to have significant adverse effects on the environment or the grid and are not expected to raise concerns related to competing uses of space. In view of this, it is appropriate to streamline the permit-granting procedures applicable to these recharging stations or recharging pools by eliminating all administrative permits, with the exception of the grid connection permit or agreement, and exempting, with appropriate safeguards, these installations from the obligation to carry out an environmental impact assessment pursuant to Directive 2011/92/EU. The installation of recharging stations or recharging pools with a capacity above 200 kW also needs to be accelerated. Therefore, it is appropriate to streamline their permit-granting procedure by establishing a maximum overall deadline of six months. For the purposes of applying those capacity thresholds, where two or more recharging stations within a recharging pool share the same grid connection point, their capacity should be assessed jointly and, where such recharging stations have different grid connection points, their capacity should be assessed separately.

RemovedArticle 1 – paragraph 1 – point 3, Article 15d – paragraph 4 – subparagraph 1 – introductory part: Member States shall ensure that local communities have access to clear, accessible and reliable information, such as through the use of single digital contact point, on the permitting process, their rights, and benefit sharing measures. Project promoters and local communities shall engage with a view to reaching an agreement on benefit sharing measures related to the project. If such agreement cannot be found, Member States shall designate and finance an independent and technically competent facilitator to promote dialogue between the project developer and the general public for renewable energy projects with an installed capacity above 3MW. The facilitator shall only intervene upon request by any of the relevant parties, including citizens and energy communities, and shall:

Added(14) Obtaining grid connection permits is a crucial and often time-consuming part of the procedures to build and operate a renewable energy installation. It is therefore appropriate to further streamline the deadlines applicable for the grid connection procedures applicable to certain small-scale renewable energy projects, storage assets and recharging stations, or recharging pools, and the repowering and hybridisation of renewable energy projects, and to introduce clear rules regarding the obligations of the system operators during the permit procedures while ensuring the technical compatibility and the security, stability and functioning of the electricity system. Within the applicable deadlines, system operators should grant connection permits or agreements where capacity allows or, where capacity is insufficient, propose alternative solutions such as flexible connections, alternative connection points, or adjusted timelines. Refusal should remain a last resort where no viable option exists, including mitigation through non-market-based redispatch. Small-scale solar installations, storage and recharging stations or recharging pools should benefit from streamlined grid connection procedures, under appropriate conditions to ensure grid stability, reliability and safety.

RemovedDirective (EU) 2018/2001

Added(14a) A project developer’s request for a project to be connected to the grid is not a unilateral issuance of an administrative permit from the relevant authority to the project developer, but a two-sided agreement made between the project developer and the relevant authority, which encompasses several procedural steps starting from the project developer’s request for a connection to the grid accompanied by all documents required for the connection application and resulting in an agreement between the two parties on the conditions for a project to be connected to the grid.

RemovedArticle 1 – paragraph 1 – point 3, Article 15d – paragraph 4 – subparagraph 1 – point a a (new): (aa) provide information on citizens’ rights and on opportunities to participate in co-ownership schemes, through for instance renewable or citizens energy communities, where relevant.

Added(14b) The hybridisation of renewable energy plants has significant potential to contribute to improving energy system integration and to achieving the renewable energy targets by combining multiple renewable energy technologies, for example by adding an electrolyser or wind turbines to an existing solar photovoltaic installation or combining renewable production, including the production of biogas and biomethane, with storage or another source of renewable energy production. The hybridisation of plants exploits the synergies and complementarity of different renewable energy sources thereby ensuring a more stable energy supply and allowing to introduce flexibility to the energy system by combining generation and storage. Moreover, the combination of different renewable energy technologies or renewable energy with storage in existing sites allows to benefit from existing grid connections and necessary infrastructure and reduces the need for new land and overall environmental assessments of projects.

RemovedDirective (EU) 2018/2001

Added(14c) In addition to renewable energy projects, including energy storage and recharging stations and recharging pools, and related grid infrastructure, heat pumps are of crucial importance to ensure European energy independence, the electrification of European industry and households and reaching the Union’s energy and climate targets. Therefore, permit-granting procedures for heat pumps should also be accelerated while ensuring technical compatibility and safety. To ensure efficiency of the process, Member States should also ensure that, in jurisdictions where the concept of tacit approval exists under national law, it is applied to requests for installations of heat pumps below 50 MW.

RemovedArticle 1 – paragraph 1 – point 3, Article 15d – paragraph 4 – subparagraph 1 – point b: (b) engage to find solutions to address potential concerns raised by local communities, municipalities and other relevant local stakeholders, including, where relevant, concerns related to landscape, local socio-economic effects and public health.

Added(15) The Draghi report on EU competitiveness and the Action Plan for Affordable Energy recognise the positive impact of recent reforms to accelerate permit-granting procedures. However, they also highlight lengthy and uncertain permit-granting procedures for grids as a major obstacle to faster installation of necessary new capacity to accommodate clean energy investments and reduce energy costs in the EU. While there are specific rules on permit-granting procedures under Directive (EU) 2018/2001, Directive (EU) 2024/1788 of the European Parliament and of the Council and Regulation (EU) 2022/869 of the European Parliament and of the Council these regimes do not cover general electricity grid infrastructure assets. As such, general requirements on authorisation procedures for electricity transmission and distribution system infrastructure must be provided in Directive (EU) 2019/944, specifically in the form of requirements for Member States to ensure a maximum duration of such procedures and establishing requirements that support in meeting those deadlines. Regulation (EU) 2022/869 and Directive (EU) 2018/2001 contain rules for the authorisation of certain energy projects. In case of contradiction between those rules and the rules established in this Directive for the authorisation of certain electricity projects, the former should take precedence.

RemovedDirective (EU) 2018/2001

Added(15a) Grid connection queues have grown significantly in a number of Member States, with speculative and immature applications reserving capacity for projects that do not materialise, blocking viable projects and delaying the deployment of generation, storage and flexible demand needed for the energy transition. The European Parliament in its resolution of 19 June 2025 entitled ‘Electricity grids: the backbone of the EU energy system’ (2025/2006(INI)) stated that national regulatory authorities (NRAs) could benefit from clear legislative provisions as to how Member States can prioritise grid connections. The non-discrimination principle in Article 6 of Directive (EU) 2019/944 does not require Member States to apply a ‘first-come, first-served’ principle to the ordering of grid connection requests, and does not preclude the introduction of transparent and objective ordering frameworks, as clarified by the Commission in its Notice on guidance on efficient and timely grid connections (C/2025/6703). Member States should establish criteria for prioritizing connection requests having due regard to the recommendations by the Commission laid down in that Notice.

RemovedArticle 1 – paragraph 1 – point 3, Article 15d – paragraph 4 – subparagraph 2 a (new): Member States may rely on existing national procedures in place of the facilitator where they can demonstrate that such procedures are equally effective in ensuring independence, transparency, and meaningful participation, such as national, regional or local authorities with the necessary knowledge and skills serving as facilitators.

Added(15b) The lack of sufficient capacity in the transmission and distribution electricity grids in several Member States constitutes a serious bottleneck to the electrification and decarbonisation of European industry and households and to the Union’s efforts to ensure energy independence and affordability. Optimising the use of the Union’s electricity grids while ensuring the necessary expansion of the grids and deployment of recharging infrastructure, and energy storage are therefore crucial. Increasing the capacity of the Union’s electricity grid should be prioritised, as it supports electrification without prejudice to the technology mix contributing to the electricity system, thereby reflecting the principle of technological neutrality in the Union and providing benefits from streamlined procedures on an equal basis in all Member States, regardless of their national electricity mix.

RemovedDirective (EU) 2018/2001

Added(16) Lack of financial resources and staffing in national authorities and the reduced digitalisation of permit-granting procedures results in delays in the permitting of electricity system infrastructure and generation assets. Member States should ensure that such authorities have adequate human financial and technical resources, including skills, and digital management tools and systems that enable them to render decisions within the deadlines provided in the Directive. To that end, Member States should make effective use of relevant Union funds.

RemovedArticle 1 – paragraph 1 – point 4 – point b, Article 16 – paragraph 3a – subparagraph 1: Member States shall set up a single digital portal at national level for all the steps of the permit-granting procedures for renewable energy, storage, grid projects and recharging stations, serving as a single-entry point for applicants and ensuring the coordinated handling of applications across all competent authorities.

Added(16a) There is an urgent need to address labour shortages in the energy sector. The energy workforce must grow significantly by 2030 to support the deployment of renewables and grid expansion. In order to ensure adequate skilled staff, the Member States should rely on the Commission’s support in ensuring training, upskilling and reskilling in grid-related skills. National, regional and local authorities responsible for permit-grating procedures of electricity system infrastructure and generation assets are encouraged to map their future need for human financial and technical resources.

RemovedDirective (EU) 2018/2001

Added(17) The authorisation procedures under Directive (EU) 2019/944 should be clear, efficient and transparent and consistent with the fulfilment of existing distribution network development plan and the transmission ten-year network development plan. Thus, Member States are expected to lay down and publish objective and non-discriminatory criteria and procedures for authorisation that take into account amongst other things the safety and security of the electricity system, land use, energy efficiency, characteristics particular to the permit applicant, emission reductions, the importance to accelerate the deployment of energy infrastructure to reach climate neutrality, and alternatives to the project.

RemovedArticle 1 – paragraph 1 – point 4 – point b, Article 16 – paragraph 3a – subparagraph 1 a (new): Such a system shall be built, to the greatest extent possible, on existing national platforms and available data infrastructures, in order to avoid duplication, ensure efficiency and ensure interoperability with relevant administrative systems, including existing portals of system operators. It shall be designed to enable seamless communication between competent authorities through standardised interfaces.

Added(17a) The Commission notice on a guidance on anticipatory investments for developing forward-looking electricity networks of 6 June 2025 has identified the absence of distribution and transmission network development plans coordination as a source of inefficiency and increased risk of network bottlenecks and delays, while noting that further action was being considered under the Grids Package. Distribution and transmission network development plans should be developed at the same intervals and in close coordination, each taking into account the scenarios and assumptions of the other, so that anticipatory investments at one level are matched at the other and distribution-level developments are properly reflected in national network planning.

RemovedDirective (EU) 2018/2001

Added(17b) In Member States with fragmented distribution sectors a large number of integrated electricity undertakings operate distribution networks serving fewer than 100 000 connected customers and benefit from derogations under Articles 31, 32 and 35 of Directive (EU) 2019/944 from obligations to carry out network development planning, provide harmonised access to network data and facilitate access to flexibility services. According to ACER, almost two thirds of Union distribution system operators are exempt from preparing distribution network development plans. While this reflects the diversity of distribution sector structures across Member States, it means that in those Member States where small integrated undertakings predominate, a significant share of customers is served by networks that are structurally less visible to planning processes and less accessible to flexibility markets, precisely where renewable energy sources, storage, electrification and active demand are connecting at the fastest rate. Member States should ensure that appropriate arrangements are in place to enable integrated electricity undertakings, including but not limited to those benefiting from such derogations, to combine their resources and cooperate with one another in carrying out those tasks jointly to increase synergies and reduce burden while preserving the independence of the entity or arrangement concerned from supply and generation activities. Existing models in Member States, such as the cooperative arrangements established in Belgium between intermunicipal distribution system operators and their shared operating companies, demonstrate that such cooperation is operationally proven, compatible with public and municipal ownership structures, and capable of delivering the planning, data and flexibility functions required for the energy transition at local level.

RemovedArticle 1 – paragraph 1 – point 4 – point b, Article 16 – paragraph 3a – subparagraph 2: Member States shall ensure that permitting procedures are fully digital by default, using structured and machine-readable data formats and interoperable systems. Applicants shall submit permit applications and all relevant documents required for the permit-granting procedure only through the single digital portal. The single digital portal shall automatize the attribution of permit applications to the competent authorities, which shall process the relevant applications and documents in electronic form and interact with the applicants directly in the single digital portal. Access to the portal shall be granted to competent authorities and relevant project developers. Access to information contained therein shall be governed by applicable Union and national rules on public access to documents, ensuring the protection of commercially sensitive and other confidential information.

Added(17c) Transparency regarding the use of distribution network capacity is essential for identifying inefficiencies and unlocking additional connection capacity for generation and demand. Distribution system operators should be required to publish, at least once a year, information on reserved but unconnected injection and withdrawal capacity, on the actual use of connected distributed generation and energy storage facilities relative to their contracted capacity, and on the potential for making additional connection capacity available through more efficient use of the network. Where such information reveals significant potential for efficiency gains, the Member State concerned should adopt concrete measures to address the identified causes of inefficient use, following transparent consultation with all relevant system users.

RemovedDirective (EU) 2018/2001

Added(18) Given the urgency of developing electricity infrastructures, Member States are expected to ensure that authorisation procedures consider the characteristics of a project when assessing the need, or lack thereof, to conduct assessments, including environmental assessments, or produce studies, authorisations or reports. The competent national authorities should limit assessments and requests for information from promoters to the strictly necessary and avoid duplication in every instance possible.

RemovedArticle 1 – paragraph 1 – point 6 – point c, Article 16c – paragraph 4: 4. Where the repowering of wind energy installations increases the total capacity of the installation without the use of significant additional land surface and without significantly increasing the height of the existing wind installation, while complying with the applicable environmental mitigation measures established for the original wind energy installation, the project shall be exempt from any applicable requirements to carry out a screening process pursuant to Article 16a(4), to determine whether the project requires an environmental impact assessment pursuant to Article 4(2) of Directive 2011/92/EU or Article 5 of Regulation [xxxxx] of the European Parliament and of the Council, or to carry out an environmental impact assessment pursuant to Article 4(1) of Directive 2011/92/EU.’;

Added(19) To increase predictability and certainty over the duration and costs of authorisation procedures under Directive (EU) 2019/944, requests for information and documentation from applicants should be concrete, specific and contained in time. As such Member States should ensure that national authorities request the relevant information to issue the permit from applicants within a pre-specified period counted from when the application is received and concretely determine the content and detail of any information or data requested. After such period, requests for information should be limited to missing information that had been previously identified or requested by the authority, or information that could not be requested before due to the fact that it relates to a material change in circumstances taking place after the project applied for an authorisation.

RemovedDirective (EU) 2018/2001

Added(20) While respecting the principle of subsidiarity, national competences and procedures, Directive (EU) 2019/944 should set a clear time limit for the decision of the relevant authorities which stimulates an efficient definition and handling of procedures leading to the deployment of electricity grids. Nevertheless, Member States can strive to achieve shorter permit-granting procedures where feasible, specially as regards projects for refurbishment, modernisation or repowering of existing transmission system infrastructure and the construction of new distribution system infrastructure, which may not require as complex a permit-granting procedure as new transmission infrastructure.

RemovedArticle 1 – paragraph 1 – point 9, Article 16i – paragraph 2: 2. Member States shall not require any administrative permit, including on environmental aspects, with the exception of grid connection permits, for the installation of recharging stations with a total installed capacity of 150 kW or less. By way of derogation from Article 2(1) of Directive 2011/92/EU, the installation of those stations shall be exempt from the requirement, where applicable pursuant to Article 2(1) of that Directive, to carry out a dedicated environmental impact assessment. Member States shall restrict the application of this subparagraph in Natura 2000 areas and other areas under national protection schemes and cultural or historical heritage protected areas.

Added(21) In line with the urgency to optimise, upgrade, and deploy electricity grids to achieve the Union’s energy and climate goals and accompany deadlines for permit-granting procedures with measures that ensure their effectiveness in practice, Member States should ensure that, in jurisdictions where the concept of tacit approval exists under national law, it is applied to administrative decisions concerning electricity grid projects, with the exception of environmental decisions. To guarantee the rights of third parties to judicial protection, the relevant authorities should make public all decisions adopted, including those that were tacitly adopted.

RemovedDirective (EU) 2018/2001

Added(22) In order to reduce complexity, increase efficiency and transparency, and help enhance cooperation among Member States, there should be contact points for electricity transmission or distribution system operators promoting grids project or other network assets until a decision is rendered. These contact points will be responsible for facilitating and guiding applicants through the authorisation procedures associated with this type of infrastructure. In the spirit of simplification, if the Member State deems appropriate and more efficient it may concentrate this responsibility in the national competent authorities referred to in Article 8 of Regulation (EU) 2022/869, as these authorities already perform such role in what concerns the permitting of infrastructure projects of common interest and projects of mutual interest. In merging such roles, Member States should pay particular attention to ensure that the contact points are adequately staffed and enjoy the resources and capacity necessary to perform the tasks under their responsibility.

RemovedArticle 1 – paragraph 1 – point 9, Article 16i – paragraph 3: 3. Member States shall ensure that the permit-granting procedures, including grid connection permits and, where required, environmental assessments, shall not exceed six months for recharging stations with a total installed capacity above 150 kW.

Added(23) Due to their role integrating renewable energy assets, flexibility solutions, energy storage and enabling electrification in general, electricity transmission or distribution system infrastructure are essential to reach climate neutrality. Considering the key role of electricity system infrastructure to reach climate neutrality, in the necessary case-by-case assessments, Member States should presume electricity transmission or distribution system infrastructure, including on-shore power supply in ports to be of overriding public interest and serving public health and safety, except for in relation to where it is strictly necessary for the protection of cultural heritage ▌. Electricity transmission or distribution system infrastructure presumed to be of overriding public interest over non-environmental interests should be given priority over non-environmental interests and authorised as fast as possible.

RemovedDirective (EU) 2018/2001

Added(23a) In order to reach the Union’s energy and decarbonisation targets, including the Unions intermediate climate target for 2040 and the net-zero target by 2050, carbon capture utilisation and storage (CCUS) will play an important role in reducing emissions from hard to-abate sectors, as recognised in the Communication on a 2040 Climate Target by the Commission. However, a number of barriers to the development of the carbon capture and storage technology remain, including, in particular the cost of CCS, price signals, CO2 storage availability and maturity of the technology. To encourage the development of the carbon industry, the Commission will put forward a legislative initiative on CO2 transportation infrastructure and markets. As part of that initiative, it is expected that the Commission will prepare a comprehensive assessment of the role of permit-granting procedures for the necessary deployment of carbon infrastructure and storage, and in accordance with that assessment address any potential bottlenecks in the permit-granting procedures while ensuring safety and environmental integrity.

RemovedArticle 1 – paragraph 1 – point 10, Article 17 – paragraph 2 – introductory part: 2. Within the deadlines set out in Article 16a(1), Article 16b(1), Article 16h(3), Article 16i(3) and paragraph 1 of this Article, the system operator shall offer the following options, provided that it has received sufficient information from other relevant system operators on available capacity at connection points regardless of whether this is used for supply or feed-in:

Added(24) In order to speed up the deployment of electricity grids, it is appropriate to specify how the conditions for applying specific derogations as provided for in Union environmental legislation can be met. In particular, when assessing whether there are satisfactory alternative solutions to the electricity grid project, the scope of such assessment should be limited to alternative solutions that ensure the achievement of the same objective within the same or similar timeframe and without resulting in significantly higher costs. When comparing the timeframe and the cost of satisfactory alternative solutions, the relevant authorities should take into account the need to deploy grids in an accelerated and cost-effective manner in accordance with the priorities set out in their integrated national energy and climate plans and updates thereof submitted pursuant to Regulation (EU) 2018/1999. Similarly, when applying the relevant derogation provided for in Directive 92/43/EEC, it is appropriate that the relevant authorities may, in some justified cases where it can be reasonably demonstrated that the relevant plan or project would not affect irreversibly the ecological processes essential for maintaining the structure and functions of the site, that the overall coherence of the Natura 2000 network is not compromised, the environmental integrity of the site is preserved and that a high level of protection of the Natura 2000 sites is ensured, allow the compensatory measures to be carried out in parallel with the implementation of the plan and project.

RemovedDirective (EU) 2018/2001

Added(25) Due to the urgency in deploying energy infrastructure, the importance of streamlining authorisation procedures and the fact that environmental assessments represent the step with the longest duration in authorisation procedures, it matters to minimise such assessments without jeopardising the protection of the environment. The refurbishment, modernisation or repowering of existing transmission and distribution system infrastructure, and the construction of new distribution system infrastructure, are projects which generally entail minimal environmental impacts. Refurbishment, modernisation or repowering projects are routinely of limited size and affect only part of existing assets for which environmental impacts have been previously assessed. As a result, the impacts of such projects are often limited to those of construction works, with the operation of the asset having the same, or even a lesser, impact than the operation of the project it targeted. Distribution systems on the other hand, due to the smaller size of their projects, lower voltage of their assets and tendency to be developed in built areas closer to consumers tend not to have significant environmental impacts. As such, to accelerate the deployment of the electricity system infrastructure, enable the electrification of industry and digitalisation of the economy and achieve climate neutrality and renewable energy targets, Member States should be allowed to justifiably exempt, under certain conditions, the projects mentioned in this recital from environmental impact assessments and appropriate assessments and the assessment of their implications on species protection pursuant to Article 12(1) of Directive 92/43/EEC and to Article 5 of Directive 2009/147/EC.

RemovedArticle 1 – paragraph 1 – point 10, Article 17 – paragraph 2 – point a: (a) where there is sufficient grid capacity and the requested connection does not endanger grid stability, reliability and safety, the system operator shall accept the requested grid connection and grant the connection,

Added(25a) One of the environmental assessments contributing to long authorisation procedures when deploying electricity infrastructure is the assessment mandated under Directive 2000/60/EC. In order to significantly speed up the authorisation procedure without jeopardising the protection of the environment, transmission and distribution projects or parts thereof that are not in direct contact with the land or a water body, it should be possible for those projects to be exempted from these assessments, provided that mitigation measures constitute an inherent component of the project.

RemovedDirective (EU) 2018/2001

Added(26) The benefits of the deployment of electricity infrastructure, stand-alone energy storage, recharging station or recharging pools and hydrogen system infrastructure in terms of nitrogen emission reductions largely exceed the cost of the small and temporary emissions that result from their construction. As such, Member States should ensure that the quick deployment of electricity infrastructure is in no way limited by the temporary emissions that result from their construction.

RemovedArticle 1 – paragraph 1 – point 10, Article 17 – paragraph 2 – point b: (b) where there is insufficient grid capacity, the system operator shall propose, where technically possible, a flexible connection agreement in accordance with Article 6a of Directive (EU) 2019/944 or, on justified grounds of safety concerns or technical incompatibility of the system components, an alternative grid connection point, and an alternative provisional date for the grid connection.

Added(26a) Long-term planning for a decarbonised energy system requires coordination between electricity, gas and hydrogen networks, and carbon dioxide transport and storage infrastructure. As carbon dioxide infrastructure supports hydrogen production and can help industrial decarbonisation, future Union measures should take into consideration the long-term reduction of nitrogen associated with the construction of such infrastructure in a consistent manner with the permit-granting procedures set out in this Directive.

RemovedDirective (EU) 2018/2001

Added(27) National transmission network planning reflecting developments in climate and energy policy and related changes in consumption and generation is critical for success of a smart and cost-effective electrification and for achieving the national and Union energy targets as a whole. However, existing requirements under Article 51 of Directive (EU) 2019/944 only applied to certain transmission system operators and did not provide for sufficiently long period of planning to account for anticipatory investment. It is important that transmission system expansion consider at least fifteen years' time horizon, and considers with priority use of non-fossil flexibility, non-wire solutions and other alternatives to system expansion, is based on a joint scenario developed with other system operators across sectors and is aligned with the central scenario under the Union-wide ten-years network development plan. To ensure transparency and incorporate grid users, including generation, industry, data and transport sectors better in the network planning, link to Article 55 of Directive (EU) 2024/1788 also requires their early consultation during the joint scenario development process to allow anticipatory investment.

RemovedArticle 1 – paragraph 1 – point 10, Article 17 – paragraph 3: 3. Only where a proposal for an agreement referred to in paragraph 2, point (b), is rejected by the project developer, the system operator shall, on justified grounds reject the connection request.

Added(27a) The legally binding ‘energy efficiency first’ principle is to be applied consistently to grid infrastructure planning to maximise the use of existing grid infrastructure in the most cost-effective way. Grid-enhancing technologies, hardware and software solutions that increase the capacity and efficiency of transmission infrastructure can deliver 20 to 40% additional capacity gains using existing infrastructure.

RemovedDirective (EU) 2018/2001

Added(28) In view of the amendments to Directives (EU) 2018/2001 and (EU) 2019/944, as well as the parallel amendments to Regulation (EU) 2022/869, the Commission should introduce a unified approach to the permit-granting procedures of energy projects. While Directive (EU) 2024/1788 introduces measures to simplify and streamline administrative permit-granting procedures a targeted amendment is required to ensure a harmonised approach and that a consistent framework is deployed at the Union level.

RemovedArticle 1 – paragraph 1 – point 10, Article 17 – paragraph 4: 4. The lack of reply by the distribution system operator within the deadline established in paragraph 1, point (a), shall result in the connection permit being considered as granted for installations that already have an existing connection to the distribution grid, provided there are no technical incompatibilities of the system components and that the requested capacity of the new solar energy equipment, the energy storage or the recharging stations does not exceed the available existing capacity of the connection to the distribution grid. Where duly justified on the grounds of extraordinary circumstances proven to be beyond the control of the distribution system operator, they may extend the period by up to one month.

Added(29) Lack of resources in national authorities and the limited digitalisation of permitting procedures results in delays in the permitting of natural gas facilities, hydrogen production facilities, and hydrogen system infrastructure. Member States should ensure that such authorities have adequate human, financial and technical resources, including skills and digital management tools and systems that enable them to render decisions within the deadlines provided in the Directive. To that end, Member States should make effective use of relevant Union funds.

RemovedDirective (EU) 2019/944

Added(30) To increase predictability and certainty over the duration and costs of authorisation procedures under Directive (EU) 2024/1788, requests for information and documentation from applicants should be concrete, specific and contained in time. As such Member States should ensure that national authorities request the relevant information to issue the permit from applicants within a pre-specified period counted from when the application is received and concretely determine the content and detail of any information or data requested. After such period, requests for information should be limited to missing information that had been previously identified or requested by the authority, or information that could not be requested before due to the fact that it relates to a material change in circumstances taking place after the project applied for an authorisation.

RemovedArticle 2 – paragraph – point -1 (new), Article 2 – point 60 a (new): (-1) In Article 2, the following point is inserted: / "(60a) ‘anticipatory investment’ means investment that proactively addresses expected developments, looking beyond immediate needs of generation or demand, assuming with sufficient level of certainty that new generation and demand will materialise, notwithstanding potential low utilisation in the short term."

Added(31) Regarding approval procedures under Directive (EU) 2024/1788, in line with the importance of ensuring the quick deployment of hydrogen facilities and hydrogen system infrastructure and the fulfilment of the deadlines established in that Directive Member States should ensure that, in jurisdictions where the concept of tacit approval exists under national law, it is applied to administrative decisions concerning such projects, except for environmental decisions. To guarantee the rights of third parties to judicial protection, the relevant authorities should make public all decisions adopted, including those that were tacitly adopted.

RemovedDirective (EU) 2019/944

Added(32) In the spirit of simplification, Member States may deem appropriate and more efficient to centralise the role of a single contact point under the obligation of Directive (EU) 2024/1788 in the national competent authorities referred to in Article 8 of Regulation (EU) 2022/869, as these authorities already perform such role in what concerns the permit-granting procedures of infrastructure projects of common interest and projects of mutual interest. When opting to merge such roles, Member States should pay particular attention to ensure the contact points are adequately staffed and enjoy of the resources and capacity necessary to perform the tasks under their responsibility.

RemovedArticle 2 – paragraph 1 – point 1, Article 8 – paragraph 2 – subparagraph 1 a (new): To that end, Member States shall identify capacity and staffing needs in authorities responsible for electricity grid planning and permitting, including relevant national, regional and local authorities, and take appropriate measures to address identified gaps, including through targeted recruitment and the upskilling and reskilling of staff.

Added(33) To improve efficiency, Member States should ensure the availability of digital platforms that facilitate the management of authorisations.

RemovedDirective (EU) 2019/944

Added(33a) Where a closed distribution system is used to ensure the optimal efficiency of an integrated supply that requires specific operational standards, or where a closed or geographically confined distribution system is maintained primarily for the use of the owner of the system or transmits only a limited amount of energy to a limited number of customers it should be possible to exempt the distribution system operator from obligations which would constitute an unnecessary administrative burden because of the particular nature of the relationship between the distribution system operator and the system users. A complete exemption from network regulation should be possible in the case of geographically confined distribution systems, if they have no significance for ensuring effective and undistorted competition in the electricity supply and Article 4 is guaranteed. Industrial sites, residential areas, commercial sites or shared services sites such as train station buildings, airports, hospitals, large camping sites with integrated facilities, and chemical industry sites could include closed or confined distribution systems,

RemovedArticle 2 – paragraph 1 – point 1, Article 8 – paragraph 2 – subparagraph 1 b (new): The Commission shall evaluate the progress made by Member States and publish its assessment. In the absence of progress, the Commission may propose corrective measures to support Member States in their implementation by assisting them in reforming and streamlining their permitting procedures.

AddedHAVE ADOPTED THIS DIRECTIVE:

RemovedDirective (EU) 2019/944

AddedDirective (EU) 2018/2001 is amended as follows:

RemovedArticle 2 – paragraph 1 – point 1, Article 8 – paragraph 2 – subparagraph 1 c (new): Member States shall make effective use of funding available under the National and Regional Partnership Plans (NRPP) to support this measure. In addition, Member States shall promote and facilitate access for relevant stakeholders to funding available under the European Competitiveness Fund, in particular under the policy window ‘Clean Transition and Industrial Decarbonisation’, and for relevant skills initiatives, to support this measure.

Added(1) in Article 2, second paragraph, the following points (10a) to (10fd) are inserted:

RemovedDirective (EU) 2019/944

Added(10b) ‘stand-alone energy storage’ means energy storage that is not combined with an energy-producing facility recharging stations or recharging pools;

RemovedArticle 2 – paragraph 1 – point 1, Article 8 – paragraph 2 – subparagraph 1 d (new): Where appropriate, Member States may introduce proportionate, non-discriminatory mechanism, such as a fee, from project developers or transmission and distribution operators, to support administrative capacity for permitting provided that such mechanisms are designed to avoid cost-passing to end-consumers and be cost-effective for project developers and system operators economically dependent on decisions taken by the national authorities. The mechanism shall be set up without prejudice to the organisation of Member States administrative structures and the allocation of competences under national law. Where such mechanisms are applied to electricity projects, Member States shall ensure consistency with the treatment of other sectors subject to comparable permitting requirements.

Added(10c) ‘recharging station’ means a recharging station as defined in Article 2, point (52), of Regulation (EU) 2023/1804;

RemovedDirective (EU) 2019/944

Added(10ca) ‘recharging pool’ means a recharging pool as defined in Article 2, point (51), of Regulation (EU) 2023/1804.

RemovedArticle 2 – paragraph 1 – point 1, Article 8 – paragraph 3 a (new): 3a. National regulatory authorities (NRAs) shall ensure that the duration of their authorisation and remuneration methodology calculation procedures for proposed new distribution and transmission grid projects does not extend beyond the deadline set out in Article 8(3), point (b), applicable to authorisation procedures carried out by Member State authorities.

Added(10d) ‘hybridisation’ means the conversion of a renewable energy plant that is not a hybrid plant into a hybrid plant behind the same connection point or the conversion of a recharging station or recharging pool that is not a hybrid recharging station or hybrid recharging pool into a hybrid recharging station or recharging pool;

RemovedDirective (EU) 2019/944

Added(10e) ‘hybrid plant’ means a renewable energy plant that combines multiple renewable energy technologies, or that combines one or more renewable energy technologies with energy storage and that is connected to the same grid connection point;

RemovedArticle 2 – paragraph 1 – point 1, Article 8 – paragraph 8 – subparagraph 1: Until climate neutrality is achieved at Union level, Member States shall ensure that, in the necessary case-by-case assessments in the context of authorisation procedures, the planning, the construction and operation of transmission or distribution system infrastructure, including the refurbishment, modernisation, repowering and operations of existing grid infrastructure, are presumed as being in the overriding public interest and serving public health and safety when balancing legal interests in individual cases for the purposes of Article 6(4) and Article 16(1), point (c), of Directive 92/43/EEC, Article 4(7) of Directive 2000/60/EC and Article 9(1), point (a), of Directive 2009/147/EC. Member States may, in duly justified and specific circumstances, restrict the application to certain parts of their territory, to certain types of technology or to projects with certain technical characteristics.

Added(10f) ‘procedure for a grid connection permit’ or agreement means the result of the procedure from the project developer’s complete request for a connection to the grid up to the system operator’s decision on whether the project can be connected to the grid;

RemovedDirective (EU) 2019/944

Added(10fa) 'non-wire solutions' means 'non wire solutions' as defined in Article 2, point 19, of [TEN-E Regulation XX/XX];

RemovedArticle 2 – paragraph 1 – point 1, Article 8 – paragraph 9 – subparagraph 1 – introductory part: Until climate neutrality is achieved at Union level, by way of derogation from Article 2(1) and Article 4(1) and 4(2) of Directive 2011/92/EU and Annex I, point 20, and Annex II, point (3)(b), of that Directive, and by way of derogation from Article 6(3) of Directive 92/43/EEC, Member States shall ensure that the competent authority may, under justified circumstances, including the need to accelerate the deployment of the electricity system infrastructure to achieve climate neutrality and renewable energy targets, exempt the refurbishment, modernisation, or repowering of existing transmission and distribution system infrastructure, provided that such refurbishment, modernisation or repowering does not entail the use of significant additional land surface and the height of the wind installations is not significantly increased, and provided that the refurbishment, modernisation or repowering complies with the applicable environmental mitigation measures established for the original installation, from:

Added(10fb) 'related grid’ means transmission and/or distribution system infrastructure which is necessary to integrate electricity flows to or from plants, generation facilities or storage installations into the electricity system;

RemovedDirective (EU) 2019/944

Added(10fc) ‘hybrid recharging station’ means a recharging station that combines a recharging station with energy storage and that is connected to the same grid connection point;

RemovedArticle 2 – paragraph 1 – point 1, Article 8 – paragraph 11 a (new): 11a. When competent authorities assess whether the planning, construction and operation of transmission and distribution system infrastructure is expected to cause deterioration of a body of surface or groundwater under Directive 2000/60/EC, they shall take into consideration the fact that those projects are usually unlikely to result in such deterioration and thus impacts can be presumed to be neglected and projects may be exempted from the assessments under Article 4(1) of Directive 2000/60/EC, provided that mitigation measures constitute an inherent component of the project.

Added(10fd) ‘share of the benefits of renewable energy projects’ means the equitable proportionate redistribution of economic benefits generated throughout all stages of the project lifecycle to local communities hosting or affected by renewable energy installations, including financial or ownership-based forms, such as participation in energy communities, as well as in-kind mechanisms, or other form of contributions to the local economy;

RemovedDirective (EU) 2019/944

Added(2) in Article 15c, the following paragraphs are added:

RemovedArticle 2 – paragraph 1 – point 3, Article 40a – paragraph 2 a (new): 2a. The energy efficiency first principle shall be applied across all planning frameworks to maximise the use of existing grid infrastructure. Non-wire solutions and grid optimisation measures, such as grid enhancing technologies, reconductoring, and storage, shall therefore be duly assessed before grid expansion decisions are taken.

Added‘6. A Member State may designate areas restricting the installation of renewable energy plants and infrastructure, provided that this Member State has fulfilled the mapping obligation referred to in Article 15b and has designated sufficient land surface for renewables acceleration pursuant to paragraph 3 of this Article. Member States shall not designate large areas where the installation of renewable energy plants and their related infrastructure such as grid or storage facilities is legally or de facto restricted due to environmental reasons, including protection of landscape, unless they can demonstrate that those types of plants and their related infrastructure would result in irreversible damage in the area which cannot be mitigated or compensated for during the environmental assessment pursuant to Directive 2011/92/EU and, where relevant, the appropriate assessment pursuant to Article 6(3) of Directive 92/43/EEC. The existing restricted areas already designated before … [the date of entry into force of this amending Directive] shall be reviewed by Member States when carrying out the next periodically review pursuant to Article 15b(4) and, where the conditions set out in this paragraph are not met, shall be repealed or amended accordingly.

RemovedDirective (EU) 2019/944

Added7. In defined renewables acceleration areas, related electricity transmission or distribution infrastructure shall benefit from the same permit granting procedures as renewable energy sources.’;

RemovedArticle 2 – paragraph 1 – point 3, Article 40a – paragraph 4: 4. When elaborating the ten-year network development plan, the transmission system operator shall fully take into account the potential for the use of demand response, energy storage facilities, non-wire solutions or grid enhancing technologies or other resources as alternatives to system expansion, as well as expected consumption, trade with other countries and investment plans for Union-wide and regional networks.

Added(3) in Article 15d, the following paragraphs ▌are added:

RemovedDirective (EU) 2024/1788

Added‘3. Member States shall adopt measures to ensure that a proportionate share of the benefits of renewable energy projects with an installed capacity above 10 MW is passed on, directly or indirectly, to local citizens and communities in proximity to or otherwise affected by those projects. Renewable energy projects directly developed by citizens and renewable energy communities shall be exempted from the obligation of this paragraph.

RemovedArticle 3 – paragraph 1 – point 1 – point b, Article 8 – paragraph 5b – subparagraph 1 a (new): To that end, Member States shall identify capacity and staffing needs in authorities responsible for electricity grid planning and permitting, including relevant national, regional and local authorities, and take appropriate measures to address identified gaps, including through targeted recruitment and the upskilling and reskilling of staff.

Added3a. Member States shall identify the public likely to be affected by the renewable energy project and shall establish minimum standards for benefit sharing and appropriate criteria to assess the effectiveness of the measures referred to in paragraph 3.

RemovedDirective (EU) 2024/1788

Added3b. The Commission shall, within six months from … [the date of entry into force of this amending Directive], develop and issue guidelines on benefit sharing to support Member States or relevant regional authorities establishing standards and criteria taking into account existing best practices.

RemovedArticle 3 – paragraph 1 – point 1 – point b, Article 8 – paragraph 5b – subparagraph 1 b (new): The Commission shall evaluate the progress made by Member States and publish its assessment. In the absence of progress, the Commission may propose corrective measures to support Member States in their implementation by assisting them in reforming and streamlining their permitting procedures.

Added3c. Where it can be demonstrated that equally effective direct and indirect measures ensuring the sharing of the benefits are in place, the obligation referred to in paragraph 3 shall be considered fulfilled and no new measures need to be introduced.

RemovedDirective (EU) 2024/1788

Added4. Member States shall ensure that local communities have access to clear, accessible and reliable information on the permitting process, their rights and benefit sharing measures. Project developers and local communities shall engage with a view to reaching an agreement on benefit sharing measures related to the project. If such an agreement cannot be found, Member States designate and finance an independent facilitator to promote dialogue between the project developer and the general public for renewable energy projects with an installed capacity above 7 MW. The facilitator shall only intervene upon request by municipality, energy community or the project developer and shall:

RemovedArticle 3 – paragraph 1 – point 1 – point b, Article 8 – paragraph 5b – subparagraph 1 c (new): Member States shall make effective use of funding available under the National and Regional Partnership Plans (NRPP). In addition, Member States shall promote and facilitate access for relevant stakeholders to funding available under the European Competitiveness Fund in particular under the policy window ‘Clean Transition and Industrial Decarbonisation’ and for relevant skills initiatives, to support this measure.

Added(a) facilitate public consultations, as necessary, including early consultations during the phase prior to the permit application;

RemovedDirective (EU) 2024/1788

Added(b) engage to find solutions to address potential concerns raised by local communities and municipalities;

RemovedArticle 3 – paragraph 1 – point 1 – point b, Article 8 – paragraph 5b – subparagraph 1 d (new): Where appropriate, Member States may introduce proportionate and non-discriminatory mechanism, such as a fee, from project developers or transmission and distribution operators, to support administrative capacity for permitting provided that such mechanisms are designed to avoid cost-passing to end-consumers and be cost-effective for project developers and system operators economically dependent on decisions taken by the national authorities. The mechanism shall be set up without prejudice to the organisation of Member States administrative structures and the allocation of competences under national law. Where such mechanisms are applied to electricity projects, Member States shall ensure consistency with the treatment of other sectors subject to comparable permitting requirements.

Added(c) ensure support and transparency in the choice of the type of benefit sharing measure, where relevant.

RemovedArticle 4 – paragraph 1 – subparagraph 1: Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with this Directive by [one year after its adoption] at the latest. They shall forthwith communicate to the Commission the text of those provisions.

AddedMember States may set up a proportionate fee, paid by project developers, to finance the services of the facilitator. Member States may rely on alternative procedures in place of the facilitator where they can demonstrate that such procedures are fulfilling a similar function such as national, regional or local authorities with the necessary knowledge and skills serving as facilitators.’;

Added(4) Article 16 is amended as follows:

Added(a) in paragraph 3, the following sentence is deleted:

Added‘Applicants shall be allowed to submit relevant documents in digital form.’

Added(b) the following paragraph 3a is inserted:

Added‘3a. Member States shall set up a single digital portal at national level for all the steps of the permit-granting procedures for renewable energy, storage, grid projects, and recharging stations and recharging pools, serving as a single-entry point for applicants and ensuring the coordinated handling of applications across all competent authorities.

AddedMember States shall ensure that the single digital portal is interoperable with relevant administrative systems, including existing portals of system operators.

AddedMember States shall ensure that permit-granting procedures are fully digital by default, using structured and machine-readable data formats and interoperable systems. Applicants shall submit permit applications and all relevant documents required for the permit-granting procedure only through the single digital portal. Access to the single digital portal shall be granted to competent authorities and relevant project developers. Access to information contained therein shall be governed by applicable Union and national rules on public access to documents, ensuring the protection of commercially sensitive and other confidential information. The single digital portal shall automatize the attribution of permit applications to the competent authorities, which shall process the relevant applications and documents in electronic form and interact with the applicants directly in the single digital portal. The single digital portal shall include features allowing the applicant to be informed about all steps of the permit-granting procedure, including the respective obligations of the competent authorities and system operators involved the status of the procedure and of the decisions of the relevant authorities, and to check compliance with the permit-granting deadlines set in this Directive. The single digital portal shall ensure access to the relevant environmental and geological data and decisions available in the single digital geographic information system-based portal referred to in Article 10(3) of Regulation [xxxxx] of the European Parliament and of the Council.The single digital portal shall publish annual statistical data regarding the duration of permit-granting procedures, including, inter alia, the duration of permit-granting procedures for grid connection for new customers, clearly identifying the different steps of the permit-granting procedure and their duration. This data shall be publicly available, specified for every competent authority and system operator.

AddedMember States shall require the competent authorities and system operators to provide applicants in the single digital portal, at an early stage, with a comprehensive and exhaustive set of requirements for the submission of permit applications, including precise guidance on the documentation and information required for permit-granting procedures. To enhance predictability and reduce administrative burden, such guidance shall be presented in standardised formats, including structured requirement frameworks and procedural checklists, differentiated by connection type.

AddedThe single contact point or points referred to in paragraph 3 shall have access to all relevant data and information available in the portal, in order to perform its duties.

Added(5) Article 16b is amended as follows:

Added▌

Added(aa) in paragraph 2, the second subparagraph is replaced by the following:

Added‘The permit-granting procedure for the repowering of renewable energy power plants, for new installations with an electrical capacity of less than 300 kW and for co-located energy storage, as well as for the connection of such plants, installations and storage to the grid, located outside renewables acceleration areas shall not exceed 6 months, including with regard to environmental assessments where required by the relevant law. However, in the case of offshore renewable energy projects, the permit-granting procedure shall not exceed one year. Where duly justified on the ground of extraordinary circumstances, Member States may extend the six-month period by up to three months and the one-year period for offshore renewable energy projects by up to six months. Member States shall inform the project developer clearly of the extraordinary circumstances that justify such an extension.’

Added(b) the following paragraph 3 is added:

Added‘3. In the permit-granting procedure referred to in paragraph 1 and in paragraph 2, second subparagraph, Member States shall ensure that the lack of reply by the relevant competent authorities or entities within the established deadline results in the specific steps to be considered as approved, except for environmental decisions and grid connection permits or agreements, or where the principle of administrative tacit approval does not exist in the national legal system of the Member State concerned. All decisions shall be made publicly available, including final decisions granted tacitly.’;

Added(6) Article 16c is amended as follows:

Added(a) paragraph 1 is deleted;

Added(b) the following paragraph 2b is inserted:

Added‘2b. Member States shall ensure that a change in the status of the land where a renewable energy installation or electricity transmission or distribution system infrastructure is placed does not prevent that installation or infrastructure from being repowered, refurbished or modernised.’;

Added(ba) paragraph 3 is replaced by the following:

Added‘Where the refurbishment, modernisation or repowering of solar installations does not entail the use of significant additional space except for the temporary additional use of space needed during the works and complies with the applicable environmental mitigation measures established for the original solar installation, the project shall be exempt from any applicable requirements to carry out a screening process as provided for in Article 16a(4), to determine whether the project requires an environmental impact assessment, or to carry out an environmental impact assessment pursuant to Article 2(1) and Article 4 of Directive 2011/92/EU.

AddedMember States may, under justified circumstances, including the need to achieve climate neutrality and renewable energy targets, exempt the refurbishment, modernisation and repowering of solar installations from:

Added(a) an assessment of their implications for Natura 2000 sites pursuant to Article 6(3) of Directive 92/43/EEC;

Added(b) the assessment of their implications on species protection pursuant to Article 12(1) of Directive 92/43/EEC and to Article 5 of Directive 2009/147/EC;

Added(c) the screening pursuant to Article 5 of [Regulation xxxxx of the European Parliament and of the Council on speeding up environmental assessments].

AddedAny additional land use, including temporary land use, shall be limited to what is strictly necessary for the technical and functional requirements of the refurbishment, modernisation or repowering. Where a screening process or an environmental impact assessment is required for the repowering of the solar installations, such a process or impact assessment shall be limited to the potential impact arising from a change or extension compared to the original project.

AddedMember States shall restrict the application of this paragraph in Natura 2000 areas and other areas under national protection schemes and cultural or historical heritage protected areas.’

Added(c) the following paragraph 4 is added:

Added‘4. Where the refurbishment, modernisation or repowering of wind energy installations increases the total capacity of the installation without the use of significant additional land surface except for the temporary additional use of space needed during the works while complying with the applicable environmental mitigation measures established for the original wind energy installation, the project shall be exempt from any applicable requirements to carry out a screening process pursuant to Article 16a(4), to determine whether the project requires an environmental impact assessment pursuant to Article 4(2) of Directive 2011/92/EU or Article 5 of Regulation [xxxxx] of the European Parliament and of the Council, or to carry out an environmental impact assessment pursuant to Article 2(1) and Article 4(1) of Directive 2011/92/EU.

AddedMember States may, under justified circumstances, including the need to achieve climate neutrality and renewable energy targets, exempt the refurbishment, modernisation and repowering of wind energy installations from:

Added(a) an assessment of their implications for Natura 2000 sites pursuant to Article 6(3) of Directive 92/43/EEC;

Added(b) the assessment of their implications on species protection pursuant to Article 12(1) of Directive 92/43/EEC and to Article 5 of Directive 2009/147/EC;

AddedAny additional land use, including temporary land use, shall be limited to what is strictly necessary for the technical and functional requirements of the refurbishment, modernisation or repowering. Where a screening process or an environmental impact assessment is required for the refurbishment, modernisation or repowering of the wind energy installation, such a process or impact assessment shall be limited to the potential impact arising from a change or extension compared to the original project.

AddedMember States shall restrict the application of this paragraph in Natura 2000 areas and other areas under national protection schemes, and cultural or historical heritage protected areas.’;

Added(7) Article 16d is amended as follows:

Added(a) paragraph 1 is replaced by the following:

Added‘1. Member States shall ensure that the permit-granting procedure referred to in Article 16(1) for the installation of solar energy equipment and co-located energy storage with a total installed capacity above 200 kW in existing or future artificial structures, with the exclusion of artificial water surfaces, shall not exceed three months, provided that the primary aim of such artificial structures is not solar energy production or energy storage. By way of derogation from Article 4(2) of Directive 2011/92/EU and Annex II, points 3(a) and (b), alone or in conjunction with point 13(a), to that Directive, the installation of solar energy equipment and co-located energy storage referred to in paragraphs 1 and 2 of this Article shall be exempt from the requirement, where applicable, to carry out a dedicated environmental impact assessment pursuant to Article 2(1) of Directive 2011/92/EU .’;

Added(b) paragraph 2 is replaced by the following:

Added‘Member States shall not require any administrative permits, including on environmental aspects, with the exception of grid connection permits or agreements, for the installation of solar energy equipment and co-located energy storage with a total installed capacity of 200 kW or less. Without prejudice to paragraph 1, Member States shall restrict the application of this paragraph in Natura 2000 areas and other areas under national protection schemes and cultural or historical heritage protected areas. Member States shall monitor the application of this paragraph and shall take appropriate measures where there are objective indications that cumulation of installations benefiting from the exemption referred to in this paragraph give rise to likely significant adverse effects on the environment.’;

Added(c) the following paragraphs 3 and 4 are added:

Added‘3. Member States may exclude certain areas from the application of paragraphs 1 and 2 for the purpose of protecting cultural, historical heritage, national defense interests, or for safety or for grid security reasons.

Added4. Member States shall remove regulatory and non-regulatory barriers that affect the installation of plug-in mini-solar systems of up to 800 W capacity in and on buildings.’;

Added(7) In Article 16e, paragraph 1 is replaced by the following:

Added‘1. Member States shall ensure that the permit-granting procedure for the installation of heat pumps below 50 MW shall not exceed one month. However, in the case of ground source heat pumps, the permit-granting procedure shall not exceed three months. Member States shall ensure that the lack of reply by the relevant competent authorities or entities within the established deadlines in the permit-granting procedure results in the specific steps to be considered as approved.’

Added(8) Article 16f is replaced by the following:

Added▌

Added‘By 21 February 2024, until climate neutrality is achieved, Member States shall ensure that, in the permit-granting procedure, the planning, construction and operation of renewable energy plants, the connection of such plants to the grid, the related grid itself, and storage assets are presumed as being in the overriding public interest and serving public health and safety when balancing legal interests in individual cases for the purposes of Article 6(4) and Article 16(1), point (c), of Directive 92/43/EEC, Article 4(7) of Directive 2000/60/EC and Article 9(1), point (a), of Directive 2009/147/EC, Directive 2008/56/EC, in particular Article 14(1) point (d), thereof and Regulation (EU) 2024/1991, in particular Articles 4(14), 4(15), 5(11), 5(12) and Article 6(1) thereof.

AddedUntil climate neutrality is achieved, Member States shall ensure that, in the permit-granting procedure, the planning, construction and operation, refurbishment, modernisation, hybridisation and repowering of plants and installations for the production of energy from renewable sources, and their connection to the grid, including the injection of biomethane into the closest existing grid connection point, the related grid itself, storage assets, recharging stations and recharging pools are presumed as being in the overriding public interest and serving public health and safety and, in such cases, those projects shall be given priority when balancing legal interests other than those referred to in the first paragraph.

AddedMember States may exclude the application of this presumption only in duly justified cases where this is strictly necessary and proportionate for the purpose of protecting formally designated cultural heritage. Any such exclusion shall be based on clear, objective and proportionate legal criteria and shall not go beyond what is necessary to protect the cultural heritage.’;

Added(9) the following Articles 16g to 16k are inserted:

Added‘Article 16g Absence of alternative or satisfactory solutions and implementation of compensatory measures for the purpose of Article 6(4) of Directive 92/43/EEC

Added1. When assessing whether satisfactory alternative solutions to projects of renewable energy plants, the connection of such plants to the grid, the related grid itself and storage assets exist for the purposes of Articles 6(4) and 16(1) of Directive 92/43/EEC, Article 4(7), point (d), of Directive 2000/60/EC and Article 9(1) of Directive 2009/147/EC, the condition of having no satisfactory alternatives shall be fulfilled if there are no satisfactory alternative solutions capable of achieving the same objective of the project in question in terms of the development of the same renewable energy capacity through the same energy technology within the same or similar timeframe and without resulting in significantly higher costs.

Added2. When implementing compensatory measures for projects of renewable energy plants, the connection of such plants to the grid, the related grid itself and storage assets, for the purpose of Article 6(4) of Directive 92/43/EEC, Member States may, in justified cases and where it can be reasonably demonstrated that the plan or project would not irreversibly affect the ecological processes essential for maintaining the structure and functions of the site and compromise the overall coherence of the Natura 2000 network before compensatory measures are put into place, allow for such compensatory measures to be carried out in parallel with the implementation of the project . Member States shall allow for those compensatory measures to be adapted over time in accordance with the precautionary principle, depending on whether the significant negative effects are expected to arise in the short, medium or long term.

AddedArticle 16h Permit-granting procedure for stand-alone energy storage other than hydrogen storage

Added1. The permit-granting procedure for stand-alone energy storage, other than hydrogen storage, shall cover all relevant administrative permits to build, repower and operate stand-alone storage, including grid connection permits or agreements and, where required, environmental assessments and permits. The permit-granting procedure shall comprise all administrative stages from the acknowledgment of the completeness of the permit application to the notification of the final decision on the outcome of the permit-granting procedure by the relevant competent authority or authorities. Within 30 days of receipt of an application for a permit, the competent authority shall acknowledge the completeness of the application or, if the applicant has not sent all the information required to process the application, request that the applicant submit a complete application without undue delay. The date of acknowledgement of the completeness of the application by the competent authority shall serve as the start of the permit-granting procedure.

Added2. Member States shall not require any administrative permit, including environmental ones, with the exception of grid connection permits or agreements for the installation of stand-alone storage, other than hydrogen storage, with a total installed capacity of 200 kW. By way of derogation from Article 2(1) of Directive 2011/92/EU, the installation of that storage shall be exempt from the requirement applicable pursuant to Article 2(1) of that Directive, to carry out a dedicated environmental impact assessment. Member States shall restrict the application of this subparagraph in Natura 2000 areas and other areas under national protection schemes and cultural or historical heritage protected areas. Member States shall monitor the application of this paragraph and shall take appropriate measures where there are objective indications that cumulation of installations benefiting from the exemption referred to in this paragraph give rise to likely significant adverse effects on the environment.

Added3. Member States shall ensure that the permit-granting procedures, including grid connection permits or agreements and, where required, environmental assessments, shall not exceed six months for stand-alone energy storage, other than hydrogen storage, with a total installed capacity above 200 kW. However, in the case of pumped hydropower storage, the permit-granting procedure shall not exceed two years.

Added3a. The planning, construction and operation of stand-alone energy storage other than hydrogen storage, necessary to integrate renewable energy into the electricity system, shall be presumed to contribute to a long-term reduction of nitrogen emissions and shall not require an assessment of nitrogen emissions in an assessment that may be carried out to comply with Article 6 of Council Directive 92/43/EEC.

Added1. The permit-granting procedure for recharging stations or recharging pools shall cover all relevant administrative permits to build, repower and operate recharging stations including grid connection permits and, where required, environmental assessments and permits. The permit-granting procedure shall comprise all administrative stages from the acknowledgment of the completeness of the permit application to the notification of the final decision on the outcome of the permit-granting procedure by the relevant competent authority or authorities. Within 30 days of receipt of an application for a permit, the competent authority shall acknowledge the completeness of the application or, if the applicant has not sent all the information required to process the application, request that the applicant submit a complete application without undue delay. The date of acknowledgement of the completeness of the application by the competent authority shall serve as the start of the permit-granting procedure.

Added2. Member States shall not require any administrative permit, including on environmental aspects, with the exception of grid connection permits or agreements, for the installation of recharging stations or recharging pools which share the same grid connection point with a total installed capacity of 200 kW or less. By way of derogation from Article 2(1) of Directive 2011/92/EU, the installation of those stations shall be exempt from the requirement, where applicable pursuant to Article 2(1) of that Directive, to carry out a dedicated environmental impact assessment. Member States shall restrict the application of this subparagraph in Natura 2000 areas and other areas under national protection schemes and cultural or historical heritage protected areas. Member States shall monitor the application of this paragraph and shall take appropriate measures where there are objective indications that cumulation of installations benefiting from the exemption referred to in this paragraph give rise to likely significant adverse effects on the environment.

Added2a. Member States shall not require any administrative permit or agreement, including on environmental aspects, with the exception of grid connection permits, for the installation of recharging pools with a total installed capacity of 1MW or less in existing or future artificial structures, provided that the primary aim of such artificial structures is not the installations of recharging stations or recharging pools, such as existing petrol stations or parkings. By way of derogation from Article 2(1) of Directive 2011/92/EU, the installation of those stations shall be exempt from the requirement to carry out a dedicated environmental impact assessment. Member States shall restrict the application of this paragraph in Natura 2000 areas and other areas under national protection schemes and cultural or historical heritage protected areas.

Added3. Member States shall ensure that the permit-granting procedures, including grid connection permits and, where required, environmental assessments, shall not exceed six months for recharging stations or recharging pools which share the same grid connection point with a total installed capacity above 200 kW.

Added3a. The planning, construction and operation of recharging stations shall be presumed to contribute to a long-term reduction of nitrogen emissions and shall not require an assessment of nitrogen emissions in an assessment that may be carried out to comply with Article 6 of Council Directive 92/43/EEC

AddedArticle 16j Permit-granting procedure for the hybridisation of renewable energy plants or recharging stations or recharging pools

Added1. Where the hybridisation of a renewable energy power plant, including biogas and biomethane plants, or a recharging station or a recharging pool is subject to a screening process pursuant to Article 16a(4), to a determination whether the project requires an environmental impact assessment or to an environmental impact assessment pursuant to Article 4 of Directive 2011/92/EU, such a screening process, determination or environmental impact assessment shall be limited to the potential impact arising from the addition compared to the original project.

Added2. In cases of change of the use status of land on which renewable energy projects or recharging stations or recharging pools are installed, Member States shall ensure that the operation and hybridisation of those renewable energy projects, including the biogas and biomethane plants, can still occur.’;

Added(10) Article 17 is replaced by the following:

Added‘Article 17 Procedures for grid connection permits or agreements

Added1. Member States shall ensure that the procedures for the grid connection permit or agreement do not exceed:

Added(a) three months for the solar energy equipment and co-located energy storage referred to in Articles 16d(2), the stand-alone energy storage referred to in Article 16h(2), and the recharging stations or recharging pools referred to in Article 16i(2);

Added(aa) three months for the recharging stations or recharging pools referred to in Article 16i(2a);

Added(b) three months for the installation of the solar energy equipment and co-located energy storage referred to in Article 16d(1), and the repowering or hybridisation of existing renewable energy plants referred to in Articles 16c and 16j, unless there are justified safety concerns or there is technical incompatibility of the system components or, if due to the size of the capacity increase, more time is required to carry out the assessment;

Added(ba) six months for installations referred to in Article 16a(1) and nine months for offshore renewable energy projects in renewable acceleration areas; nine months for installations referred to in Article 16b(1) and one year for offshore wind energy projects outside renewable acceleration areas;

Added2. Within the deadlines set out in Articles 16h(3), 16i(3) and paragraph 1 of this Article, the system operator shall offer the following options provided that it has received sufficient information from relevant transmission system operators on available capacity at connection points regardless of whether such information is used for supply or feed-in:

Added(a) where there is sufficient grid capacity and the requested connection does not endanger grid stability, reliability and safety, the system operator shall accept the requested grid connection and shall grant the connection, or

Added(b) where there is insufficient grid capacity, or with the consent of the applicant, the system operator shall, where technically possible and on justified grounds of safety concerns, offer simultaneously a flexible connection agreement in accordance with Article 6a of Directive (EU) 2019/944, an alternative grid connection point and an alternative provisional date for the grid connection.

Added2a. System operators shall ensure that the data underpinning their decisions is transparent and comprehensible, in accordance with Articles 31(3) and 40(1)(g) of Directive (EU) 2019/944.

Added3. Only where a proposal for an agreement referred to in paragraph 2, point (b), is rejected by the project developer, and where requested connection would endanger the security of grid operations in a manner that cannot be mitigated through non-market-based redispatch, or where there is technical incompatibility among system components, the system operator may reject the connection request.

Added4. The lack of decision by the distribution system operator within the deadline established in paragraph 1, point (a), shall result in the connection permit being considered as granted for installations that already have an existing connection to the distribution grid,provided there are no technical incompatibilities of the system components and that the requested capacity of the new solar energy equipment, the energy storage or the recharging stations does not exceed the available existing capacity of the connection to the distribution grid. Where duly justified on the grounds of extraordinary circumstances proven to be beyond the control of the distribution system operator, they may extend the period by up to one month.

Added4a. Where a full grid connection capacity pursuant to paragraph 2 cannot be provided by the system operator, the system operator shall take all reasonable solutions to improve flexibilisation, optimisation and digitalisation of the grid or reinforce the grid without undue delay, in line with current and anticipated overall demand.

AddedDirective (EU) 2019/944 is amended as follows:

Added(-1) in Article 2, the following point is added:

Added‘(60a) ‘anticipatory investment’ means investment that proactively addresses expected developments, looking beyond immediate needs of generation or demand, assuming with sufficient level of certainty that new generation and demand will materialise, notwithstanding potential low utilisation in the short term;’

Added(-1a) in Article 6, the following paragraph is added:

Added‘3a. By … [6 months from the date of entry into force of this amending Directive] Member States shall establish clear, transparent, and predictable criteria for prioritising connection requests from projects seeking access to the electricity grid, covering both transmission and distribution networks across all voltage levels, to be adopted and applied by the relevant system operators.

AddedWhen establishing those criteria, Member States shall take into account the recommendation by the Commission laid down in its Guidance on efficient and timely grid connections (C/2025/6703).’;

Added(1) Article 8 is replaced by the following:

Added‘Article 8 Authorisation procedure

Added1. In circumstances where an authorisation, such as a licence, permission, concession, consent or approval, is required for the construction or operation, refurbishment, modernisation or repowering of transmission or distribution system infrastructure for electricity, or associated equipment, or for the construction of new generating capacity, Member States, or any competent authority they designate, or, where applicable, regional governments shall grant such authorisation in accordance with paragraphs 2 to 14. Member States or any competent authority they designate may also grant authorisations on the same basis for the supply of electricity and for wholesale customers.

Added2. Member States that implement a system of authorisation shall:

Added(a) establish objective transparent and non-discriminatory criteria, along with transparent procedures, which must be satisfied by any undertaking seeking authorisation to construct and/or operate new generating capacity, as well as transmission or distribution system infrastructure.

Added(b) make public the criteria and procedures for granting authorisations and any amendments thereto;

Added(c) ensure that authorisation procedures for such generation capacity, and infrastructure, or associated equipment, take into account the importance of the project for the internal markets for electricity and renewable energy sources, where appropriate;

Added(d) ensure that authorisation procedures take into account the necessity, or lack thereof, for conducting assessments in accordance with Council Directive 92/43/EEC and Directives 2000/60/EC, 2001/42/EC, 2009/147/EC, Directive 2011/92/EU;

Added(e) ensure the existence of specific, simplified and streamlined authorisation procedures for small decentralised and/or distributed generation including renewable energy communities and citizens energy communities and distribution system infrastructure, taking into account their limited size and potential impact;

Added(f) ensure that guidelines for those specific authorisation procedures are established and revised by regulatory authorities or other competent national authorities, including planning authorities, which may recommend amendments;

Added(g) ensure that all decisions are made publicly available;

Added(h) ensure applicants are informed of the reasons for any refusal to grant an authorisation. That these reasons are objective, non-discriminatory, well-founded and duly substantiated, and that appeal procedures are made available to applicants;

Added(i) ensure that competent national authorities have adequate technical, financial and human resources to render a decision, on the authorisation within the applicable timeframes;

AddedTo that end, Member States shall identify capacity and staffing needs in authorities responsible for electricity grid planning and permitting, including relevant national, regional and local authorities, and shall take appropriate measures to address any gaps identified, including through targeted recruitment and the upskilling and reskilling of staff.

AddedThe Commission shall evaluate the progress made by Member States and publish its evaluation. In the absence of progress, the Commission may propose measures to support Member States in their implementation by assisting them in reforming and streamlining their permitting procedures.

Added3. Where Member States implement a system of authorisation for transmission or distribution system infrastructure for electricity, Member States shall also:

Added(a) ensure consistency of the system of authorisation for transmission and distribution system infrastructure with the distribution network development plan and the transmission ten-year network development plan adopted pursuant to Articles 32 and 40a;

Added(b) ensure that authorisation procedures, including all relevant procedures of the competent authorities, do not exceed one year for distribution system infrastructure, and two years for transmission system infrastructure, except when duly justified on the grounds of extraordinary circumstances, where they may be extended by up to six months for distribution system infrastructure and by up to one year for transmission system infrastructure;

Added(c) ensure that the lack of reply by the competent national authorities or entities within the deadline established in point b results in the specific steps to be considered as approved, except for the environmental decisions and where the principle of administrative tacit approval does not exist in the national legal system of the Member State concerned;

Added(d) ensure that the publication of final decisions includes decision granted tacitly following the lack of reply by the relevant competent authorities or entities;

Added(e) ensure that the authorisation of transmission or distribution system infrastructure is regarded as essential for the integration of renewable energy resources, as well as for achieving climate and energy targets and the objective of climate neutrality.

Added3a. National regulatory authorities (NRAs) shall ensure that the duration of their authorisation procedures and remuneration methodology calculation procedures for proposed new distribution and transmission grid projects does not extend beyond the deadline set out in paragraph 3, point (b), applicable to authorisation procedures carried out by competent authorities.

Added4. Member States shall establish or designate one or more contact points for transmission or distribution system operators. Those contact points shall, upon the applicant’s request and free of charge, provide guidance to the applicant and facilitate the entire authorisation procedure for the activities referred to in paragraph 1, up to the final decision by the responsible authorities. The applicant shall not be required to contact more than one contact point for the entire process.

AddedThe contact points may be the same as the national competent authorities referred to in Article 8 of Regulation (EU) 2022/869 or the contact points referred to in Article 16 of Directive (EU) 2018/2001.

Added5. Where Member States implement a system of authorisation for transmission or distribution system infrastructure for electricity, Member States shall ensure that, where any studies, reports and documentation required for the procedure are missing from the applications, the competent national authorities, in cooperation with other relevant authorities, request the necessary materials from the developer, specifying their scope and level of detail, within three months from the application. Within the same three-month period, the national competent authority shall inform the developer whether the presumptions under paragraph 10 do not apply to the project. After that period, neither the competent authority nor any other relevant authority shall request additional information, studies, reports or assessments, except in cases where a material change has occurred to the project or its surrounding environment, rendering the initial criteria upon which determinations were based no longer appropriate. Where such material change has occurred the national competent authority shall provide the project promoter with a well-reasoned justification for the request for additional information.

Added6. The time limit established in paragraph 3 of this Article shall apply without prejudice to obligations under applicable Union law, including Directive (EU) 2018/2001, to judicial appeals, remedies and other proceedings before a court or tribunal, and to alternative dispute resolution mechanisms, including complaints procedures, non-judicial appeals and remedies, and may be extended for the duration of such procedures.

Added7. This Article shall apply without affecting Articles 7 to 10 of Regulation (EU) 2022/869 and Article 15 and Articles 15b to 17 of Directive (EU) 2018/2001.

Added8. Until climate neutrality is achieved at Union level, Member States shall ensure that, in the necessary case-by-case assessments in the context of authorisation procedures, the planning, the construction and operation of transmission or distribution system infrastructure including the refurbishment, modernisation and repowering of existing grid infrastructure are presumed as being in the overriding public interest and serving public health and safety when balancing legal interests in individual cases for the purposes of Article 6(4) and Article 16(1), point (c), of Directive 92/43/EEC, Article 4(7) of Directive 2000/60/EC and Article 9(1), point (a), of Directive 2009/147/EC, Directive 2008/56/EC, in particular Article 14(1) point (d), thereof and Regulation (EU) 2024/1991, in particular Articles 4(14), 4(15), 5(11), 5(12) and Article 6(1) thereof. Member States shall ensure that those projects are also given priority when balancing legal interests other than those referred to in this paragraph. Member States may exclude the application of this presumption only in duly justified cases where this is strictly necessary and proportionate for the purpose of protecting formally designated cultural heritage. Any such exclusion shall be based on clear, objective and proportionate legal criteria and shall not go beyond what is necessary to protect the cultural heritage.

Added9. Until climate neutrality is achieved at Union level, by way of derogation from Article 2(1) and Article 4(1) and 4(2) of Directive 2011/92/EU and Annex I, point 20, and Annex II, point (3)(b), of that Directive, and by way of derogation from Article 6(3) of Directive 92/43/EEC, Member States shall ensure that the competent authority may, under justified circumstances, including the need to accelerate the deployment of the electricity system infrastructure to achieve climate neutrality and renewable energy targets, exempt the refurbishment, modernisation, or repowering of existing electricity transmission and electricity distribution system infrastructure, provided that such refurbishment, modernisation or repowering does not entail the use of significant additional land surface, except for the temporary additional use of space needed during the works, and the height of the electricity transmission and distribution system infrastructure is not significantly increased, and provided that the refurbishment, modernisation or repowering complies with the applicable environmental mitigation measures established for the original installation, from:

Added(a) the environmental impact assessment pursuant to Article 2(1) of Directive 2011/92/EU;

Added(b) an assessment of their implications for Natura 2000 sites pursuant to Article 6(3) of Directive 92/43/EEC;

Added(c) the assessment of their implications on species protection pursuant to Article 12(1) of Directive 92/43/EEC and to Article 5 of Directive 2009/147/EC;

Added(d) the screening pursuant to Article 5 of Regulation [xxxxx] of the European Parliament and of the Council.

AddedAny additional land use, including temporary land use, shall be limited to what is strictly necessary for the technical and functional requirements of the refurbishment, modernisation, or repowering of existing electricity transmission and distribution system infrastructure. Where a screening process, determination or an environmental impact assessment is required for such refurbishment, modernisation or repowering, such screening, determination or impact assessment shall be limited to the potential impact arising from a change or extension compared to the original project.

AddedThose exemptions shall not apply to the refurbishment, modernisation or repowering of existing transmission and distribution system infrastructure, and the construction of new distribution system infrastructure, or associated equipment, which are likely to have significant effects on the environment in another Member State, in accordance with Article 7 of Directive 2011/92/EU.

AddedMember States shall restrict the application of this paragraph in Natura 2000 areas and other areas under national protection schemes and cultural or historical heritage protected areas.

Added10. Under justified circumstances, Member States may also apply the exemptions referred to in paragraph 9 to the construction of new electricity distribution infrastructure or associated equipment, provided that the relevant project has undergone a screening in accordance with Directive with Article 4(2) of Directive 2011/92/EC whereby the competent national authority has ascertained that the project is not likely to have a significant environmental impact, notably in view of the particularities of the area in which the project is deployed, such as urban and densely built areas.

AddedThose exemptions shall not apply to the construction of new distribution infrastructure or associated equipment, which are likely to have significant effects on the environment in another Member State, in accordance with Article 7 of Directive 2011/92/EU.

AddedWhere the screening referred to in the first subparagraph identifies a likely significant environmental impact, the competent authority shall inform the project developer within 30 days from the application that an assessment referred to in points (a), (b) and (c) of paragraph 9 is required.

AddedMember States shall restrict the application of this paragraph in Natura 2000 areas and other areas under national protection schemes and cultural or historical heritage protected areas.

Added11. The planning, construction and operation of transmission and distribution system infrastructure shall be presumed to contribute to a long-term reduction of nitrogen emissions and shall not require an assessment of nitrogen emissions in an assessment that may be carried out to comply with Article 6 of the Council Directive 92/43/EEC.

Added11a. Where competent authorities assess whether the planning, construction and operation of transmission and distribution system infrastructure are expected to cause deterioration of a body of surface or groundwater under Directive 2000/60/EC, they shall take into consideration the fact that those transmission and distribution projects or parts thereof that are not in direct contact with the land or a water body, including overhead transmission and distribution system infrastructure projects are usually unlikely to result in such deterioration and thus impacts can be presumed to be negligible and projects may be exempted from the assessments under Article 4(1) of Directive 2000/60/EC, provided that mitigation measures constitute an inherent component of the project.

Added12. An environmental impact assessment in accordance with Directive 2011/92/EU, and, where applicable, an appropriate assessment under Directive 92/43/EEC, for a project for the extension, refurbishment, modernisation or repowering of existing transmission or distribution system infrastructure, shall be limited to evaluating the potential impact arising from the changes or extensions compared to the original transmission or distribution system infrastructure.

Added13. To manage authorisations within the meaning of paragraph 1, Member States shall ensure that digital platforms are in place to manage applications, the associated process, and ongoing decisions.

AddedThose platforms shall provide access to the relevant environmental and geological data and decisions available in the central online portal referred to in Article 10(3) of Regulation [xxxxx] of the European Parliament and of the Council.’;

Added(2) the following Article 8a is inserted:

Added‘Article 8a Absence of alternative or satisfactory solutions and implementation of compensatory measures for the purpose of Article 6(4) of Directive 92/43/EEC

Added14. When assessing whether satisfactory alternative solutions to transmission or distribution system infrastructure projects, and associated equipment, exist for the purposes of Articles 6(4) and Article 16(1) of Directive 92/43/EEC, Article 4(7), point (d), of Directive 2000/60/EC and Article 9(1) of Directive 2009/147/EC, the condition of having no satisfactory alternatives shall be fulfilled where there are no satisfactory alternative solutions capable of achieving the same objective of the project in question, in terms of the development of the same capacity through the same technology within the same or similar timeframe and without resulting in significantly higher costs.

Added15. When implementing compensatory measures for transmission or distribution system infrastructure projects, and associated equipment, for the purpose of Article 6(4) of Directive 92/43/EEC, Member States may, in justified cases and where it can be reasonably demonstrated that the plan or project would not irreversibly affect the ecological processes essential for maintaining the structure and functions of the site and would compromise the overall coherence of the Natura 2000 network before compensatory measures are put into place, allow for such compensatory measures to be carried out in parallel with the implementation of the project. Member States may allow for those compensatory measures to be adapted over time in accordance with the precautionary principle, depending on whether the significant negative effects are expected to arise in the short, medium or long term.’;

Added(2a) in Article 38, the following paragraph is added:

Added‘5. Member States may provide that distribution systems limited to a specific industrial, commercial, shared services, or residential area (confined distribution systems) shall not be considered distribution systems for the purpose of this Directive if the rights pursuant to Article 4 are guaranteed and at least one of the following conditions is fulfilled:

Addeda) the system is non-discriminatorily made available to all customers free of charge and electricity is primarily distributed to the operator of the system or their related undertakings and only a subordinate percentage of electricity is distributed to other customers, including households, or

Addedb) the system is non-discriminatorily made available to all customers free of charge and only a limited amount of energy is yearly distributed to a limited number of customers including households.’;

Added(3) the following Article 40a is inserted:

Added‘Article 40a Network development and powers to make investment decisions

Added1. At least every two years, all transmission system operators shall submit to the regulatory authority or any other competent authority of a Member State a ten-year network development plan based on existing and forecast supply and demand after having consulted all the relevant stakeholders, in accordance with paragraph 2, point (c). That network development plan shall contain efficient measures in order to guarantee the adequacy of the system security of supply, energy independence, energy affordability and achievement of the national energy and climate plans submitted in accordance with Regulation (EU) 2018/1999. The transmission system operator shall publish the ten-year network development plan on its website.

AddedMember States shall endeavour to ensure coordinated planning steps of the respective ten-year network development plans for natural gas, hydrogen and electricity.

Added2. The ten-year network development plan shall in particular:

Added(a) indicate to market participants the main transmission infrastructure that needs to be built or upgraded over the next ten years and next fifteen years, considering the potential of anticipatory investments to accommodate future system needs;

Added(b) consider with priority use of non-fossil flexibility resources pursuant to Regulation (EU) 2019/943, non-wire solutions pursuant to a Regulation on guidelines for trans-European energy infrastructure and other alternatives to system expansion;

Added(c) be based on a joint scenario developed every two years pursuant to Article 55 of Directive (EU) 2024/1788 of the European Parliament and the Council, which shall be consistent with Article 11 of a Regulation on guidelines for trans-European energy infrastructure [TEN-E Regulation as proposed by COM(2025)xxxx] and any sensitivities developed in accordance with a Regulation on guidelines for trans-European energy infrastructure;

Added(d) be in line with the integrated national energy and climate plan and its updates, take into account the state of play in the integrated national energy and climate plans submitted in accordance with Regulation (EU) 2018/1999, be consistent with targets set by Directive (EU) 2018/2001, follow the application of the energy efficiency first principle in accordance with Article 27 of Directive (EU) 2023/1791 and support the climate-neutrality objective set out in Article 2(1) and Article 4(1) of Regulation (EU) 2021/1119 of the European Parliament and of the Council;

Added(e) contain all the investments already decided and identify new investments which have to be executed in the next three years;

Added(f) provide for a time frame for all investment projects;

Added(fa) include an estimate of labour needs, including training, reskilling and upskilling.

AddedWith regard to anticipatory investments referred to in point (a) of the first subparagraph, such investment shall be justified by expected long-term system benefits and subject to regulatory scrutiny.

Added2a. The energy efficiency first principle shall be applied across all planning frameworks to maximise the use of existing grid infrastructure. Non-wire solutions and grid optimisation measures, such as grid enhancing technologies, reconductoring and storage shall therefore be duly assessed before grid expansion decisions are taken.

Added3. New infrastructure projects shall be accompanied by an explanation how non-wired solutions, non-fossil flexibility resources or other alternatives to system expansion were taken into account.

Added4. When elaborating the ten-year network development plan, the transmission system operator shall fully take into account the potential for the use of demand response, energy storage facilities, non-wire solutions or grid enhancing technologies or other resources as alternatives to system expansion, as well as expected consumption, trade with other countries and investment plans for Union-wide and regional networks.

Added5. The regulatory authority shall consult all actual or potential system users on the ten-year network development plan in an open and transparent manner. Persons or undertakings claiming to be potential system users may be required to substantiate such claims. The regulatory authority shall publish the result of the consultation process, in particular possible needs for investments.

Added6. The regulatory authority shall approve or request the amendment of the ten-year network development plan and examine whether the ten-year network development plan covers all investment needs identified during the consultation process, and whether it is consistent with the non-binding Union-wide ten-year network development plan (‘Union-wide network development plan’) referred to in of Article 30(1), point (b), of Regulation (EU) 2019/943. Where any doubt arises as to the consistency with the Union-wide network development plan, the regulatory authority shall consult ACER. The regulatory authority may require the transmission system operator to amend its ten-year network development plan.

AddedThe competent national authorities shall examine the consistency of the ten-year network development plan with the national energy and climate plan submitted in accordance with Regulation (EU) 2018/1999.

Added7. The regulatory authority shall monitor and evaluate the implementation of the ten-year network development plan.

Added8. In circumstances where the independent system operator, or independent transmission operator, other than for overriding reasons beyond its control, does not execute an investment, which, under the ten-year network development plan, was to be executed in the following three years, Member States shall ensure that the regulatory authority is required to take at least one of the following measures to ensure that the investment in question is made where such investment is still relevant on the basis of the most recent ten-year network development plan:

Added(a) to require the transmission system operator to execute the investments in question;

Added(b) to organise a tender procedure open to any investors for the investment in question; or

Added(c) to oblige the transmission system operator to accept a capital increase to finance the necessary investments and allow independent investors to participate in the capital.

Added9. Where the regulatory authority has made use of its powers under paragraph 8, point (b), it may oblige the transmission system operator to agree to one or more of the following:

Added(a) financing by any third party;

Added(b) construction by any third party;

Added(c) building the new assets concerned itself;

Added(d) operating the new asset concerned itself.

AddedThe transmission system operator shall provide the investors with all information needed to realise the investment, shall connect new assets to the transmission network and shall generally make its best efforts to facilitate the implementation of the investment project.

AddedThe relevant financial arrangements shall be subject to approval by the regulatory authority.

Added10. Where the regulatory authority has made use of its powers under paragraph 8, the relevant tariff regulations shall cover the costs of the investments in question.’;

Added(4) Article 51 is deleted.

Added(5) in Article 59(1), the following points are inserted:

Added‘(bb) approving and requesting the amendment of the ten-year network development plans referred to in Article 40a.

Added‘(bba) ensuring that system operators are provided with efficient financial incentives to meet the obligations and objectives set out by this Directive, in particular with respect to the interests of parties seeking network connections, including, but not limited to, the facilitation and maximisation of connections for generators and consumers.’

AddedDirective (EU) 2024/1788 is amended as follows:

Added(1) Article 8 is amended as follows:

Added(a) paragraph 1 is replaced by the following:

Added‘1. In circumstances where an authorisation, such as a licence, permission, concession, consent or approval, is required for the construction or operation of natural gas facilities, hydrogen production facilities, and hydrogen system infrastructure, Member States or any competent authority they designate, shall grant authorisations to build or operate such facilities, infrastructure, pipelines or associated equipment within their territory, in accordance with paragraphs 2 to 11 and paragraph 16. Member States or any competent authority they designate, may also grant authorisations on the same basis for the supply of natural gas and hydrogen and for wholesale customers.’;

Added(b) the following paragraphs 5a to 5da are inserted:

Added‘5a. Member States shall ensure that, where any studies, reports, or documentation required for the procedure are missing from the applications, the competent national authorities, in cooperation with other relevant authorities concerned, request the necessary materials from the developer, specifying their scope and level of detail, within three months of the application.

AddedAfter that period, neither the competent authority nor any other relevant authority concerned shall request additional information, studies, reports, or assessments, except in cases where a material change has occurred to the project or its surrounding environment, rendering the initial criteria on which determinations were based no longer appropriate. In such instances, the national competent authority shall provide the project promoter with a well-reasoned justification for the request for additional information.

Added5b. Member States shall ensure that competent national authorities are equipped with adequate technical, financial and human resources to render a decision on the authorisation within the timeframe specified in paragraph 5.

AddedTo that end, Member States shall identify capacity and staffing needs in authorities responsible for electricity grid planning and permitting, including relevant national, regional and local authorities, and shall take appropriate measures to address any gaps identified, including through targeted recruitment and the upskilling and reskilling of staff.

AddedThe Commission shall evaluate the progress made by Member States and publish its evaluation. In the absence of progress, the Commission may propose corrective measures to support Member States in their implementation by assisting them in reforming and streamlining their permitting procedures.

Added5c. In the authorisation procedure referred to in paragraph 1 concerning hydrogen production facilities and hydrogen system infrastructure, Member States shall ensure that the lack of reply by the relevant competent national authorities within the deadline referred to in paragraph 5 results in the specific steps to be considered as approved, except for the environmental decisions and where the principle of administrative tacit approval is not recognised in the national legal system of the Member State concerned.

Added5d. All decisions shall be made publicly available, including final decisions granted tacitly following the lack of reply by the relevant competent authorities.

Added5da. The planning, construction and operation of hydrogen system infrastructure shall be presumed to contribute to a long-term reduction of nitrogen emissions and shall not require an assessment of nitrogen emissions in an assessment that may be carried out to comply with Article 6 of Council Directive 92/43/EEC.’;

Added(c) in paragraph 8, the following subparagraph is added:

Added‘The contact points may be the same as the national competent authorities referred to in Article 8 of Regulation (EU) 2022/869, or the contact points defined under Article 16 of Directive (EU) 2018/2001.’;

Added(d) the following paragraph 16 is added:

Added‘16. To manage authorisations within the meaning of paragraph 1 of this Article, Member States shall ensure the digital platforms are in place to handle applications, the associated process, and ongoing decision. Those platforms shall provide access to the relevant environmental and geological data and decisions available in the central online portal referred to in Article 10(3)▌.

Added1. Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with this Directive by [one year after its adoption] ▌. They shall forthwith communicate to the Commission the text of those provisions.

AddedWhen Member States adopt those provisions, they shall contain a reference to this Directive or be accompanied by such a reference on the occasion of their official publication. Member States shall determine how such reference is to be made.

Added2. Member States shall communicate to the Commission the text of the main provisions of national law which they adopt in the field covered by this Directive.

AddedThis Directive shall enter into force on the day of its publication in the Official Journal of the European Union.

AddedThis Directive is addressed to the Member States.

AddedDone at Brussels,

AddedFor the European Parliament For the Council

AddedThe President The President

Sources & citation

Where the facts on this page come from, and how to cite it.

Data source
Licensed CC BY 4.0.
Retrieved
25 September 2026

Cite as

European Parliament (2026). “Changes between ITRE-PR-785274 and A-10-2026-0195”. Text, 3 July 2026. from ITRE-PR-785274, to A-10-2026-0195. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/ITRE-PR-785274/compare/A-10-2026-0195 (retrieved 25 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2026-07-03,
  author = {{European Parliament}},
  title = {{Changes between ITRE-PR-785274 and A-10-2026-0195}},
  year = {2026},
  date = {2026-07-03},
  howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/ITRE-PR-785274/compare/A-10-2026-0195}},
  url = {https://news.eu-parl.st-solutions.dev/texts/ITRE-PR-785274/compare/A-10-2026-0195},
  urldate = {2026-09-25},