Text · Comparison of two versions
Changes from report parliamentary committee draft to plenary report
ITRE-PR-749242 → A-9-2023-0275
- From
- ITRE-PR-749242 report parliamentary committee draft of 15 Jun 2023
- To
- A-9-2023-0275 Plenary report of 25 Sept 2023
- Changes
- Not comparable
- Paragraphs
- +293 added · −64 removed · 5 changed
More facts (2)
- Title (from)
- on the proposal for a regulation of the European Parliament and of the Council on measures to reduce the cost of deploying gigabit electronic communications networks and repealing Directive 2014/61/EU (Gigabit Infrastructure Act)
- Title (to)
- on the proposal for a regulation of the European Parliament and of the Council on measures to reduce the cost of deploying gigabit electronic communications networks and repealing Directive 2014/61/EU (Gigabit Infrastructure Act)
These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.
Every difference
The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.
Part 1 of 8: DRAFT EUROPEAN PARLIAMENT LEGISLATIVE RESOLUTION
DRAFT EUROPEAN PARLIAMENT LEGISLATIVE RESOLUTION
7 unchanged paragraphs
on the proposal for a regulation of the European Parliament and of the Council on measures to reduce the cost of deploying gigabit electronic communications networks and repealing Directive 2014/61/EU (Gigabit Infrastructure Act)
(COM(2023)0094 – C90028/2023 – 2023/0046(COD))
(Ordinary legislative procedure: first reading)
The European Parliament,
– having regard to the Commission proposal to Parliament and the Council (COM(2023)0094),
– having regard to Article 294(2) and Article 114 of the Treaty on the Functioning of the European Union, pursuant to which the Commission submitted the proposal to Parliament (C90028/2023),
– having regard to Article 294(3) of the Treaty on the Functioning of the European Union,
Changed– having regard to the opinion of the European Economic and Social Committee of ...12 ,July 2023,
– having regard to Rules 59 of its Rules of Procedure,
Changed– having regard to the report of the Committee on Industry, Research and Energy (A90000/2023),(A9-0275/2023),
1. Adopts its position at first reading hereinafter set out;
2. Calls on the Commission to refer the matter to Parliament again if it replaces, substantially amends or intends to substantially amend its proposal;
3. Instructs its President to forward its position to the Council, the Commission and the national parliaments.
Change 1
RemovedTitle: on measures to reduce the cost of deploying gigabit electronic communications networks, amending Regulation (EU) 2015/2120 and repealing Directive 2014/61/EU (Gigabit Infrastructure Act).
AddedAMENDMENTS BY THE EUROPEAN PARLIAMENT*
RemovedRecital 1: (1) The digital economy has been changing the internal market profoundly over the last decade. The Union’s vision is a digital economy that delivers sustainable economic and social benefits based on excellent and secure connectivity for everybody and everywhere in Europe, while helping to achieve Union target for climate neutrality by 2050. A high-quality digital infrastructure based on very high capacity networks underpins almost all sectors of a modern and innovative economy. It is of strategic importance to social and territorial cohesion and overall for the Union’s competitiveness and digital leadership. Therefore, people as well as the private and public sectors should have the opportunity to be part of the digital economy.
Addedto the Commission proposal
RemovedRecital 2: (2) The rapid evolution of technologies, the exponential growth in broadband traffic and the increasing demand for advanced very high-capacity connectivity have further accelerated during the COVID-19 pandemic. As a result, the targets laid down in the Digital Agenda in 201031 have mostly been met, but they have also become obsolete. The share of households having access to 30 Mbps internet speeds has increased from 58.1% in 2013 to 90% in 2022. Availability of only 30 Mbps is no longer future-proof and not aligned with the new objectives set in Directive (EU) 2018/1972 of the European Parliament and of the Council32 for ensuring connectivity and widespread availability of very high capacity networks. Therefore, in the Decision (EU) 2022/2481 of the European Parliament and Council33 , the EU set updated targets for 2030 that better correspond to the expected connectivity needs of the future where all European households should be covered by a gigabit network, with all populated areas covered by next-generation wireless high-speed networks with a performance of at least equivalent to that of 5G.
Added---------------------------------------------------------
RemovedAlignment with the Digital Decade targets as provided by the Decision (EU) 2022/2481.
Added2023/0046 (COD)
RemovedRecital 3: (3) To achieve those targets, there is a need for policies to speed up, simplify and lower the costs of the deployment of very high-capacity fixed and wireless networks across the Union, including proper planning, coordination and the reduction of administrative burdens.
AddedProposal for a
RemovedRecital 6: (6) A major part of the costs of deploying very high capacity networks can be attributed to inefficiencies in the roll-out process related to: (i) the use of existing passive infrastructure (such as ducts, conduits, manholes, cabinets, poles, masts, antenna installations, towers and other supporting constructions); (ii) bottlenecks related to the coordination of civil works carried out by network operators or public authorities; (iii) burdensome and lengthy administrative procedures to grant permits; and (iv) bottlenecks in in-building deployment of networks, which lead to high financial barriers, particularly in rural areas.
AddedREGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
RemovedRecital 9: (9) Measures aiming to make using public and private existing infrastructures more efficient and reduce costs and obstacles in carrying out new civil engineering works should contribute substantially to ensuring a fast and extensive deployment of very high capacity networks, in particular in rural, remote or scarcely populated areas or in transport corridors. These measures should maintain effective competition without harming the safety, security and smooth operation of the existing infrastructure.
Addedon measures to reduce the cost of deploying gigabit electronic communications networks, amending Regulation (EU) 2015/2120 and repealing Directive 2014/61/EU (Gigabit Infrastructure Act)
RemovedRecital 10: (10) Some Member States have adopted measures to reduce the costs of broadband roll-out, including by going beyond the provisions of Directive 2014/61/EU. However, those measures are still very different across Member States and have led to different results across the Union. Scaling up some of those measures across the Union and taking new reinforced measures could significantly contribute to the better functioning of the digital single market. Moreover, differences in regulatory requirements and inconsistent implementation of Union rules sometimes prevent cooperation across utility companies. The differences may also raise barriers to entry for new undertakings providing or authorised to provide public electronics communications networks or associated facilities, as defined in Directive (EU) 2018/1972 (‘operators’). These differences may also close off new business opportunities, hindering the development of an internal market for the use and deployment of physical infrastructures for very high capacity networks. Moreover, the measures notified in the national roadmaps and implementation reports adopted by Member States under Commission Recommendation (EU) 2020/130735 neither cover all the areas of Directive 2014/61/EU nor address all issues in a consistent and complete manner. This is despite how essential it is to take action across the whole roll-out process and across sectors to achieve a coherent and significant impact. Member States should be encouraged to continue im…
AddedTHE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,
RemovedRecital 11: (11) This Regulation aims to strengthen and harmonise rights and obligations applicable across the Union to accelerate the roll-out of very high capacity networks and cross-sector coordination. Due to the persistent fragmentation of electronic communications markets in individual national markets, undertakings providing or authorised to provide electronic communications networks are unable to achieve economies of scale. This can have a strong downstream effect on cross-border trade and services provision, since many services can only be provided where an adequately performant network is in place across the Union. While ensuring an improved level playing field, this Regulation does not prevent national measures in compliance with Union law that serve to promote the joint use of existing physical infrastructure or enable a more efficient deployment of new physical infrastructure by complementing the rights and obligations laid down in this Regulation. For example, Member States could shorten the deadlines to grant permits necessary for deployment, extend provisions on civil works coordination also to privately funded projects or require that more information on physical infrastructure or planned civil works is provided to a single information point in electronic format, or expand the provisions on access to existing physical infrastructure to privately owned buildings, provided that they do not violate Union law including the provisions of this Regulation.
AddedHaving regard to the Treaty on the Functioning of the European Union, and in particular Article 114 thereof,
RemovedRecital 14: (14) To improve the deployment of very high capacity networks in the internal market, this Regulation should lay down rights for undertakings providing public electronic communications networks or associated facilities (including undertakings of a public nature) to access physical infrastructure regardless of its location under fair and reasonable terms consistent with the normal exercise of property rights. At the same time, it is important to ensure that the access providers have a fair return on investment, which reflects the relevant market conditions and, in particular in the case of providers of associated facilities, their different business models. Therefore, the access price offered by providers of associated facilities may be assumed to be fair and reasonable when they operate as a wholesale only model which offers only passive access to more than one host public electronic communications operator at comparable conditions. In cases where access is provided through a contract agreed before the date of entry into force of this Regulation, and the price has already been negotiated and agreed, or included in the contract, the price should not be required to comply with fair and reasonable terms. The obligation to give access to the physical infrastructure should be without prejudice to the rights of the owner of the land or of the building in which the infrastructure is located.
AddedHaving regard to the proposal from the European Commission,
RemovedRecital 15: (15) In particular, taking into account the fast development of providers of wireless physical infrastructure such as ‘tower companies’, and their increasingly significant role as providers of access to physical infrastructure suitable to install elements of wireless electronic communications networks, such as 5G, the definition of ‘network operator’ should be extended beyond undertakings providing or authorised to provide electronic communications networks and operators of other types of networks, such as transport, gas or electricity, to include undertakings providing associated facilities, which thus become subject to all the obligations and benefits set out in the Regulation, except the provisions regarding in-building physical infrastructure and access. In order to ensure continuity of service and predictability for the planned deployments of associated facilities, owners of land where associated facilities have been or will be installed, should be required to negotiate access to land with undertakings providing or authorised to provide those associated facilities under fair and reasonable terms and conditions, including price, in accordance with national contract law.
AddedAfter transmission of the draft legislative act to the national parliaments,
RemovedRecital 17: (17) In the absence of a justified exception, physical infrastructure elements owned or controlled by public sector bodies or any entity exclusively entrusted with performing tasks on their behalf, even when they are not part of a network, can also host electronic communications network elements and should be made accessible to facilitate installing network elements of very high capacity networks, in particular wireless networks. Examples of physical infrastructure elements are buildings, entries to buildings, and any other asset, including street furniture, such as light poles, street signs, traffic lights, billboards, bus and tramway stops and metro stations. It is for Member States to identify specific buildings owned or controlled by public sector bodies in their territories where access obligations cannot apply, for example, for reasons of architectural, historical, religious or natural value. In order to bridge the digital coverage gap between rural and urban areas, and to ensure connectivity in remote and scarcely populated areas, in limited situations, the requirements to provide access to existing physical infrastructure should be extended to commercial buildings under one of the following conditions: there is no very high capacity network deployed in the area and there is no proven plan that it will be deployed within a year from the moment of when the network operator intends to request access; there is no available existing physical infrastructure in the area owne…
AddedHaving regard to the opinion of the European Economic and Social Committee,
RemovedRecital 20: (20) To ensure proportionality and preserve investment incentives, a network operator or public sector body should have the right to refuse access to specific physical infrastructure for objective and justified reasons. In particular, a physical infrastructure for which access has been requested could be technically unsuitable due to specific circumstances, or because of lack of currently available space or future needs for space that are sufficiently demonstrated, for instance, in publicly available investment plans. To ensure proportionality and preserve investment incentives, a network operator or public sector body may refuse access to specific physical infrastructure. To avoid any potential distortion of competition or any possible abuse of the conditions to refuse access, any such refusal should be duly justified and based on objective and detailed reasons. For example such reasons would not be considered objective where an undertaking providing or authorised to provide electronic communications networks has deployed physical infrastructure thanks to civil works coordination with a network operator other than an electronic communications network operator and refuses to grant access based on an alleged lack of availability of space to host the elements of very high capacity networks which results from decisions made by the undertaking under its control. In such case, a competition distortion could arise if there is no other VHCN in the area concerned by the access reques…
AddedHaving regard to the opinion of the Committee of the Regions,
RemovedRecital 23: (23) Public sector bodies that own or control physical infrastructure may lack sufficient resources, experience or the necessary technical knowledge to engage in negotiations with operators on access. To facilitate access to these public sector bodies’ physical infrastructure, a body should be appointed to coordinate the access requests, provide legal and technical advice for negotiating access terms and conditions, and make relevant information on such physical infrastructure available via a single information point. The coordinating body should also support public sector bodies in preparing model contracts and monitor the outcome and the length of time of the access requests process. The body could also help if disputes arise on access to physical infrastructure that public sector bodies own or control.
AddedActing in accordance with the ordinary legislative procedure,
RemovedRecital 24: (24) To ensure consistency of approaches among Member States, the Commission, in close cooperation with the Body of European Regulators for Electronic Communications (BEREC), should provide guidance on applying the provisions on access to physical infrastructure, including but not only on the application of fair and reasonable conditions. The views of stakeholders and national dispute settlement bodies should be duly taken into account in the preparation of the guidance. In order to avoid market disruptions and reverse effects in investments, when establishing the guidelines on a fair and reasonable price, the Commission should take into account the features of the network operators and their business model, in particular when it is based on renting infrastructure to third parties, such as tower companies or wholesale only operators as well as determine criteria for the establishment of prices for different categories of infrastructure.
AddedWhereas:
RemovedRecital 25: (25) Operators should have access to minimum information on physical infrastructure and civil works planned by a network operator or, in specific cases, such as road construction relevant for the deployment of very high capacity network, by a public body in the area of deployment. The Commission should issue guidelines on the type of public civil works and information that is to be made available to facilitate deployment of very high capacity networks. This will enable them to effectively plan deploying very high capacity networks and ensure the most effective use of existing physical infrastructure, suitable for rolling out such networks, and planned civil works. Such minimum information is a pre-requisite to assess the potential for using existing physical infrastructure or coordinating the planned civil works in a specific area, as well as to reduce damage to any existing physical infrastructures. In view of the number of stakeholders involved (covering publicly and privately financed civil works as well as existing or planned physical infrastructure) and to facilitate access to that information (across sectors and borders), the network operators and public sector bodies subject to transparency obligations should provide and maintain such minimum information via a single information point. This will simplify managing requests to access such information and enable operators to express their interest in accessing physical infrastructure or coordinating civil works, for which…
Added(1) The digital economy has been changing the internal market profoundly over the last decade. The Union’s vision is a digital economy that delivers sustainable economic and social benefits based on excellent, reliable and secure connectivity for everybody and everywhere in Europe including in rural, remote and scarcely populated regions as well as in transport corridors. A high-quality digital infrastructure based on very high capacity networks underpins almost all sectors of a modern and innovative economy. It can provide for innovative services, more efficient business operations and smart, sustainable, digital societies, while contributing to achieving the Union climate targets set in the Commission communication of 11 December 2019 entitled ‘the European Green Deal’ and the twin digital and green transitions envisaged as the Union’s main priorities. It is of strategic importance to social and territorial cohesion and overall for the Union’s competitiveness, resilience, strategic autonomy and digital leadership. Digitalisation has a profound impact on the every-day social, economic, political and cultural life of all people in the Union. In that regard, limited access and insufficient network expansion can deepen social inequalities, thus creating a new digital divide between people who are able to benefit fully from an efficient and secure digital connectivity, allowing them to access a wide range of services, and people who are unable to do so. In that regard, the roll-out of very high capacity networks in rural, remote and scarcely populated regions, as well as in social housing, should be a priority for public and private investment projects, as a key aspect of social inclusion. Therefore, people as well as the private and public sectors should have the opportunity to be part of the digital economy.
RemovedRecital 28: (28) Advanced transparency of planned civil works via single information points should be incentivised. This can be done by easily redirecting operators to such information whenever available. Transparency should also be enforced by making permit-granting applications subject to prior publication of information on civil works planned by network operators via a single information point.
Added(2) The rapid evolution of technologies, the exponential growth in broadband traffic and the increasing demand for advanced very high-capacity connectivity have further accelerated during the COVID-19 pandemic. As a result, the targets laid down in the Digital Agenda in 2010 have mostly been met, but they have also become obsolete. The share of households having access to 30 Mbps internet speeds has increased from 58.1% in 2013 to 90% in 2022. Availability of only 30 Mbps is no longer future-proof and not aligned with the new objectives set in Directive (EU) 2018/1972 of the European Parliament and of the Council for ensuring connectivity and widespread availability of very high capacity networks. Therefore, in the Decision (EU) 2022/2481 of the European Parliament and Council, the EU set updated targets for 2030 that better correspond to the expected connectivity needs of the future where all European households should be covered by a gigabit network, with all populated areas covered by next-generation wireless high-speed networks with a performance of at least equivalent to that of 5G.
RemovedRecital 35: (35) In some cases, in particular for deployments in rural, remote or scarcely populated areas, the obligation on network operators to coordinate civil works might put at risk the financial viability of such deployments and eventually disincentivize investments carried out under market terms. Therefore, a request to an undertaking providing or authorised to provide public electronic communications networks to coordinate civil works might be considered unreasonable under specific circumstances. This should be the case, in particular, if the requesting undertaking providing or authorised to provide electronic communications networks did not state its intention to deploy very high capacity networks in that area (either as a new deployment, an upgrade or an extension of a network) and there had been a forecast or invitation to declare an intention to deploy very high capacity networks in designated areas (pursuant to Article 22 of Directive (EU) 2018/1972) or a public consultation under Union State aid rules. If more than one of those forecasts, invitations and/or public consultations have occurred, only the lack of an expression of interest at the most recent occasion covering the period during which the request for coordination of civil works is made should be considered. To ensure the possibility to access the deployed infrastructure in the future, the undertaking providing or authorised to provide public electronic communications networks performing the civil works should gua…
Added(3) To achieve those targets, there is a need for policies to speed up, simplify and lower the costs of the deployment and use of very high-capacity fixed and wireless networks across the Union, including proper planning, enhanced coordination and setting-up of nationwide simplified and streamlined permit procedures as a way of reducing of administrative burdens on both operators and national administrations.
RemovedRecital 38: (38) A number of different permits for deploying elements of electronic communications networks or associated facilities may be necessary in order to protect national and Union general interests. These can include digging, building, town planning, environmental and other permits as well as rights of way. The number of permits and rights of way required for deploying different types of electronic communications networks or associated facilities and the local character of the deployment could involve applying different procedures and conditions, which can cause difficulties in the network deployment. Therefore, to facilitate deployment, all rules on the conditions and procedures applicable to granting permits and rights of way should be streamlined and consistent at national level. In order to reduce the administrative burden and ensure shorter timeframes for the permit-granting procedure, where multiple competent authorities are involved in the granting of a number of different permits and rights of way associated to one request, Member States should assign a single coordination body. That body should be tasked to facilitate the coordination between the various competent authorities involved, through different mechanisms, including through joint coordination procedures such as on-site visits, while preserving the right of each competent authority to be involved and maintain its decision-making prerogatives in accordance with the subsidiarity principle. The information on the p…
Added(3a) Blending space and terrestrial infrastructure is important for the connectivity roll-out to better prepare for the next wave of digital infrastructure enabling the Union to take the lead. Recent technical progress has allowed satellite based communications constellations to emerge and gradually offer high-speed and low latency connectivity services, enable connectivity across the Union and around the globe, for citizens and business, including, but not limited to, providing access to affordable high-speed broadband that can help remove communication dead zones and increase cohesion across the Union, including its outermost regions, rural, remote and scarcely populated areas. In that regard, the resources provided by Regulation (EU) 2023/588 of the European Parliament and of the Council, and in particular the potential commercial internet access capabilities of the future satellite constellation should be included in the planning and deploying of very high capacity fixed and wireless networks across the Union and contribute, where possible, to the deployment of very high capacity networks.
RemovedRecital 39: (39) Permit-granting procedures should not be barriers to investment or harm the internal market. Member States should therefore ensure that a decision on whether or not to grant permits on the deployment of elements of very high capacity networks or associated facilities is made available within three months from the receipt of a complete permit request. In exceptional, duly substantiated cases, the competent authority could extend the three-month deadline for a further period of up to three months. This is without prejudice to other specific deadlines or obligations laid down for the proper conduct of the procedure, which are applicable to the permit-granting procedure in accordance with national or Union law. Competent authorities should not restrict, hinder or make the deployment of very high capacity networks or associated facilities economically less attractive. Specifically, they should not prevent procedures for granting permits and rights of way from proceeding in parallel, where possible, or require operators to obtain one type of authorisation before they can apply for other types of authorisations. Competent authorities should justify any refusal to grant permits or rights of way under their competence, based on objective, transparent, non-discriminatory and proportionate conditions. In exceptional, duly substantiated cases, where, for reasons beyond their control, the network operators are not able to perform works within the validity period of the granted permit…
Added(4) Directive 2014/61/EU, which was adopted in response to the need for policies to lower the costs of broadband deployment, included measures on infrastructure sharing, civil works coordination and the reduction of administrative burdens. To further facilitate the roll-out of very high capacity networks, including fibre and 5G, the European Council, called in its Conclusions on Shaping Europe’s Digital Future of 9 June 2020, called for a package of additional measures to support current and emerging network deployment needs, including by reviewing Directive 2014/61/EU.
RemovedRecital 40: (40) To avoid undue delays, competent authorities must determine the completeness of the permit request within 15 days from its receipt. The permit request should be deemed complete unless the competent authority invites the applicant to provide any missing information within that period. For reasons of equal treatment and transparency, the competent authorities should not consider permit requests for civil works to be admissible if the minimum information required under this Regulation has not been made available via a single information point within three months before the first permit request is submitted to the competent authorities. Where, in addition to permits, rights of way are required for deploying elements of very high capacity networks, competent authorities should, by way of derogation from Article 43 of Directive (EU) 2018/1972, grant such rights of way within three months from the receipt of the request. Other rights of way not needed in conjunction with permits for civil works should continue to be granted within 6 months in accordance with Article 43 of Directive (EU) 2018/1972. Operators that suffer damage due to the delay of a competent authority to grant permits or rights of way within the applicable deadlines should have the right to compensation.
Added(5) The roll-out of very high capacity networks (as defined in Directive (EU) 2018/1972) across the Union requires substantial investment, a significant proportion of which is the cost of civil engineering works. Sharing physical infrastructure would limit the need for costly civil engineering works and make advanced broadband roll-out more effective.
RemovedRecital 41: (41) In order to ensure uniform conditions for the implementation of Article 7 of this Regulation, implementing powers should be conferred on the Commission. Those powers should be exercised in accordance with Regulation (EU) No 182/2011 of the European Parliament and of the Council39 . The exemptions from the requirement for permits set out at Union level by way of an implementing act, could be applied to different categories of infrastructure (such as masts, antennae, poles and underground cables) under certain specified conditions, for which building permits, digging permits or other types of permits may be initially required.
Added(6) A major part of the costs of deploying very high capacity networks can be attributed to inefficiencies in the roll-out process related to: (i) the use of existing passive infrastructure (such as ducts, conduits, manholes, cabinets, poles, masts, antenna installations, towers and other supporting constructions); (ii) bottlenecks related to the coordination of civil works carried out by network operators or public authorities; (iii) burdensome and lengthy administrative procedures to grant permits; and (iv) bottlenecks in in-building deployment of networks, which lead to high financial barriers, particularly in rural areas.
RemovedIn order to ensure harmonization across the EU and eliminate additional burden on operators, works related to minor technical upgrades and maintenance have been explicitly exempted from the permit granted procedure in Article 7 paragraph 2(new) of this Regulation.
Added(7) Directive 2014/61/EU of the European Parliament and of the Council, which was adopted in response to the need to lower the costs of broadband deployment, included measures on infrastructure sharing, civil works coordination and the reduction of administrative burdens. To further facilitate the roll-out of very high capacity networks, including fibre and 5G, the European Council, in its Conclusions on Shaping Europe’s Digital Future of 9 June 2020, called for a package of additional measures to support current and emerging network deployment needs, including by reviewing Directive 2014/61/EU.
Sources & citation
Where the facts on this page come from, and how to cite it.
- Data source
- Licensed CC BY 4.0.
- Retrieved
- 26 September 2026
Cite as
European Parliament (2023). “Changes between ITRE-PR-749242 and A-9-2023-0275”. Text, 25 September 2023. from ITRE-PR-749242, to A-9-2023-0275. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/ITRE-PR-749242/compare/A-9-2023-0275?all=1 (retrieved 26 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2023-09-25,
author = {{European Parliament}},
title = {{Changes between ITRE-PR-749242 and A-9-2023-0275}},
year = {2023},
date = {2023-09-25},
howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/ITRE-PR-749242/compare/A-9-2023-0275?all=1}},
url = {https://news.eu-parl.st-solutions.dev/texts/ITRE-PR-749242/compare/A-9-2023-0275?all=1},
urldate = {2026-09-26},
publisher = {EU Parl Watch Research},
note = {Text. from ITRE-PR-749242, to A-9-2023-0275. Data: European Parliament Open Data (CC BY 4.0)}
}