Text · Comparison of two versions
Changes from plenary report to plenary report
A-8-2018-0414 → A-10-2025-0058
- From
- A-8-2018-0414 Plenary report of 29 Nov 2018
- To
- A-10-2025-0058 Plenary report of 9 Apr 2025
- Changes
- Not comparable
- Paragraphs
- +12 added · −84 removed · 7 changed
More facts (3)
- Dossier
- 2018/0198(COD)
- Title (from)
- on the proposal for a regulation of the European Parliament and of the Council on a mechanism to resolve legal and administrative obstacles in a cross-border context
- Title (to)
- on the Council position at first reading with a view to the adoption of a regulation of the European Parliament and of the Council on a mechanism to resolve legal and administrative obstacles in a cross-border context
These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.
Every difference
The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.
Part 4 of 5: Paragraphs 92–93
RemovedArticle 17 – paragraph 2 – introductory part: 2. Upon receipt of the Commitment or the Statement, as also signed by the competent Cross-border Coordination Point or competent transferring authority in the cases of points (a) or (b) of paragraph 1, the competent Cross-border Coordination Point of the committing Member State shall:
RemovedArticle 25: 1. By dd mm yyyy [i.e. the 1st of the month following the entry into force of this Regulation + three years; to be filled in by the Publication Office], the Commission shall present a report to the European Parliament, the Council and the Committee of the Regions assessing the application of this Regulation based on indicators on its effectiveness, efficiency, relevance, European added value and scope for simplification. / 2. In the report referred to in paragraph 1, the Commission shall make particular reference to this Regulation’s geographical and thematic scope as defined in points (1) and (2) of Article 3 respectively. / 3. Before the report is prepared, the Commission shall carry out a public consultation with the various actors involved, including local and regional authorities and civil society organisations.
Sources & citation
Where the facts on this page come from, and how to cite it.
- Permalink
- https://news.eu-parl.st-solutions.dev/texts/A-8-2018-0414/compare/A-10-2025-0058?all=1&part=4
- Data source
- Licensed CC BY 4.0.
- Retrieved
- 28 September 2026
Cite as
European Parliament (2025). “Changes between A-8-2018-0414 and A-10-2025-0058”. Text, 9 April 2025. from A-8-2018-0414, to A-10-2025-0058, reference 2018/0198(COD). EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-8-2018-0414/compare/A-10-2025-0058?all=1&part=4 (retrieved 28 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2025-04-09,
author = {{European Parliament}},
title = {{Changes between A-8-2018-0414 and A-10-2025-0058}},
year = {2025},
date = {2025-04-09},
howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-8-2018-0414/compare/A-10-2025-0058?all=1&part=4}},
url = {https://news.eu-parl.st-solutions.dev/texts/A-8-2018-0414/compare/A-10-2025-0058?all=1&part=4},
urldate = {2026-09-28},
publisher = {EU Parl Watch Research},
note = {Text. from A-8-2018-0414, to A-10-2025-0058, reference 2018/0198(COD). Data: European Parliament Open Data (CC BY 4.0)}
}