- 128 changes to the text
- Paragraphs
- +27 added · −36 removed · 119 changed
More facts (3)
- Dossier
- 2024/2019(DEC)
- Title (from)
- on discharge in respect of the implementation of the general budget of the European Union for the financial year 2023, Section III – Commission, executive agencies and the ninth, tenth and eleventh European Development Funds
- Title (to)
- Discharge 2023: EU general budget - Commission, executive agencies and European Development Funds
AI: What changed, in short Written by AI from the official text — check the source · deepseek-flash · 11 Sept 2026
Parliament adds new provisions on institutional integrity, foreign interference, and the European Public Prosecutor's Office, and on the 'Rearm EU' initiative and Russia as a State sponsor of terrorism.2179 It adds new paragraphs on transparency of EU funding, including calls for additional resources for the Transparency Register secretariat and for implementing Court of Auditors recommendations on NGOs.2332 It adds a paragraph on an investigation involving the former Commissioner for Justice and calls for cooperation with Belgian authorities.100 It adds 'anti-Christian' to the list of movements whose views are opposed to EU fundamental values.20 The other changes are formal or wording: updated titles and citations, expanded abbreviations, corrected punctuation and decimal separators, and rephrased passages.1246
The notes class 7 changes as substance, 13 as formal, 80 as wording only; 28 smaller changes were not described.
Every difference
The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.
Part 13 of 19: Paragraphs 370–429
57. Notes with concern that the Court revealed that the Commission did not charge late interest payments for six cases related to late corrections to GNI data by Member States where the Commission has expressed reservations; agrees with the Court that the Commission, as a matter of principle, ought to charge late interest payments in such cases in order to create an incentive for Member States to address the reservations within the deadlines;
58. Notes with satisfaction that the new own resource based on non-recycled plastic packaging waste generated by Member States in 2023 amounted to EUR 7,2 billion, equivalent to 4,0 % of the EU’s total revenue; further notes that the Court identified some problems related to the reliability and comparability of data; stresses that it provides an excellent example of a new own resource, as it creates positive incentives for Member States to reduce the volume of non-recycled plastic packaging while at the same time generating a new revenue stream for the Union;
Change 36
Changed55.59. Stresses that the Commission’s proposals concerning new own resources from 2021 comprising three elements, the first based on revenues from emissions trading (ETS), the second drawing on the resources generated by the Union’s carbon border adjustment mechanism, and the third based on the share of residual profits from multinationals that will be re-allocated to Member States under the OECD/G20 agreement on a re-allocation of taxing rights (“Pillar(‘Pillar One”)One’) are obvious candidates for such new resources; at the same time, points out that other sources might also be considered if they should prove to be easier for Member States to approve; welcomes other initiatives that may lead to new own resources for the Union budget;
6 unchanged paragraphs
60. Calls on the Commission, in particular, to:
(i) increase focus and pressure on the implementation of the Customs Action Plan and not least the proposal for a significant customs reform from May 2023, including the establishment of the EU Customs Authority and EU Customs Data Hub; ensure that Member States implement effective, proportionate and dissuasive penalties for non-compliance with reporting obligations; initiate infringement proceedings in those cases where there is sufficient evidence that Member States are implementing a manifestly inadequate penalty system for breaches of the Directive on Administrative Cooperation 6 (DAC 6);
(ii) insist on the importance of intensifying and diversifying the International customs cooperation with trade partners and stresses the need to strengthen the fight against cross-border tax and customs fraud in the context of the expansion of e-commerce;
(iii) create incentives for Member States to address reservations related to corrections of GNI data by Member States within the deadlines by charging late interest payments;
(iv) continue work towards the introduction of additional new own resources;
Single market, Innovation and Digital
Change 37
Changed57.61. Notes that the budget for the programmes under MFF headingHeading 1 ‘Single Market, Innovation and Digital’ was EUR 25,3 billion (13,2 % of the Union budget) distributed as follows: EUR 15,3 billion (60,5 %) for Research, EUR 4,1 billion (16,1 %) for Transport, Energy and Digital, EUR 2,3 billion (9,1 %) for the InvestEU Programme, EUR 2,2 billion (8,7 %) for Space, and EUR 1,4 billion (5,6 %) for other areas;
Change 38
Changed58.62. Notes that the Court has examined 127 transactions covering the full range of spending under this MFF heading, notably the Horizon 2020 programme (90 transactions), Horizon Europe (7 transactions), the Connecting Europe Facility (CEF), space programmes and financial instruments, and also that it has reviewed the European Climate, Infrastructure and Environment Executive Agency’s (CINEA) ex ante control system for CEF grants in the transport and energy sectors and the regularity information given in the annual activity reports of the Directorate-General for Research and Innovation (DG RTD) and the European Health and Digital Executive Agency (HaDEA);(HADEA);
Change 39
Changed59.63. Notes that the Court estimates that the level of error in spending on ‘Single Market, Innovation and Digital’ in 2023 was material at 3,3 %; notes the Court’s observation that research and innovation expenditure is most affected by error, particularly in the area of personnel costs; further notes that the Commission estimates the risk at payment as 1,4 % for this heading, which is in the lower half of the range of the Court’s estimate; is concerned by the Court’s conclusion that the Commission’s risk at payment for this heading remains an underestimate, because of weaknesses identified by the Court in the Commission’s ex post audits in this area since the financial year 2019;2019 ;
5 unchanged paragraphs
64. Notes with concern that 39 (31 %) of the 127 transactions that the Court examined contained errors; is deeply concerned that for seven cases of quantifiable errors made by beneficiaries, the Commission (or the auditors contracted by the beneficiaries) had sufficient information to prevent, or to detect and correct the error before accepting the expenditure, and thus, had the Commission made proper use of all the information at their disposal, the estimated level of error for this chapter would have been 1,4 percentage points lower; highlights that this points to weaknesses in the Commission’s controls;
Research and innovation
65. Highlights the importance of Union research and innovation (R&I) funding programmes for the scientific, societal, economic and technological development of the Union, reducing inequalities, achieving the green and digital transitions and decreasing the Union’s energy dependency on Russia; recalls that Horizon Europe is the most significant research and innovation programme in Europe, with a total budget of EUR 95,5 billion for 2021-2027, including EUR 5,4 billion from the NGEU instrument; notes that the RRF has allocated around EUR 48 billion in investments to R&I; underlines that in order to enhance the Union’s competitiveness and close the innovation gap, additional funding for R&I is needed, taking into account the Draghi report’s pertinent recommendations; highlights, in particular, the need to increase defence-related R&I spending due to the current geopolitical conditions, which could serve as an important component of the innovation policy strategy;
66. Notes that its predecessor, Horizon 2020, with a budget of EUR 75,6 billion funded more than 35 000 projects between 2014 and 2020 and its calls attracted over a million individual applications from 177 countries; further notes that in her hearing for the 2023 discharge, Commissioner Ivanova underlined the EU added value of EU R&I funding programmes, explaining that the final evaluation of Horizon 2020 estimated that, for each euro of costs linked to the programme five euros worth of benefits would be generated for society by 2040; deeply regrets that 74 % of proposals assessed as high quality by independent experts could not be funded due to budget constraints; notes that an additional EUR 159 billion would have been needed to fund all high-quality proposals; stresses the importance of ensuring sufficient funding for Union research and innovation, not the least to increase the Union’s competitiveness and prosperity, in line with the Union’s strategic agenda for 2024-2029;
67. Notes the late adoption of the Horizon Europe legal bases in 2021 and welcomes that the Commission managed to reach close to 100 % budget implementation in 2023; notes that the number of grant agreements signed by the end of 2023 was 10 674 and a further two framework agreements were signed;
Change 40
Changed64.68. Notes with concern that the Court found errors relating to ineligible costs in 30 of the 97 research and innovation transactions in its sample, and that these errors represent 71 % of the Court’s estimated level of error for this heading in 2023; reiterates its concern that after 9 years of implementation of the Horizon 2020 programme, the calculation of personnel costs remains a major source of errors, as 22 of the 30 research transactions with quantifiable errors in the Court’s sample (around 73 %) are affected by the incorrect application of the methodology for calculating personnel costs; acknowledges both the Commission’s and the Court’s continued efforts to remedy this situation; welcomes that the Commission has accepted the Court’s recommendations to enhance beneficiaries'beneficiaries’ compliance with the daily-rate rules and to ensure clarity concerning daily-rate rules in Horizon Europe documents;
5 unchanged paragraphs
69. Underlines the importance of simplifying the rules and procedures governing Union R&I funding; notes that in 2023 the Commission has continued the roll out of simplified cost options such as lump sums and unit costs in Horizon Europe; further notes the remarks made by the Director-General for Research and Innovation in the exchange of views with the CONT Committee that the Commission intends to increase the disbursement of Horizon Europe funds through lump sums to 50 % by 2027; welcomes that the Commission, taking the Court’s recommendations issued in its annual reports for 2022 into account, will further specify the requirements defining the proper implementation of lump sum grants, including the elements of each work package triggering payment, and will also provide detailed guidance to those involved in assessing the implementation of projects; further notes that, as described in the Commission’s assessment of Lump Sum Funding in Horizon 2020 and Horizon Europe 2018-2024, beneficiaries would welcome more clarity on how lump sum grants would be audited; is concerned that the ex post audit strategy for Horizon Europe is not yet developed;
70. Stresses the crucial role of the private sector in addressing the innovation gap in the Union and improving the Union’s competitiveness and prosperity; believes, in particular, that it is imperative to continue to promote and facilitate as much as possible the participation of SMEs in Union R&I funding programmes; notes the Court’s conclusion that SMEs and newcomers are more prone to making errors than other beneficiaries since they lack the experience and resources to administer the funds; welcomes the efforts made by the Commission to support SMEs specifically, for example through information campaigns, contacts with the system of National Contact Points and the dedicated helpdesk of the Research Enquiry Service; considers that the simplification of rules and procedures is the major driver for increased participation of SMEs;
Energy, Transport and Digital
71. Highlights the importance of Union investments in the development of high performing, sustainable and efficiently interconnected trans-European networks in the fields of transport, energy and digital services and notes that the Connecting Europe Facility (CEF), with EUR 4,1 billion of expenditure in 2023, is a key Union instrument in delivering these objectives;
72. Draws attention to the need to simplify the application procedures under the Connecting Europe Facility for Transport (CEF-T) in order to enable greater participation of smaller entities and local initiatives in the development of European transport infrastructure; regrets that the CEF-T budget does not cover all the needs for sustainable transport investments and that most of the CEF-T budget has already been allocated, leaving a funding gap until 2027;
Change 41
Changed69.73. Recalls that the Russian war of aggression against Ukraine and the resulting sanctions imposed on Russia continued to adversely impact the Union’s transport sector in 2023, leading to traffic shortages, supply chain bottlenecks, and the necessity to bypass traditional routes, thereby extending journey times and increasing costs; points out that the Eastern border regions, especially in the Baltic states, Finland, Poland,Poland and Romania, have been particularly affected by economic losses and a halt of cross-border mobility as a consequence of the Russian aggression; calls on the Commission to introduce targeted measures, including in the next MFF, to facilitate recovery of the affected regions;
74. Calls on the Commission to conduct a comprehensive review of the funding allocated to the cross-border and multi-country infrastructure projects, facing significant implementation challenges, financial difficulties, or delays, such as Rail Baltica; points out that this review should address inefficiencies in planning and management as well as escalating construction costs that threaten project timelines and objectives; reiterates that greater transparency in the management of public funds increases citizens’ trust in the Union institutions;
Change 42
Changed71.75. Notes with concern that the Court found two errors in CEF projects in its 2023 sample, and that one of these relates to a serious breach of the Union’s public procurement rules, and has led to the contract being awarded to a consortium that did not fulfil the selection criteria and that this error contributed 28 % to the estimated error rate for headingHeading 1;
Change 43
Changed72.76. Is deeply concerned by the Court’s findings in relation to the European Climate, Infrastructure and Environment Executive Agency’s (CINEA)ex(CINEA) ex ante control system for CEF grants in the transport and energy sectors, in particular the Court’s conclusion that while the strategies for both CEF1 (2014-2020) and CEF2 (2021-2027) are based on a sound analysis of risks and past irregularities, the guidelines for ex-anteex ante checks on procurement were not detailed enough; fully supports the Court’s recommendation that the Commission should further develop these guidelines;
8 unchanged paragraphs
Recommendations
77. Calls on the Commission to:
(i) secure the provision of adequate resources to support high-quality research and innovation project proposals with an EU added value in the short-term through the 2026 draft budget and in the medium-term through the Commission’s proposal for the next Multiannual Financial Framework;
(ii) continue to simplify rules and procedures in line with the new financial regulation, to support training sessions and user-friendly, consistent and practical information for applicants in Member States, in particular for SMEs, new applicants, spin-offs, start-ups, CSOs or local action groups and to encourage applications from beneficiaries in Member States with more limited participation, as well as from smaller entities;
(iii) continue to apply simplified rules and procedures, digitalisation measures and simplified cost options (SCOs) while addressing, in particular, the risk of irregularities and fraud and the costs of controls, and finalising the ex post audit strategy for Horizon Europe as soon as possible;
(iv) further specify the requirements for defining proper implementation of lump sum grants, taking into account the Court’s pertinent recommendations from its 2022 Annual Report, and verify the actual implementation of projects using lump sums;
(v) undertake a thorough analysis of procurement errors found and further develop the guidelines describing the extent of the checks to be performed for ex ante controls on procurement for CEF projects, as recommended by the Court;
Cohesion, Resilience and Values
Change 44
Changed74.78. NotesStresses the importance of Union cohesion policy for economic and territorial convergence and development in the regions of the Union, as well as for supporting the implementation of the European Pillar of Social Rights; notes that the budget for the programmes under MFF headingHeading 2 ‘Cohesion, resilience and values’ was EUR 73,3 billion (38,4 % of the Union budget) distributed as follows: 47,8 % for the European Regional Development Fund (ERDF) and other regional operations, 18,9 % for the European Social Fund (ESF), 9,8 % for the Cohesion Fund (CF), 3,8 % for Erasmus+, 2,1 % for CEF Transport, and 3,8 % for other areas;
79. Notes that the Court has examined a sample of 238 transactions covering the full range of spending under MFF Heading 2; notes with concern that the Court’s estimated overall level of error in expenditure under this heading in 2023 increased to 9,3 %, which is significantly above the materiality threshold; draws attention to the marked increase in the overall level of error estimated by the Court in 2023 compared to previous years (6,4 % in 2022, 3,6 % in 2021);
80. Is concerned about the Court’s observation that the significant additional resources made available under the Recovery Assistance for Cohesion and the Territories of Europe (REACT-EU), the approaching end of the eligibility period for 2014-2020 programmes (31 December 2023), and parallel implementation of the NGEU programme have put additional pressure on Member State’s administrations, increasing the risk of errors; is in particular concerned by the practice of reducing Member States’ co-funding, as is the case under REACT-EU, the Coronavirus Investment Initiative (CRII) and CRII+, which reduces the ownership and associated incentives for properly overseeing expenditure; notes from the Commission replies the acknowledgement that some authorities may have carried out less effective controls and verifications due to the heavy overload and increasing pressure of parallel implementation of 2014-2020 programmes and of additional funding under NGEU;
81. Notes the Court’s analysis of transactions with additional funding through REACT-EU and flexibility through CRII+ and Cohesion’s Action for Refugees (CARE) and their contribution to the estimated levels of error; notes in particular the conclusion that errors found in 100 % EU-funded priorities contributed 5,0 % to the total estimated level of error of 9,3 %; is concerned that increasing flexibilities, without either decreasing requirements or increasing preventive checks and controls at the same time, contributed to the high error rate;
Change 45
Changed78.82. Notes the Court’s Review 03/2024 “An‘An overview of the assurance framework and the key factors contributing to errors in 2014-2020 cohesion spending”spending’ that provides a multi-annual overview covering six years of audit results, including an assessment of management and control issues, aiming to strengthen the assurance model; is concerned by the Court’s conclusion that, although the assurance framework for cohesion policy has helped to reduce the level of error, it has not been effective in bringing the overall level of error below the materiality threshold of 2 %; is worried that the Commission can rely only to a limited degree on the work of the national audit authorities, because of the systematic weaknesses; supports the Court’s recommendation to the Commission to strengthen the implementation of the assurance framework for the 2021-2027 cohesion spending; reminds the Commission of the discharge authority’s call to work closely with the Member States to improve the management and control system for Union expenditure to reduce the high error rate to below the 2 % materiality threshold;
83. Notes the Court’s observation in its review on the reliability of the work of key actors in the control system for cohesion policy; is concerned by the Court’s finding that during a 6-year period managing authorities, the first line of defence for detection and prevention of errors, are not sufficiently effective in mitigating the inherent high risk of error in cohesion policy; considers it even more worrying that the Court found that the second line of defence, the Member States’ audit authorities, are not able to determine the correct error rate for the packages of expenditure they audit and provide assurance on, since the Court detected additional errors in at least 39 % of these packages; notes that these errors have been detected and reported by the Court annually for more than 6 years and that there is therefore a systemic issue;
Change 46
Changed80.84. Notes the Court’s categorisation of errors found in cohesion expenditure, with ineligible projects accounting for 29 %, ineligible costs for 26 % and serious non-compliance in public procurement procedures accounting for 21 % of errors and ERDF and CF related expenditure accounting for the largest share of errors (80 %); notes that expenditure under the ESF+, YEI (Youth Employment Initiative) and FEAD (Fund for European Aid to the Most Deprived) are proportionally less affected by error, as they together account for 16 % of errors, while they together account for around 20 % of the budget under this heading;
7 unchanged paragraphs
85. Notes the study commissioned by the Committee on Budgetary Control on ‘Lessons learned from the implementation of crisis response tools’ that shows that absorption of uncommitted cohesion resources was supported by the flexibilities introduced under CRII and CRII+; is concerned by the finding of the researchers that quality of fast-tracked projects might not have reached the same level as investments before the pandemic; is further concerned by the researchers’ observation that the risk of low-quality projects is entirely borne by the Union Budget, because of 100 % EU-funding in CRII, CRII+ and REACT-EU; considers that 100 % EU-funding might help absorption, but that absorption is not a goal in itself;
86. Stresses that, in its most recent discharge opinions, the Committee on Regional Development called for additional advisory support from the Commission to national, local and regional authorities to avoid a situation of administrative overload; recognises the Commission’s efforts but, observes that, regrettably, these have not been sufficient to mitigate the risk of error; warns that a similar administrative overload might occur at the end of the RRF eligibility period and the final years of the MFF; underlines the need to address the insufficient administrative capacity of national, local and regional authorities as a matter of urgency; calls on the Commission, in this regard, to provide them with clear guidance, and to increase its support for administrative capacity building, including through staff training, best practice sharing, peer-to-peer reviews and technical assistance to ensure effective fund management;
87. Notes the public discussions on the post-2027 multiannual financial framework that may indicate a shift towards a performance-based model, coupling investments and reforms, and a desire to simplify rules and procedures; calls on the Commission to prioritise the financial responses to the current threats resulting from the geopolitical situation; warns that any decision on the future design of spending programmes must not be to the detriment of oversight and control of Union expenditure in terms of transparency and information at Union level about non-compliance with rules and regulations; considers that the errors identified by the Court and the way the Commission handles those errors are also an indication of a properly functioning management and control system and notes that both institutions stated their commitment to improve the system and bring down the error rate;
88. Notes, as in previous years, the Court’s observation that the Commission’s desk reviews, to review and assess the work of audit authorities, are aimed at checking only consistency of regularity information, and that they are therefore too limited to confirm the residual error rate reported by the national authorities in their assurance packages; notes the Commission’s reply that it complements its desk review with on-the-spot audit work covering the programmes and assurance packages, which enables it to establish a reasonable and fair estimate of the error rates for each programme; considers that the Court’s observation is about the scope of the desk reviews and the fact that they are only aimed at consistency and therefore too limited to provide the Commission with information that is sufficiently reliable;
89. Is concerned about the persistent shortcomings observed by the Court in the work of national audit authorities as visible in the weaknesses identified in the assurance packages, with a residual error rate above the materiality threshold for more than 60 % of the value of assurance packages audited in 2023; stresses with concern that managing authorities consistently do not effectively succeed in preventing or detecting irregularities in expenditure declared by beneficiaries and that this reduces the extent to which the Commission can rely on their work;
90. Reminds that in shared management, it is the Commission’s responsibility to make sure that Member States set up management and control systems that function effectively during the implementation of programmes; is worried that both the Commission and the Court have identified that not all Member States’ management and control systems function effectively, thus negatively effecting the reliability of the Commission error rates, as they rely on these national systems, which do not work effectively; calls into question the possibility for the Commission to continue to rely on national systems;
91. Considers that for the single audit approach to work well, and in order to achieve reduced administrative burden for beneficiaries and managing authorities, adherence to audit standards at all levels of control and audit is of essential importance; is therefore worried by the Court’s finding in its annual report that essential supporting documents about compliance with eligibility conditions were not presented by programme authorities and beneficiaries, and also by the finding by the Court presented in its review that insufficient documentation of audit work from audit authorities limits the reliance that can be placed on audit work of national audit authorities;
Change 47
Changed88.92. Recalls that following Article 15 of Regulation (EU) 2021/1060 of the European Parliament and of the Council (CPR) for the programming period 2021-2027, Member States need to comply with horizontal and thematic enabling conditions, which need to remain fulfilled and respected throughout the implementation period of the funds; recalls that when enabling conditions are not fulfilled at the time of submission of a payment application to the Commission for the specific objective concerned, the related expenditure will not be reimbursed from the Union budget until the Commission is satisfied that the enabling condition has been fulfilled; recalls the strong regrets of the discharge authority in relation to the Commission decision of 13 December 2023 considering that Hungary fulfilled the horizontal enabling condition related to judicial independence that enabled the Hungarian authorities to submit reimbursement claims of up to EUR 10.210,2 billion; notes with concern that since the release of these funds, the Hungarian government has not taken steps to reinstate the independence of the judiciary but on the contrary; reiterates its worries about the lack of adequate control mechanisms or unreliable public procurement procedures to guarantee sound financial management and the protection of the Union budget; believes that this decision politically contradicts the prolongation of the measures adopted under Regulation (EU, Euratom) 2020/2092 of the European Parliament and of the Council (the ‘Conditionality Regulation’);
Change 48
Changed89.93. Expresses deep concern over the findings in the 2023 Rule of Law Report regarding the rule of law situation in Hungary, particularly the persistent and systemic challenges in the judiciary and the media sectors; notes with alarm the increasing pressure on judicial independence, including concerns over the selection and promotion of judges, and recent reports of intimidation and interference in judicial decisions, as exemplified by the resignations of judges in protest against political influence; notes with concern in the same vein that the head of the Hungarian Integrity Authority, a key institution established as a condition set by the Commission for the release of Union funds under the Rule of Law Conditionality Regulation, is facing increasing pressure from the Hungarian government; calls on the Commission to ensure a coordinated and holistic approach across all relevant Union funds and legislative tools, emphasizingemphasising that Union funds must not be allocated to activities undermining democracy or reinforcing authoritarianism;
5 unchanged paragraphs
94. Recalls that the Conditionality Regulation establishes a mechanism and measures to protect the Union Budget from breaches of the rule of law when other procedures set out in Union legislation would not protect the budget more efficiently; recalls that this mechanism was activated on 15 December 2022 in the case of Hungary over concerns related to its system of public procurement, resulting in a temporary suspension of 55 % of budgetary commitments for three cohesion policy programmes; recalls that the same regulation, in line with Article 6 of Council Regulation (EU, Euratom) 2020/2093 (the ‘MFF Regulation’), stipulates that suspended commitments of 2022 (year n), may not be re-entered into the budget beyond 2024 (year n+2) and that therefore 55 % of commitments from 2022, around EUR 1 billion, were decommitted in December 2024; notes that no other procedures under the Conditionality Regulation are ongoing;
95. Notes that the Commission allocated an equivalent of five full-time staff members to the implementation of the Conditionality Regulation and reiterates the European Court of Auditor’s concerns raised in its Special Report 03/2024 that current staff numbers appear to be insufficient to ensure a strict and coherent application of the Regulation;
96. Reiterates the need to treat as a single, integral package all the measures required for the release of Union funding under the Conditionality Regulation, the CPR and Regulation (EU) 2021/241 of the European Parliament and of the Council (the ‘RRF Regulation’); stresses the importance of the protection of the Union financial interests also for disbursement of pre-financing;
97. Notes that some investments which would have been eligible for financing under cohesion are included in the National Recovery and Resilience Plans; recalls that the general objective of the RRF enshrined in Article 4 of the RRF Regulation is to promote the Union’s economic, social and territorial cohesion, and that one of its six pillars is specifically dedicated to this purpose; acknowledges that the wide scope of the RRF results in limited overlap with other Union funding programmes, as intended by the co-legislators when establishing the Article 9 of the RRF Regulation, which establishes additionality and complementarity funding as key principles; draws attention, however, to the risks of double funding emerging from such situations;
98. Expresses its preoccupation about the visible delays in implementation of cohesion policy in Member States and the lack of capacity of national administrations to deal in parallel with different spending programmes (e.g. cohesion programmes and RRF programmes) covering complementary or even similar objectives; calls on the Commission to ensure that sufficient technical assistance is provided to Member States facing difficulties in order to address existing delays in the implementation of cohesion programmes;
Change 49
Changed95.99. Recognises the disproportionate impact of the Russian war of aggression against Ukraine on eastern regions of the Union bordering Russia and Belarus; draws attention to the costs borne by these regions and Member States as a result of their shared border with hostile neighbouring countries, notably their need to increasingly direct public funding into security, defence and preparedness, while facing dramatically reduced resources due to a disruption in economic activities, cross-border trade and other exchanges, and in cohesion programmes, particularly Interreg programmes; notes the measures taken by the European Commission to support these regions, notably through flexibilities provided under cohesion policy; welcomes that providing support to eastern border regions most affected by Russia’s aggression is included in the mission letter of the Executive Vice President for Cohesion and Reforms; calls on the Commission to ensure the provision of adequate support for eastern regions of the Union bordering Russia and Belarus to cope with the disproportionate consequences of the Russian war of aggression, both in the short-termshort term through the 2026 draft budget and in the medium-termmedium term through the Commission’s proposal for the next MFF;
100. Stresses the importance of ESF+ which aims to achieve high employment, fair social protection, a skilled and resilient workforce, and inclusive/cohesive societies as key in eradicating poverty; expresses the need to provide it with the continued financial and political support of the Union, national and regional institutions in the delivery of its objectives and targets in the years to come; underlines the importance of closely involving regional actors, in particular civil society organisations and social partners working on the ground in the implementation of ESF+ funded activities;
101. Welcomes the frontloading of EUR 100 million from the 2027 budget of Erasmus+ to the 2023 budget of Erasmus+, which enabled continued support to pupils, students, teachers and qualified staff fleeing from Ukraine, and the extra EUR 20 million awarded to Erasmus+ in 2023 as a result of Parliament’s insistence; stresses that frontloading must remain an exception to rapid response to unforeseen acute crisis situations; underlines that any frontloading of Erasmus+ cannot result in cuts for the programme at the end of current MFF; emphasises that every effort must be made to respond to such situations preferentially with additional funding;
Change 50
Changed98.102. Emphasises the need for strict oversight of the allocation of funds to prevent misuse within the Erasmus programme; asks the Commission to gather evidence to investigate any case of fraudulent or suspicious recipients, in accordance with its duties outlined in the Financial Regulation and Erasmus+ grant agreements; calls for adequate safeguarding of the programme from abuse by organizationsorganisations whose activities are not aligned with the fundamental values of the Union (human dignity, freedom, democracy, equality, rule of law, human rights); recalls that the Commission is legally bound to ensure that programme beneficiaries commit to and ensure the respect of these values and do not commit professional misconduct;
Sources & citation
Where the facts on this page come from, and how to cite it.
- Permalink
- https://news.eu-parl.st-solutions.dev/texts/A-10-2025-0074/compare/TA-10-2025-0077?all=1&part=13
- Data source
- Licensed CC BY 4.0.
- Retrieved
- 29 September 2026
Cite as
European Parliament (2025). “Changes between A-10-2025-0074 and TA-10-2025-0077”. Text, 7 May 2025. from A-10-2025-0074, to TA-10-2025-0077, reference 2024/2019(DEC). EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-10-2025-0074/compare/TA-10-2025-0077?all=1&part=13 (retrieved 29 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2025-05-07,
author = {{European Parliament}},
title = {{Changes between A-10-2025-0074 and TA-10-2025-0077}},
year = {2025},
date = {2025-05-07},
howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-10-2025-0074/compare/TA-10-2025-0077?all=1&part=13}},
url = {https://news.eu-parl.st-solutions.dev/texts/A-10-2025-0074/compare/TA-10-2025-0077?all=1&part=13},
urldate = {2026-09-29},
publisher = {EU Parl Watch Research},
note = {Text. from A-10-2025-0074, to TA-10-2025-0077, reference 2024/2019(DEC). Data: European Parliament Open Data (CC BY 4.0)}
}