Skip to content

Text · Adopted text

Waste electrical and electronic equipment (WEEE)

Adopted text TA-9-2023-0392 · P9_TA(2023)0392 · PE746.823

Kind
Adopted text TA-9-2023-0392
Date
9 November 2023
Dossier
2023-0025
More facts (2)
Subject matter
ENV, RAPL
More

In short

A summary of the text written by AI; ¶ opens the paragraph it rests on.

AI: In short Written by AI from the official text — check the source · deepseek-flash · 29 Sept 2026

Parliament's amended version of the Commission proposal to amend Directive 2012/19/EU on waste electrical and electronic equipment (WEEE). It adds recitals on legal certainty, retroactive effects, photovoltaic panel treatment and consumer costs, and requires the Commission to assess a revision of the Directive by 31 December 2026. The assessment must cover legal certainty, the waste hierarchy, the polluter pays principle, enforcement and collection targets, and a new 'photovoltaic panels' category with collection targets based on projected lifetime. It changes financing rules for historical waste other than photovoltaic panels, and sets the deadline for member states to comply at 18 months after entry into force.

Key points

  1. A new recital states that a member state adopting legislation contrary to an EU directive before that directive was adopted is not in itself a breach of EU law.
  2. A new recital calls for preventing provisions with unjustified retroactive effects in future revisions, giving clarity to EEE producers on operating conditions when products were placed on the market.
  3. A new recital calls for environmentally sound management of waste photovoltaic panels and open scope WEEE, and says member states may encourage producers to collect and treat historical WEEE.
  4. A new recital says the costs of managing WEEE should not be disproportionately transferred to consumers or citizens, taking into account the polluter pays principle and the waste hierarchy.
  5. A new Article 2a requires the Commission to assess the need for a revision of the Directive by 31 December 2026 and, where appropriate, present a legislative proposal with a socio-economic and environmental impact assessment.
  6. The impact assessment must cover legal certainty and retroactive effects, the waste hierarchy, disproportionate costs for citizens and consumers, enforcement and collection targets, and illegal trade of WEEE.
  7. The impact assessment must also cover creating a new 'photovoltaic panels' category, separating them from WEEE category 4 'large equipment', and calculating collection targets on waste photovoltaic panels available for collection based on projected lifetime.
  8. Article 13(1) is amended so that financing of historical WEEE other than photovoltaic panels, when replaced by equivalent products, is provided by producers of those products when supplying them; member states may make users other than private households partly or totally responsible.
  9. For other historical waste resulting from EEE other than photovoltaic panels, the financing of costs is provided by users other than private households.
  10. Member states must bring into force the laws, regulations and administrative provisions necessary to comply with the Directive by 18 months after entry into force at the latest, and communicate the text to the Commission.

Who is affected

  • Member states, which must transpose the amended Directive within 18 months of entry into force.
  • Producers of electrical and electronic equipment, who finance historical WEEE when supplying replacement products.
  • Users other than private households, who may be made responsible for financing historical WEEE.
  • The Commission, which must assess the need for a revision by 31 December 2026 and possibly propose legislation.

Figures and deadlines

  • 31 December 2026: deadline for the Commission to assess the need for a revision of the Directive.
  • 13 August 2012: date for waste photovoltaic panels placed on the market before which financial obligations change.
  • 15 August 2018: date for open scope EEE placed on the market before which financial obligations change.
  • 18 months after entry into force: deadline for member states to comply with the Directive.

Read the text · Report a problem

Text

The text as parsed from the official Word file. Every paragraph has a link (¶) and can be saved to a project as a passage.

Jump to an amendment (8)

Committee on the Environment, Public Health and Food Safety

Amendments adopted by the European Parliament on 9 November 2023 on the proposal for a directive of the European Parliament and of the Council amending Directive 2012/19/EU on waste electrical and electronic equipment (WEEE) (COM(2023)0063 – C9-0016/2023 – 2023/0025(COD))

(Ordinary legislative procedure: first reading)

Amendment 1

Proposal for a directive

Recital 4 a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(4a) The Court also concluded that EU law must be interpreted as meaning that the fact that a Member State adopted legislation contrary to an EU directive prior to the adoption of that directive does not constitute, in itself, a breach of EU law, since the achievement of the result prescribed by the directive cannot be regarded as seriously compromised before the directive forms part of the EU legal order.

Amendment 2

Proposal for a directive

Recital 9 a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(9a) In order to maintain the principle of legal certainty in the future revisions of Directive 2012/19/EU, it is important to pay particular attention to preventing the adoption of any provisions that could potentially have unjustified retroactive effects. It is necessary to give clarity and predictability to EEE producers with regard to the operating conditions that were in effect when their products were placed on the market. That approach helps to avoid the risk of incurring unpredictable costs associated with future WEEE management. Furthermore, such revisions should respect the waste hierarchy as laid down in Article 4 of Directive 2008/98/EC.

Amendment 3

Proposal for a directive

Recital 10 a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(10a) Unsound treatment of waste photovoltaic panels and open scope WEEE leads to significant adverse impacts on health and the environment. The proper treatment of photovoltaic panels and maximising the recovery of waste from photovoltaic panels at the end of their lifetime should therefore be ensured. Without prejudice to the changes to the financial obligations necessary to cover collection and treatment of waste photovoltaic panels placed on the market before 13 August 2012 and of waste from all open scope EEE placed on the market before 15 August 2018 introduced by this Directive, Member States should ensure the environmentally sound management of related WEEE. Member States may encourage producers, through their individual or collective extended producers responsibility schemes to properly collect and treat the related historical WEEE of photovoltaic panels and open scope EEE.

Amendment 4

Proposal for a directive

Recital 10 b (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(10b) When revising Directive 2012/19/EU, and addressing its shortcomings, it is crucial to ensure that the costs of managing WEEE are not disproportionately transferred to consumers or citizens. This includes taking into consideration the ‘polluter pays’ principle, addressing potential provisions pertaining to WEEE collection targets and adherence to the waste hierarchy as laid down in Article 4 of Directive 2008/98/EC.

Amendment 5

Proposal for a directive

Article 1 – paragraph 1 – point -1 (new)

Directive 2012/19/EU

Article 2 a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(-1) The following Article 2a is added:
“Article 2a
1. No later than [31 December 2026], the Commission shall assess the need for a revision of this Directive and, where appropriate, present a legislative proposal in that respect, accompanied by a thorough socio-economic and environmental impact assessment.
2. In the impact assessment, the Commission shall in particular assess the following:
(a) provisions which specifically ensure that the principle of legal certainty is adhered to and that there is no provision that could entail unjustified retroactive effect in any Member State;
(b) provisions to ensure the implementation of the waste hierarchy as laid down in Article 4 of Directive 2008/98/EC;
(c) provisions to ensure that citizens and consumers are not burdened with disproportionate costs, in line with the polluter pays principle;
(d) provisions ensuring full implementation and enforcement of this Directive, in particular with regard to adequate collection targets, as well as preventing illegal trade of WEEE;
(e) creating a new ‘photovoltaic panels’ category under this Directive with the aim to disassociate photovoltaic panels from the existing WEEE category 4, ‘large equipment’, as referred to in Annexes III and IV, and calculating the collection targets on the basis of waste photovoltaic panels available for collection based on their projected lifetime, rather than on the quantity of products placed on the market;
(f) establishing a mechanism to ensure that in case of failure or liquidation of the producer, the future costs of collection, treatment, recovery and environmentally sound disposal of waste from photovoltaic panels from both private households and users other than private households will be covered financially.”

Amendment 6

Proposal for a directive

Article 1 – paragraph 1 – point 2 a (new)

Directive 2012/19/EU

Article 13 – paragraph 1 – subparagraph 2

Amendment: Present text and Amendment
Present textAmendment
(2a) in Article 13(1), the second subparagraph is replaced by the following:
For historical waste being replaced by new equivalent products or by new products fulfilling the same function, the financing of the costs shall be provided for by producers of those products when supplying them. Member States may, as an alternative, provide that users other than private households also be made, partly or totally, responsible for this financing.”The financing of the costs from historical WEEE (‘historical waste’), resulting from EEE referred to in Article 2(1), point (a), other than photovoltaic panels, which is being replaced by new equivalent products or by new products fulfilling the same function, shall be provided for by producers of those products when supplying them. Member States may, as an alternative, provide that users other than private households also be made, partly or totally, responsible for this financing”

Amendment 7

Proposal for a directive

Article 1 – paragraph 1 – point 2 b (new)

Directive 2012/19/EU

Article 13 – paragraph 1 – subparagraph 3

Amendment: Present text and Amendment
Present textAmendment
(2 b) in Article 13(1), the third subparagraph is replaced by the following:
For other historical waste, the financing of the costs shall be provided for by the users other than private households.“For other historical waste resulting from EEE referred to in Article 2(1), point (a), other than photovoltaic panels, the financing of the costs shall be provided for by the users other than private households.”

Amendment 8

Proposal for a directive

Article 2 – paragraph 1 – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with this Directive by [one year after the entry into force] at the latest. They shall forthwith communicate to the Commission the text of those provisions.Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with this Directive by [18 months after the entry into force] at the latest. They shall forthwith communicate to the Commission the text of those provisions.

Connections

The dossier, the decisions on this text and its other versions.

No connections found for this item.

Sources & citation

Where the facts on this page come from, and how to cite it.

Data source
Licensed CC BY 4.0.
Retrieved
23 November 2026

Cite as

European Parliament (2023). “Waste electrical and electronic equipment (WEEE)”. Text, 9 November 2023. docId TA-9-2023-0392, reference TA9-0392/2023. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/TA-9-2023-0392 (retrieved 23 November 2026). Official source: The text on the European Parliament’s website, https://www.europarl.europa.eu/doceo/document/TA-9-2023-0392_EN.html. Data: EP Open Data API: document record, https://data.europarl.europa.eu/api/v2/documents/TA-9-2023-0392 (CC BY 4.0).
BibTeX
@misc{epw-text-ta-9-2023-0392,
  author = {{European Parliament}},
  title = {{Waste electrical and electronic equipment (WEEE)}},
  year = {2023},
  date = {2023-11-09},
  howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/TA-9-2023-0392}},
  url = {https://news.eu-parl.st-solutions.dev/texts/TA-9-2023-0392},
  urldate = {2026-11-23},
  publisher = {EU Parl Watch Research},
  note = {Text. docId TA-9-2023-0392, reference TA9-0392/2023. Official source: https://www.europarl.europa.eu/doceo/document/TA-9-2023-0392\_EN.html. Data: EP Open Data API: document record (CC BY 4.0)}
}