Text · Comparison of two versions
Changes from adopted text to adopted text
TA-9-2022-0315 → TA-9-2023-0263
- From
- TA-9-2022-0315 Adopted text of 14 Sept 2022
- To
- TA-9-2023-0263 Adopted text of 11 Jul 2023
- Changes
- Not comparable
- Paragraphs
- +18 added · −1 222 removed · 5 changed
More facts (2)
- Title (from)
- Energy efficiency (recast) ***I
- Title (to)
- Energy efficiency (recast)
These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.
Every difference
The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.
Part 21 of 21: Paragraphs 1201–1248
Removed(b) energy savings from demand response of distributed consumers by energy aggregators;
Removed(c) demand reduction from energy efficiency measures undertaken by energy service providers, including energy service companies;
Removed(d) the connection and dispatch of generation sources at lower voltage levels;
Removed(e) the connection of generation sources from closer location to the consumption; and
Removed(f) the storage of energy.
RemovedFor the purposes of this provision the term ‘organised electricity markets’ shall include over-the-counter markets and electricity exchanges for trading energy, capacity, balancing and ancillary services in all timeframes, including forward, day-ahead and intra-day markets.
Removed3. Network or retail tariffs may support dynamic pricing for demand response measures by final customers, such as:
Removed(a) time-of-use tariffs;
Removed(b) critical peak pricing;
Removed(c) real time pricing; and
Removed(d) peak time rebates.
Removed___________
RemovedANNEX XIII
RemovedENERGY EFFICIENCY REQUIREMENTS FOR TRANSMISSION SYSTEM OPERATORS AND DISTRIBUTION SYSTEM OPERATORS
RemovedTransmission system operators and distribution system operators shall:
Removed(a) set up and make public their standard rules relating to the bearing and sharing of costs of technical adaptations, such as grid connections, grid reinforcements and the introduction of new grids, improved operation of the grid and rules on the non-discriminatory implementation of the grid codes, which are necessary in order to integrate new producers feeding electricity produced from high-efficiency cogeneration into the interconnected grid;
Removed(b) provide any new producer of electricity produced from high-efficiency cogeneration wishing to be connected to the system with the comprehensive and necessary information required, including:
Removed(i) a comprehensive and detailed estimate of the costs associated with the connection;
Removed(ii) a reasonable and precise timetable for receiving and processing the request for grid connection;
Removed(iii) a reasonable indicative timetable for any proposed grid connection. The overall process to become connected to the grid should be no longer than 24 months, bearing in mind what is reasonably practicable and non-discriminatory;
Removed(c) provide standardised and simplified procedures for the connection of distributed high-efficiency cogeneration producers to facilitate their connection to the grid.
RemovedThe standard rules referred to in point (a) shall be based on objective, transparent and non-discriminatory criteria taking particular account of all the costs and benefits associated with the connection of those producers to the grid. They may provide for different types of connection.
Removed_____________
RemovedANNEX XIV
RemovedMinimum items to be included in energy performance contracts or in the associated tender specifications
Removed– Findings /recommendations of an analysis/ audit carried out before the contract has been concluded that covers energy use of the building with a view to implement energy efficiency improvement measures.
Removed– Clear and transparent list of the efficiency measures to be implemented or the efficiency results to be obtained.
Removed– Guaranteed savings to be achieved by implementing the measures of the contract.
Removed– Duration and milestones of the contract, terms and period of notice.
Removed– Clear and transparent list of the obligations of each contracting party.
Removed– Reference date(s) to establish achieved savings.
Removed– Clear and transparent list of steps to be performed to implement a measure or package of measures and, where relevant, associated costs.
Removed– Obligation to fully implement the measures in the contract and documentation of all changes made during the project.
Removed– Regulations specifying the inclusion of equivalent requirements in any subcontracting with third parties.
Removed– Clear and transparent display of financial implications of the project and distribution of the share of both parties in the monetary savings achieved (i.e. remuneration of the service provider).
Removed– Clear and transparent provisions on measurement and verification of the guaranteed savings achieved, quality checks and guarantees.
Removed– Provisions clarifying the procedure to deal with changing framework conditions that affect the content and the outcome of the contract (i.e. changing energy prices, use intensity of an installation).
Removed– Detailed information on the obligations of each of the contracting party and of the penalties for their breach.
Removed_________
RemovedANNEX XV
RemovedPart A
RemovedRepealed Directive with list of the successive amendments thereto (referred to in Article 36)
RemovedPart B
RemovedTime-limits for transposition into national law (referred to in Article 36)
Removed_____________
RemovedANNEX XVI
RemovedCorrelation Table
Removed_________
Sources & citation
Where the facts on this page come from, and how to cite it.
- Permalink
- https://news.eu-parl.st-solutions.dev/texts/TA-9-2022-0315/compare/TA-9-2023-0263?all=1&part=21
- Data source
- Licensed CC BY 4.0.
- Retrieved
- 29 September 2026
Cite as
European Parliament (2023). “Changes between TA-9-2022-0315 and TA-9-2023-0263”. Text, 11 July 2023. from TA-9-2022-0315, to TA-9-2023-0263. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/TA-9-2022-0315/compare/TA-9-2023-0263?all=1&part=21 (retrieved 29 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2023-07-11,
author = {{European Parliament}},
title = {{Changes between TA-9-2022-0315 and TA-9-2023-0263}},
year = {2023},
date = {2023-07-11},
howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/TA-9-2022-0315/compare/TA-9-2023-0263?all=1&part=21}},
url = {https://news.eu-parl.st-solutions.dev/texts/TA-9-2022-0315/compare/TA-9-2023-0263?all=1&part=21},
urldate = {2026-09-29},
publisher = {EU Parl Watch Research},
note = {Text. from TA-9-2022-0315, to TA-9-2023-0263. Data: European Parliament Open Data (CC BY 4.0)}
}