Text · Comparison of two versions
Changes from report parliamentary committee draft to plenary report
ITRE-PR-734108 → A-9-2023-0032
- From
- ITRE-PR-734108 report parliamentary committee draft of 22 Jun 2022
- To
- A-9-2023-0032 Plenary report of 16 Feb 2023
- Changes
- Not comparable
- Paragraphs
- +1 405 added · −189 removed · 6 changed
More facts (2)
- Title (from)
- on the proposal for a regulation of the European Parliament and of the Council on the internal markets for renewable and natural gases and for hydrogen (recast)
- Title (to)
- on the proposal for a regulation of the European Parliament and of the Council on the internal markets for renewable and natural gases and for hydrogen (recast)
These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.
Every difference
The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.
Part 22 of 30: Paragraphs 1261–1320
Added(f) the rules applicable for capacity trade on the secondary market vis-à-vis the transmission system operator;
Added(g) rules on balancing and methodology for the calculation of imbalance charges;
Added(h) if applicable, the flexibility and tolerance levels included in transportation and other services without separate charge, as well as any flexibility offered in addition to this and the corresponding charges;
Added(i) a detailed description of the gas system of the transmission system operator and its relevant points of interconnection as defined in point 3.2 of this Annex as well as the names of the operators of the interconnected systems or facilities;
Added(j) the rules applicable for connection to the system operated by the transmission system operator;
Added(k) information on emergency mechanisms, as far as it is the responsibility of the transmission system operator, such as measures that can lead to the disconnection of customers groups and other general liability rules that apply to the transmission system operator;
Added(l) procedures agreed upon by transmission system operators at interconnection points, of relevance for access of network users to the transmission systems concerned, relating to interoperability of the network, agreed procedures on nomination and matching procedures and other agreed procedures that set out provisions in relation to gas flow allocations and balancing, including the methods used;
Added(m) transmission system operators shall publish a detailed and comprehensive description of the methodology and process, including information on the parameters employed and the key assumptions, used to calculate the technical capacity.
Added3.2. Definition of all relevant points for transparency requirements
Added1. Relevant points shall include at least:
Added(a) all entry and exit points to and from a transmission network operated by a transmission system operator, with the exception of exit points connected to a single final customer, and with the exception of entry points linked directly to a production facility of a single producer that is located within the EU;
Added(b) all entry and exit points connecting balancing zones of transmission system operators;
Added(c) all points connecting the network of a transmission system operator with an LNG terminal, physical gas hubs, storage and production facilities, unless these production facilities are exempted under point (a);
Added(d) all points connecting the network of a given transmission system operator to infrastructure necessary for providing ancillary services as defined by Article 2(30) of [recast Gas Directive as proposed by COM(2021)xxx].
Added2. Information for single final customers and for production facilities, that is excluded from the definition of relevant points as described under point 3.2(1)(a), shall be published in aggregate format, at least per balancing zone. The aggregation of single final customers and of production facilities, excluded from the definition of relevant points as described under point 3.2(1)(a), shall for the application of this Annex be considered as one relevant point.
Added3. Where points between two or more transmission operators are managed solely by the transmission operators concerned, with no contractual or operational involvement of system users whatsoever, or where points connect a transmission system to a distribution system and there is no contractual congestion at these points, transmission system operators shall be exempted for these points from the obligation to publish the requirements under point 3.3 of this Annex. The national regulatory authority may require the transmission system operators to publish the requirements under point 3.3 of this Annex for groups or all of the exempted points. In such case, the information, if available to the TSO, shall be published in an aggregated form at a meaningful level, at least per balancing zone. This aggregation of these points shall for the application of this annex be considered as one relevant point.
Added3.3. Information to be published at all relevant points and the time schedule according to which this information should be published
Added1. At all relevant points, transmission system operators shall publish the information as listed in points (a) to (g), for all services and ancillary services provided (in particular information on blending, ballasting and conversion). This information shall be published on a numerical basis, in hourly or daily periods, equal to the smallest reference period for capacity booking and (re-)nomination and the smallest settlement period for which imbalance charges are calculated. If the smallest reference period is different from a daily period, information as listed in points (a) to (g) shall be made available also for the daily period. This information and updates shall be published as soon as available to the system operator (‘near real time’).
Added(a) the technical capacity for flows in both directions;
Added(b) the total contracted firm and interruptible capacity in both directions;
Added(c) the nominations and re-nominations in both directions;
Added(d) the available firm and interruptible capacity in both directions;
Added(e) actual physical flows;
Added(f) planned and actual interruption of interruptible capacity;
Added(g) planned and unplanned interruptions to firm services as well as the information on restoration of the firm services (in particular, maintenance of the system and the likely duration of any interruption due to maintenance). Planned interruptions shall be published at least 42 days in advance;
Added(h) occurrence of unsuccessful, legally valid requests for firm capacity products with a duration of one month or longer including the number and volume of the unsuccessful requests;
Added(i) in the case of auctions, where and when firm capacity products with a duration of one month or longer have cleared at prices higher than the reserve price;
Added(j) where and when no firm capacity product with a duration of one month or longer has been offered in the regular allocation process;
Added(k) total capacity made available through the application of the congestion-management procedures laid down in points 2.2.2, 2.2.3, 2.2.4 and 2.2.5 per applied congestion-management procedure.
Added2. At all relevant points, the information under points 3.3(1)(a), (b) and (d) shall be published for a period at least 24 months ahead.
Added3. At all relevant points, transmission system operators shall publish historical information on the requirements of points 3.3(1)(a) to (g) for the past 5 years on a rolling basis.
Added4. Transmission system operators shall publish measured values of the gross calorific value, the Wobbe index, the hydrogen content blended in the natural gas system, methane content and oxygen content at all relevant points, on a daily basis. Preliminary figures shall be published at the latest 3 days following the respective gas day. Final figures shall be published within 3 months after the end of the respective month.
Added5. For all relevant points, transmission system operators shall publish available capacities, booked and technical capacities, on an annual basis over all years where capacity is contracted plus 1 year, and at least for the next 10 years. This information shall be updated at least every month or more frequently, if new information becomes available. The publication shall reflect the period for which capacity is offered to the market.
Added3.4. Information to be published regarding the transmission system and the time schedule according to which this information should be published
Added1. Transmission system operators shall ensure the publication on a daily basis and updated every day the aggregated amounts of capacities offered, and contracted on the secondary market (i.e. sold from one network user to another network user), where the information is available to the TSO. This information shall include the following specifications:
Added(a) interconnection point where the capacity is sold;
Added(b) type of capacity, i.e. entry, exit, firm, interruptible;
Added(c) quantity and duration of the capacity usage rights;
Added(d) type of sale, e.g. transfer or assignment;
Added(e) the total number of trades/transfers;
Added(f) any other conditions known to the transmission system operator as mentioned in point 3.3.
AddedIn so far such information is provided by a third party, transmission system operators shall be exempted from this provision.
Added2. Transmission system operators shall publish harmonised conditions under which capacity transactions (e.g. transfers and assignments) will be accepted by them. These conditions must at least include:
Added(a) a description of standardised products which can be sold on the secondary market;
Added(b) lead time for the implementation/acceptation/registration of secondary trades. In case of delays the reasons have to be published;
Added(c) the notification to the transmission system operator by the seller or the third party as referred to under point 3.4(1) about name of seller and buyer and capacity specifications as outlined in point 3.4(1).
AddedIn so far such information is provided by a third party, transmission system operators shall be exempted from this provision.
Added3. Regarding the balancing service of its system, each transmission system operator shall provide to each network user, for each balancing period, its specific preliminary imbalance volumes and cost data per individual network user, at the latest 1 month after the end of the balancing period. Final data of customers supplied according to standardised load profiles may be provided up to 14 months later. In so far such information is provided by a third party, transmission system operators shall be exempted from this provision. The provision of this information shall respect confidentiality of commercially sensitive information.
Added4. Where flexibility services, other than tolerances, are offered for third party access, transmission system operators shall publish daily forecasts on a day-ahead basis of the maximum amount of flexibility, the booked level of flexibility and the availability of flexibility for the market for the next gas day. The transmission system operator shall also publish ex- post information on the aggregate utilization of every flexibility service at the end of each gas day. If the national regulatory authority is satisfied that such information could give room to potential abuse by network users, it may decide to exempt the transmission system operator from this obligation.
Added5. Transmission system operators shall publish, per balancing zone, the amount of gas in the transmission system at the start of each gas day and the forecast of the amount of gas in the transmission system at the end of each gas day. The forecast amount of gas for the end of the gas day shall be updated on an hourly basis throughout the gas day. If imbalance charges are calculated on an hourly basis, the transmission system operator shall publish the amount of gas in the transmission system on an hourly basis. Alternatively, transmission system operators shall publish, per balancing zone, the aggregate imbalance position of all users at the start of each balancing period and the forecast of the aggregated imbalance position of all users at the end of each gas day. If the national regulatory authority is satisfied that such information could give room to potential abuse by network users, it may decide to exempt the transmission system operator from this obligation.
Added6. Transmission system operators shall provide user-friendly instruments for calculating tariffs.
Added7. Transmission system operators shall keep at the disposal of the relevant national authorities, for at least five (5) years, effective records of all capacity contracts and all other relevant information in relation to calculating and providing access to available capacities, in particular individual nominations and interruptions. Transmission system operators must keep documentation of all relevant information under point 3.3(4) and (5) for at least five (5) years and make them available to the regulatory authority upon request. Both parties shall respect commercial confidentiality.
Added8. Transmission system operators shall publish at least annually, by a predetermined deadline, all planned maintenance periods that might affect network users’' rights from transport contracts and corresponding operational information with adequate advance notice. This shall include publishing on a prompt and non-discriminatory basis any changes to planned maintenance periods and notification of unplanned maintenance, as soon as that information becomes available to the transmission system operator. During maintenance periods, transmission system operators shall publish regularly updated information on the details of and expected duration and effect of the maintenance.
Added4. Format and content of the publication of technical information on network access by hydrogen network operators and information to be published at all relevant points and time schedule
Added4.1. Format of the publication of technical information on network access
Added1. Hydrogen network operators shall provide all information necessary for network users to gain effective access to the network referred to under points 4.2 and 4.3 in the following manner:
Added(a) on a website accessible to the public, free of charge and without any need to register or otherwise sign on with the hydrogen network operator;
Added(b) on a regular/rolling basis; the frequency shall be according to the changes that take place and the duration of the service;
Added(c) in a user-friendly manner;
Added(d) in a clear, quantifiable, easily accessible way and on a non-discriminatory basis;
Sources & citation
Where the facts on this page come from, and how to cite it.
- Permalink
- https://news.eu-parl.st-solutions.dev/texts/ITRE-PR-734108/compare/A-9-2023-0032?all=1&part=22
- Data source
- Licensed CC BY 4.0.
- Retrieved
- 30 September 2026
Cite as
European Parliament (2023). “Changes between ITRE-PR-734108 and A-9-2023-0032”. Text, 16 February 2023. from ITRE-PR-734108, to A-9-2023-0032. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/ITRE-PR-734108/compare/A-9-2023-0032?all=1&part=22 (retrieved 30 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2023-02-16,
author = {{European Parliament}},
title = {{Changes between ITRE-PR-734108 and A-9-2023-0032}},
year = {2023},
date = {2023-02-16},
howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/ITRE-PR-734108/compare/A-9-2023-0032?all=1&part=22}},
url = {https://news.eu-parl.st-solutions.dev/texts/ITRE-PR-734108/compare/A-9-2023-0032?all=1&part=22},
urldate = {2026-09-30},
publisher = {EU Parl Watch Research},
note = {Text. from ITRE-PR-734108, to A-9-2023-0032. Data: European Parliament Open Data (CC BY 4.0)}
}