Text · Opinion parliamentary committee
On the proposal for a directive of the European Parliament and of the Council amending Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) and Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste
Full title
On the proposal for a directive of the European Parliament and of the Council amending Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) and Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste
Document ITRE-AD-736732 · COM(2022)0156 – C90144/2022 – 2022/0104(COD)
- Kind
- Opinion parliamentary committee ITRE-AD-736732
- Date
- 29 March 2023
- Committee
- Committee on Industry, Research and Energy
- Rapporteur
- Tomas Tobé
- Dossier
- 2022-0104
More facts (3)
- Formats
- Official page PDF Word
- Subject matter
- DECH, POLL, ENV
- Reference
- COM(2022)0156 – C90144/2022 – 2022/0104(COD)
In short
A summary of the text written by AI; ¶ opens the paragraph it rests on.
AI: In short Written by AI from the official text — check the source · deepseek-flash · 26 Sept 2026
The Committee on Industry, Research and Energy gives its opinion on the Commission proposal to amend the Industrial Emissions Directive and the Landfill Directive. It supports the proposal's ambition and the new innovation centre, but opposes deleting energy efficiency requirements and introducing environmental performance limit values. It proposes amendments to make environmental performance values indicative rather than mandatory, to keep the Sevilla process for agreeing Best Available Techniques, and to require an assessment by the Sevilla technical working group before the innovation centre's findings feed into BAT reference documents. It also proposes longer test periods for emerging and innovative techniques, a derogation for unforeseen interruptions in raw material or fuel supply, and transformation plans at company level.
Position. The committee supports the proposal's ambition and the innovation centre, but opposes deleting energy efficiency requirements and introducing environmental performance limit values. It proposes amendments to make environmental performance values indicative, keep the Sevilla process, extend test periods for emerging techniques, allow a supply-interruption derogation, and require company-level transformation plans.
Key points
- The rapporteur supports the Commission proposal's ambition and the new centre for innovative techniques, and says the Industrial Emissions Directive brings environmental, climate and health benefits.
- The rapporteur says the proposal puts unjustified burden on operators and opposes deleting energy efficiency requirements and introducing environmental performance limit values.
- The rapporteur wants the Sevilla process maintained and says the innovation centre's findings should not go directly into BAT reference documents without technical assessment in that process.
- The rapporteur says emerging and innovative techniques should get a longer test period, extendable by the competent authority.
- Amendment 1 deletes the recital on submitting installations to energy efficiency requirements for combustion units or other units emitting carbon dioxide.
- Amendment 3 makes environmental performance values on consumption and resource efficiency indicative rather than mandatory, and adds reuse and cross-media, national and geographical considerations.
- Amendment 4 adds a recital on water risks, a water-smart society, water security and closed water and resource loops.
- Amendment 5 says the innovation centre's findings should be used as a basis for the exchange of information on BAT reference documents, and covers techniques at technology readiness level 6-7.
- Amendment 6 requires energy-intensive installations to produce transformation plans at company level by 30 June 2030, and other Annex I installations after BAT conclusions published after 1 January 2030.
- Amendment 9 requires the competent authority to set emission limit values consistent with the lowest emissions achievable by applying BAT, based on an operator assessment of the whole BAT-AEL range.
- Amendment 12 lets the competent authority set less strict emission limit values for up to three months, extendable by three months, when an installation faces an unforeseen interruption in raw material or fuel supply.
- Amendments 16 and 17 extend the test period for emerging and innovative techniques to 48 months and let the competent authority set indicative emission limit values at the operator's request.
Who is affected
- Industrial operators covered by the directive, who would face indicative rather than mandatory environmental performance values and new transformation plan duties.
- Energy-intensive installations listed in Annex I, which must produce transformation plans at company level by 30 June 2030.
- Competent authorities, which would set emission limit values based on operator assessments and may grant derogations.
- The Commission, which must take account of the innovation centre's findings and be informed of derogations granted.
Figures and deadlines
- 30 June 2030: deadline for energy-intensive installations to produce transformation plans at company level.
- 1 January 2030: date after which BAT conclusions trigger transformation plan requirements for other Annex I installations.
- 2030-2050: period covered by the transformation plans.
- 48 months: maximum total test period for emerging and innovative techniques.
- Three months: maximum period for less strict emission limit values due to unforeseen supply interruption, extendable by an additional three months.
- TRL 6-7: technology readiness level at which innovative techniques are to be collected and analysed by the centre.
Text
The text as parsed from the official Word file. Every paragraph has a link (¶) and can be saved to a project as a passage.
Jump to an amendment (20)
Short justification
The Rapporteur supports many elements in the Commission proposal especially regarding the ambition of a more effective Directive and the introduction of a new centre for innovative techniques. The Rapporteur believes that the Industrial Emissions Directive has been and is crucial to lower polluting and emissions from the industrial sector in the European Union, is of the opinion that the Directive brings environmental, climate and health benefits for the European Union; believes that the current working method (the Sevilla process) that is being used to agree upon the Best Available Techniques (BAT) for pollution prevention and control, should be maintained.
However, the Rapporteur is of the opinion that the Commission proposal puts unjustified burden on operators and overlooks the risk of sub optimisations, believes that the Directive must acknowledge adjustments between contrary environmental values into consideration in order to make this legislation better for climate, environment and people.
On this note, the Rapporteur opposes the deletion of energy efficiency requirements and the introduction of environmental performance limit values. The electrification of industry will require more energy, setting strict consumption requirements is to obstruct the electrification of these sectors.
Secondly, the Rapporteur is concerned that the Commission overlooks the role of the Sevilla process when implementing the Innovation centre for industrial transformation and emissions (INCITE), believes that the centre will give crucial contribution to the analysis of innovative and emerging techniques. Is however concerned that the Commission proposal suggests that the findings of the centre can be directly included in BREFs without technical assessment in the Sevilla process.
Thirdly, the rapporteur believes that technical development and innovation is key for the European Union to reach its climate goals. Believes, that innovation and development of new techniques should be given adequate time for implementation. Is therefore, of the opinion that emerging and innovative techniques should be given a longer test period with the possibility of extension by the competent authority to ensure legal certainty for operators.
The Committee on Industry, Research and Energy calls on the Committee on the Environment, Public Health and Food Safety, as the committee responsible, to take into account the following amendments:
| Text proposed by the Commission | Amendment |
|---|---|
| (9) In order to foster energy efficiency of installations within the scope of Directive 2010/75/EU which are carrying out activities listed in Annex I to Directive 2003/87/EC, it is appropriate to submit those installations to energy efficiency requirements in respect of combustion units or other units emitting carbon dioxide on the site. | deleted |
| Text proposed by the Commission | Amendment |
|---|---|
| (15) Providing a high level of protection of human health and the environment as a whole requires inter alia the establishment in permits of emission limit values at a level that ensures compliance with the applicable emission levels associated with the best available techniques set out in the BAT conclusions. Emission levels associated with the best available techniques (BAT-AELs) are usually expressed as ranges, rather than as single values, to reflect the differences within a given type of installations that result in variations in the environmental performances achieved when applying BAT. For example, a given BAT will not deliver the same performance for different installations, some BATs may not be suitable for use in certain installations, or a combination of BATs may be more effective on some pollutants or environmental media than others. The achievement of a high level of protection of human health and the environment as a whole has been jeopardised by the practice of setting emission limit values at the laxest end of the range of emission levels associated with the best available techniques, without considering the potential of a given installation to achieve lower emission levels through the application of best available techniques. Such practice discourages frontrunners from implementing more effective techniques, and hinders the achievement of a level-playing field at a high level of protection of human health and the environment. Competent authorities should therefore be required to set in permits the lowest possible emission limit values which reflect the performance of BAT for the specific installations, taking into consideration the whole range of BAT-AELs and aiming at the best environmental performance possible for the installations; unless the operator demonstrates that applying best available techniques as described in the BAT conclusions only allows the concerned installation to meeting less strict emission limit values. | (15) Providing a high level of protection of human health and the environment as a whole requires inter alia the establishment in permits of emission limit values at a level that ensures compliance with the applicable emission levels associated with the best available techniques set out in the BAT conclusions. Emission levels associated with the best available techniques (BAT-AELs) are usually expressed as ranges, rather than as single values, to reflect the differences within a given type of installations that result in variations in the environmental performances achieved when applying BAT. For example, a given BAT will not deliver the same performance for different installations, some BATs may not be suitable for use in certain installations, or a combination of BATs may be more effective on some pollutants or environmental media than others. The achievement of a high level of protection of human health and the environment as a whole has been jeopardised by the practice of setting emission limit values at the laxest end of the range of emission levels associated with the best available techniques, without considering the potential of a given installation to achieve lower emission levels through the application of best available techniques. Such practice discourages frontrunners from implementing more effective techniques, and hinders the achievement of a level-playing field at a high level of protection of human health and the environment. Competent authorities should therefore be required to set in permits the lowest possible emission limit values which reflect the BAT-AEL range for the specific installations, taking into consideration the whole range of BAT-AELs and aiming at the best environmental performance possible for the installations; unless the operator demonstrates that applying best available techniques as described in the BAT conclusions only allows the concerned installation to meeting less strict emission limit values. |
| Text proposed by the Commission | Amendment |
|---|---|
| (16) The contribution of Directive 2010/75/EU to resource and energy efficiency and circular economy in the Union should be made more effective, taking into consideration the ‘Energy Efficiency First’ as a guiding principle of the Union energy policy. Therefore, the permits should establish, where possible, mandatory environmental performance limit values on consumption and resource efficiency levels, including on the use of water, energy and recycled materials, based on the environmental performance levels associated with the best available techniques (BAT AEPLs) set out in decisions on BAT conclusions. | (16) The contribution of Directive 2010/75/EU to resource and energy efficiency and circular economy in the Union should be made more effective, taking into consideration the ‘Energy Efficiency First’ as a guiding principle of the Union energy policy. Therefore, the permits should establish, where possible, indicative environmental performance level values on consumption and resource efficiency levels, including on the consumption of water, energy and raw materials, and their reuse, based on the environmental performance levels associated with the best available techniques (BAT AEPLs) set out in decisions on BAT conclusions, taking into consideration cross-media effects, national conditions and the geographical location of installations. |
| Text proposed by the Commission | Amendment |
|---|---|
| (16a) Considering the recurrent droughts and floods in Europe that have a direct impact on water availability for the European industry, which is the largest water consumer in Europe, industrial stakeholders need to carefully consider quantitative and qualitative water risks both on and by their activities. Therefore, European industry needs to be mobilised to achieve a water-smart society and to provide a coherent water strategy, recognising and realising the value of water for the purpose of ensuring water security, safety, and sustainability. All available water sources need to be managed in such a way that water scarcity and pollution is avoided. Water and resource loops are largely closed in order to foster a circular economy and resource efficiency, while ensuring that the water system is resilient against droughts, floods and climate change. Industry needs to ensure that its planned and digitalised management enables prediction and agility to perform under stress as well as uncertainties, and that all relevant stakeholders are involved in water governance. |
| Text proposed by the Commission | Amendment |
|---|---|
| (24) The evaluation of Directive 2010/75/EU found that, even if it should foster the transformation of European industry, it is not dynamic enough and does not sufficiently support the deployment of innovative processes and technologies. It is therefore appropriate to facilitate the testing and deployment of emerging techniques with improved environmental performance, to facilitate cooperation with researchers and industries in publicly funded research projects subject to the conditions foreseen in the relevant European and national funding instruments, as well as to set up a dedicated centre to support innovation by collecting and analysing information on innovative techniques, including emerging techniques, relevant to activities within the scope of that Directive and to characterise their level of development from research to deployment (technology readiness level or ‘TRL’) and their environmental performance. This will also inform the exchange of information on drawing up, reviewing and updating BAT reference documents. Innovative techniques to be collected and analysed by the centre should be at least at the level of technology demonstrated in relevant environment (industrially relevant environment in the case of key enabling technologies) or system prototype demonstration in operation environment (TRL 6-7). | (24) The evaluation of Directive 2010/75/EU found that, even if it should foster the transformation of European industry, it is not dynamic enough and does not sufficiently support the deployment of innovative processes and technologies. It is therefore appropriate to facilitate the testing and deployment of emerging techniques with improved environmental performance, to facilitate cooperation with researchers and industries in publicly funded research projects subject to the conditions foreseen in the relevant European and national funding instruments, as well as to set up a dedicated centre to support innovation by collecting and analysing information on innovative and emerging techniques, relevant to activities within the scope of that Directive and to characterise their level of development from research to deployment (technology readiness level or ‘TRL’) and their environmental performance. This should be used as a basis for the exchange of information on drawing up, reviewing and updating BAT reference documents. Innovative techniques to be collected and analysed by the centre should be at least at the level of technology demonstrated in relevant environment (industrially relevant environment in the case of key enabling technologies) or system prototype demonstration in operation environment (TRL 6-7). |
| Text proposed by the Commission | Amendment |
|---|---|
| (25) Achieving Union objectives regarding a clean, circular and climate neutral economy by 2050 calls for a deep transformation of the Union economy. Consistently with the 8th Environmental Action Programme, operators of installations covered by Directive 2010/75/EU should therefore be required to include transformation plans in their environmental management systems. Such transformation plans will also complement the Corporate Sustainability Reporting requirements under Directive 2013/34/EU of the European Parliament and of the Council75by providing a means for concrete implementation of these requirements at installation level. The first priority is the transformation of energy-intensive activities listed in Annex I. Therefore, the operators of energy-intensive installations should produce transformation plans by 30 June 2030. Operators of installations carrying out other activities listed in Annex I should be required to produce transformation plans as part of the permit reconsideration and update following the publication of decisions on BAT conclusions published after 1 January 2030. Whilst the transformation plans should remain indicative documents prepared under the responsibility of the operators, the audit organisation contracted by the operators as part of their environmental management systems should check that they contain the minimum information to be set by the European Commission in an implementing act, and the operators should make the transformation plans public. | (25) Achieving Union objectives regarding a clean, circular and climate neutral economy by 2050 calls for a deep transformation of the Union economy. Consistently with the 8th Environmental Action Programme, operators of installations covered by Directive 2010/75/EU should therefore include transformation plans in their environmental management systems. Such transformation plans will also complement the Corporate Sustainability Reporting requirements under Directive 2013/34/EU of the European Parliament and of the Council75 by providing a means for concrete implementation of these requirements at installation level. The first priority is the transformation of energy-intensive activities listed in Annex I. Therefore, the operators of energy-intensive installations should produce transformation plans at company level by 30 June 2030. Operators of installations carrying out other activities listed in Annex I should be required to produce transformation plans as part of the permit reconsideration and update following the publication of decisions on BAT conclusions published after 1 January 2030. The operator should assess the progress made towards intermediate targets every three years and should update its transformation plan at least every ten years. The ompany level transformation plans c should remain indicative documents prepared under the responsibility of the operators. The operators should make those transformation plans public, taking into account the confidentiality of trade and business secrets. |
| 75 Directive 2013/34/EU of the European Parliament and of the Council of 26 June 2013 on the annual financial statements, consolidated financial statements and related reports of certain types of undertakings, amending Directive 2006/43/EC of the European Parliament and of the Council and repealing Council Directives 78/660/EEC and 83/349/EEC; OJ L 182, 29.6.2013, p. 19–76. | 75 Directive 2013/34/EU of the European Parliament and of the Council of 26 June 2013 on the annual financial statements, consolidated financial statements and related reports of certain types of undertakings, amending Directive 2006/43/EC of the European Parliament and of the Council and repealing Council Directives 78/660/EEC and 83/349/EEC; OJ L 182, 29.6.2013, p. 19–76. |
| Text proposed by the Commission | Amendment |
|---|---|
| (7) In Article 9, paragraph (2) is deleted. | deleted |
| Text proposed by the Commission | Amendment |
|---|---|
| The competent authority shall set out in an annex to the permit conditions the reasons for the application of the second subparagraph, including the result of the assessment by the operator of the fulfilment of the required conditions. | The competent authority shall set out in an annex to the permit conditions the reasons for the application of the second subparagraph, including the summary of result of the assessment by the operator of the fulfilment of the required conditions. |
| Text proposed by the Commission | Amendment |
|---|---|
| The competent authority shall set the strictest possible emission limit values that are consistent with the lowest emissions achievable by applying BAT in the installation, and that ensure that, under normal operating conditions, emissions do not exceed the emission levels associated with the best available techniques (BAT-AELs) as laid down in the decisions on BAT conclusions referred to in Article 13(5). The emission limit values shall be based on an assessment by the operator analysing the feasibility of meeting the strictest end of the BAT-AEL range and demonstrating the best performance the installation can achieve by applying BAT as described in BAT conclusions. The emission limit values shall be set through either of the following: | Following the publication of decisions on BAT reference documents derived pursuant to this Directive, the competent authority shall set emission limit values that are consistent with the lowest emissions achievable by applying BAT in the installation and taking into account cross-media effects, and that ensure that, under normal operating conditions, emissions do not exceed the emission levels associated with the best available techniques (BAT-AELs) as laid down in those decisions on BAT conclusions referred to in Article 13(5). The emission limit values shall be based on an assessment by the operator analysing the feasibility of meeting the whole BAT-AEL range and demonstrating the lowest emission limit the installation can achieve under normal operating conditions by applying BAT as described in BAT conclusions. The emission limit values shall be set through either of the following: |
| Text proposed by the Commission | Amendment |
|---|---|
| 3a. The competent authority shall set environmental performance limit values that ensure that, under normal operating conditions, such performance limits values do not exceed the environmental performance levels associated with BATs as laid down in the decisions on BAT conclusions referred to in Article 13(5). | 3a. The competent authority shall set indicative environmental performance limit levels that ensure that, under normal operating conditions, such performance limits values do not exceed the environmental performance levels associated with BATs as laid down in the decisions on BAT conclusions referred to in Article 13(5). |
| Text proposed by the Commission | Amendment |
|---|---|
| (ba) new investment cycle related to the sustainability transition of the operator’s group. |
| Text proposed by the Commission | Amendment |
|---|---|
| The competent authority may, in cases where an installation faces an unforeseen interruption in the supply of raw materials or fuels, establish less strict emission limit values, for a maximum of three months, with the possibility of prolonging that derogation for an additional three months in exceptional cases. Member States shall inform the Commission of any derogation granted pursuant to this paragraph. The derogation shall cease to apply as soon as the supply conditions are sufficient. |
| Text proposed by the Commission | Amendment |
|---|---|
| PROMOTING INNOVATION’ | ENABLING INNOVATION’ |
| Text proposed by the Commission | Amendment |
|---|---|
| 2. The centre shall collect and analyse information on innovative techniques, including emerging techniques relevant to activities within the scope of this Directive, and characterise their level of development and their environmental performance. The Commission shall take into account the findings of the centre when preparing the work programme for the exchange of information referred to in Article 13(3), point (b), and when drawing up, reviewing and updating the BAT reference documents referred to in Article 13(1). | 2. The centre shall collect and analyse information on innovative techniques, including emerging techniques relevant to activities within the scope of this Directive, and characterise their level of development and their environmental performance. The Commission shall take into account the findings of the centre when preparing the work programme for the exchange of information referred to in Article 13(3), point (b), and when drawing up, reviewing and updating, after an assesment by the technical working group in Sevilla, the BAT reference documents referred to in Article 13(1). |
| Text proposed by the Commission | Amendment |
|---|---|
| Testing of emerging techniques | Testing of emerging and innovative techniques |
| Text proposed by the Commission | Amendment |
|---|---|
| Without prejudice to Article 18, the competent authority may grant temporary derogations from the requirements set out in Article 15(2) and (3) and from the principles set out in Article 11, points (a) and (b), for the testing of emerging techniques for a total period of time not exceeding 24 months. | Without prejudice to Article 18, the competent authority may grant temporary derogations from the requirements set out in Article 15(2) and (3) and from the principles set out in Article 11, points (a) and (b), for the testing of emerging and innovative techniques for a total period of time not exceeding 48 months. |
| Text proposed by the Commission | Amendment |
|---|---|
| By way of derogation from Article 21(3), the competent authority may set emission limit values that ensure that, within 6 years of publication of a decision on BAT conclusions in accordance with Article 13(5) relating to the main activity of an installation, emissions shall not, under normal operating conditions, exceed emission levels associated with emerging techniques as laid down in the decisions on BAT conclusions. | By way of derogation from Article 15(3) and (3a) and 21(3), the competent authority may, at the request of the operator, set indicative emission limit values that ensure that, within the period in respect of which the competent authority and the operator have carried out an assessment, emissions shall not, under normal operating conditions, exceed emission levels associated with emerging techniques as laid down in the decisions on BAT conclusions. |
| Text proposed by the Commission | Amendment |
|---|---|
| Member States shall require that by 30 June 2030 the operator includes in its environmental management system referred to in Article 14a a transformation plan for each installation carrying out any activity listed in points 1, 2, 3, 4, 6.1 a, and 6.1 b of Annex I. The transformation plan shall contain information on how the installation will transform itself during the 2030-2050 period in order to contribute to the emergence of a sustainable, clean, circular and climate-neutral economy by 2050, using the format referred to in paragraph 4. | Member States shall request that by 30 June 2030 the operator includes in its environmental management system referred to in Article 14a an indicative transformation plan for the company’s grouped activities listed in points 1, 2, 3, 4, 6.1 a, and 6.1 b of Annex I. The transformation plan shall contain information on how the company will transform itself during the 2030-2050 period in order to contribute to the emergence of a sustainable, clean, circular and climate-neutral economy by 2050, using the format referred to in paragraph 4. The transformation plan shall include specific information on how the company plans to become more energy, water and resource efficient by laying down the measures that will be implemented to reduce the overall consumption and improve the efficiency of its operations. |
| Text proposed by the Commission | Amendment |
|---|---|
| Member States shall require that, as part of the review of the permit conditions pursuant to Article 21(3) following the publication of decisions on BAT conclusions after 1 January 2030, the operator includes in its environmental management system referred to in Article 14a a transformation plan for each installation carrying out any activity listed in Annex I that is not referred to in paragraph 1. The transformation plan shall contain information on how the installation will transform itself during the 2030-2050 period in order to contribute to the emergence of a sustainable, clean, circular and climate-neutral economy by 2050, using the format referred to in paragraph 4. | Member States shall require that, as part of the review of the permit conditions pursuant to Article 21(3) following the publication of decisions on BAT conclusions after 1 January 2030, the operator includes in its environmental management system referred to in Article 14a a transformation plan at company level, of any activity listed in Annex I that is not referred to in paragraph 1. The transformation plan shall contain information on how the company will transform to become more energy, water and resource efficient by laying down the measures that will be implemented during the 2030-2050 period in order to contribute to the emergence of a sustainable, clean, circular and climate-neutral economy by 2050, using the format referred to in paragraph 4. |
| Text proposed by the Commission | Amendment |
|---|---|
| 3. The operator shall make its transformation plan as well as the results of the assessment referred to in paragraphs 1 and 2 public, as part of the publication of its environmental management system. | 3. The company shall make its transformation plan, its updates as well as the results of the assessment referred to in paragraphs 1 and 2 public, as part of the publication of its environmental management system. |
Procedure pages and committee votes
How the committees handled the text and how their members voted on it. Collapsed.
Procedure – committee asked for opinion 1 block
| Title | Amending Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) and Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste | |
| References | COM(2022)0156 – C9-0144/2022 – 2022/0104(COD) | |
| Committee responsible Date announced in plenary | ENVI 2.5.2022 | |
| Opinion by Date announced in plenary | ITRE 2.5.2022 | |
| Associated committees - date announced in plenary | 20.10.2022 | |
| Rapporteur for the opinion Date appointed | Tomas Tobé 7.6.2022 | |
| Discussed in committee | 29.11.2022 | |
| Date adopted | 28.3.2023 | |
| Result of final vote | +: –: 0: | 50 16 1 |
| Members present for the final vote | Matteo Adinolfi, Nicola Beer, François-Xavier Bellamy, Hildegard Bentele, Tom Berendsen, Vasile Blaga, Paolo Borchia, Marc Botenga, Markus Buchheit, Martin Buschmann, Cristian-Silviu Buşoi, Jerzy Buzek, Maria da Graça Carvalho, Ignazio Corrao, Beatrice Covassi, Ciarán Cuffe, Josianne Cutajar, Nicola Danti, Martina Dlabajová, Christian Ehler, Valter Flego, Niels Fuglsang, Lina Gálvez Muñoz, Jens Geier, Nicolás González Casares, Bart Groothuis, Christophe Grudler, Robert Hajšel, Romana Jerković, Seán Kelly, Izabela-Helena Kloc, Łukasz Kohut, Andrius Kubilius, Marisa Matias, Dan Nica, Angelika Niebler, Niklas Nienaß, Johan Nissinen, Mauri Pekkarinen, Morten Petersen, Markus Pieper, Maria Spyraki, Beata Szydło, Riho Terras, Patrizia Toia, Marie Toussaint, Isabella Tovaglieri, Henna Virkkunen, Pernille Weiss, Carlos Zorrinho | |
| Substitutes present for the final vote | Alex Agius Saliba, Rasmus Andresen, Tiziana Beghin, Franc Bogovič, Jakop G. Dalunde, Pietro Fiocchi, Klemen Grošelj, Martin Hojsík, Marina Kaljurand, Dace Melbārde, Rob Rooken, Bronis Ropė, Ernő Schaller-Baross, Jordi Solé, Susana Solís Pérez | |
| Substitutes under Rule 209(7) present for the final vote | Pär Holmgren, Sven Simon |
Final vote by roll call in committee asked for opinion 3 blocks
50 · For
- ECR
- Pietro Fiocchi, Izabela-Helena Kloc, Beata Szydło
- ID
- Matteo Adinolfi, Paolo Borchia, Isabella Tovaglieri
- No group
- Ernő Schaller-Baross
- EPP
- François-Xavier Bellamy, Hildegard Bentele, Tom Berendsen, Vasile Blaga, Franc Bogovič, Cristian-Silviu Buşoi, Jerzy Buzek, Maria da Graça Carvalho, Christian Ehler, Seán Kelly, Andrius Kubilius, Dace Melbārde, Angelika Niebler, Markus Pieper, Sven Simon, Maria Spyraki, Riho Terras, Henna Virkkunen, Pernille Weiss
- Renew
- Nicola Beer, Nicola Danti, Martina Dlabajová, Valter Flego, Bart Groothuis, Klemen Grošelj, Christophe Grudler, Mauri Pekkarinen, Morten Petersen, Susana Solís Pérez
- S&D
- Alex Agius Saliba, Beatrice Covassi, Josianne Cutajar, Niels Fuglsang, Lina Gálvez Muñoz, Jens Geier, Nicolás González Casares, Robert Hajšel, Romana Jerković, Marina Kaljurand, Łukasz Kohut, Dan Nica, Patrizia Toia, Carlos Zorrinho
16 · Against
- ECR
- Johan Nissinen, Rob Rooken
- ID
- Markus Buchheit
- No group
- Tiziana Beghin, Martin Buschmann
- The Left
- Marc Botenga, Marisa Matias
- Greens
- Rasmus Andresen, Ignazio Corrao, Ciarán Cuffe, Jakop G. Dalunde, Pär Holmgren, Niklas Nienaß, Bronis Ropė, Jordi Solé, Marie Toussaint
Connections
The dossier, the decisions on this text and its other versions.
No connections found for this item.
Sources & citation
Where the facts on this page come from, and how to cite it.
- Data source
- Licensed CC BY 4.0.
- Retrieved
- 26 September 2026
Cite as
European Parliament (2023). “OPINION on the proposal for a directive of the European Parliament and of the Council amending Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) and Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste”. Text, 29 March 2023. docId ITRE-AD-736732. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/ITRE-AD-736732 (retrieved 26 September 2026). Data: EP Open Data API: document record, https://data.europarl.europa.eu/api/v2/documents/ITRE-AD-736732 (CC BY 4.0).
BibTeX
@misc{epw-text-itre-ad-736732,
author = {{European Parliament}},
title = {{OPINION on the proposal for a directive of the European Parliament and of the Council amending Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) and Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste}},
year = {2023},
date = {2023-03-29},
howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/ITRE-AD-736732}},
url = {https://news.eu-parl.st-solutions.dev/texts/ITRE-AD-736732},