Skip to content

Text · Amendment list

EU Emissions Trading System and market stability reserve: competitiveness and cost-effective decarbonisation

Document ENVI-AM-796496 · COM(2026)0616 – C100188/2026 – 2026/0212(COD)

Kind
Amendment list ENVI-AM-796496
Date
20 October 2026
Committee
Committee on the Environment, Climate and Food Safety
Dossier
2026-0212
More facts (2)
Reference
COM(2026)0616 – C100188/2026 – 2026/0212(COD)
More

Text

The text as parsed from the official Word file. Every paragraph has a link (¶) and can be saved to a project as a passage.

Jump to an amendment (276)

Amendment 2539

Li Andersson, Jonas Sjöstedt, Per Clausen

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) the generation and use of renewable energy sources, including biogas and biomethane;(a) the generation and use of renewable energy sources, including biogas;

Or. en

Justification

Biomethane should not be supported because its production is energy-intensive, can exacerbate methane leakage and dependence on intensive agriculture, and risks being used to justify continued investment in gas infrastructure despite limited sustainable feedstock and uncertain climate benefits.

Amendment 2540

Sirpa Pietikäinen

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) the generation and use of renewable energy sources, including biogas and biomethane;(a) the generation and use of renewable energy sources, including biogas

Or. en

Amendment 2541

Anna Zalewska, Jacek Ozdoba, Jadwiga Wiśniewska, Daniel Obajtek, Beata Szydło, Rihards Kols, Patryk Jaki, Marion Maréchal

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point aa (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(aa) the generation and use of low-carbon energy sources, including energy produced by small modular reactors (SMRs);

Or. en

Amendment 2542

Anna Zalewska, Jacek Ozdoba, Jadwiga Wiśniewska, Daniel Obajtek, Beata Szydło, Rihards Kols, Patryk Jaki, Marion Maréchal

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point ab (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ab) generation of geothermal electricity, heating, cooling, storage and associated by-products such as lithium, including support for geological exploration, financial derisking, feasibility and engineering design studies and innovation.

Or. en

Amendment 2543

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu, Adrian-George Axinia

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) the reduction of overall energy use through energy efficiency by at least 20% in industry, transport and buildings, avoiding any risk of fossil fuel lock-in and fostering circularity, and the recovery of waste heat from incineration plants for district heating;(b) the reduction of overall energy use through energy efficiency when technologicaly and economicaly feasible;

Or. en

Amendment 2544

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) the reduction of overall energy use through energy efficiency by at least 20% in industry, transport and buildings, avoiding any risk of fossil fuel lock-in and fostering circularity, and the recovery of waste heat from incineration plants for district heating;(b) the reduction of overall energy use through energy efficiency by at least 20% in industry, transport and buildings, and the recovery of waste heat for district heating, avoiding any risk of fossil fuel lock-in and fostering circularity, including through modal shift to energy-efficient rail transport and public transport;

Or. en

Justification

Waste heat can only be considered a sustainable source for district heating networks if it does not come from incineration, but rather for instance from wastewater treatment plants combined with a heat pump.

Amendment 2545

Sirpa Pietikäinen

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) the reduction of overall energy use through energy efficiency by at least 20% in industry, transport and buildings, avoiding any risk of fossil fuel lock-in and fostering circularity, and the recovery of waste heat from incineration plants for district heating;(b) the reduction of overall energy use through energy efficiency by at least 20% in industry, transport and buildings, avoiding any risk of fossil fuel lock-in and fostering circularity;

Or. en

Amendment 2546

Li Andersson, Jonas Sjöstedt, Per Clausen

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) the reduction of overall energy use through energy efficiency by at least 20% in industry, transport and buildings, avoiding any risk of fossil fuel lock-in and fostering circularity, and the recovery of waste heat from incineration plants for district heating;(b) the reduction of overall energy use through energy efficiency by at least 20% in industry, transport and buildings, avoiding any risk of fossil fuel lock-in and fostering circularity;

Or. en

Justification

Waste-heat recovery from incineration plants risks locking in carbon-intensive waste treatment capacity and undermining waste prevention, reuse and recycling.

Amendment 2547

Adam Jarubas, Andrzej Halicki, Riho Terras, Ewa Kopacz, Elżbieta Katarzyna Łukacijewska, Hanna Gronkiewicz-Waltz, Bartosz Arłukowicz

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) the reduction of overall energy use through energy efficiency by at least 20% in industry, transport and buildings, avoiding any risk of fossil fuel lock-in and fostering circularity, and the recovery of waste heat from incineration plants for district heating;(b) the reduction of overall energy use through energy efficiency by at least 20% at the specific project or modernised process level, avoiding any risk of fossil fuel lock-in and fostering circularity, and the recovery of waste heat from incineration plants for district heating;

Or. en

Justification

The list of priority investments must explicitly encompass key district heating decarbonization and electrification technologies. Inserting large-scale hydrogen-ready industrial boilers, large-scale heat pumps, electrode boilers, thermal energy storage, energy generation facilities, and process-level energy efficiency requirements into Article 10d(2) guarantees that these capital-intensive assets qualify for 100% priority funding without being restricted by administrative non-priority caps or misinterpreted at the whole-installation level.

Amendment 2548

Martin Hojsík, Michal Wiezik

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) generation of geothermal eletricity, heating, cooling, and storage including support for geological exploration, financial derisking schemes, feasibility and engineering studies.

Or. en

Justification

Several Member States that qualify for support from the Modernisation Fund and that have reservoirs of geothermal, have already used it to improve access to local renewable electricity, heating, cooling and storage (e.g. Croatia or Portugal). Some MSs complement support from Modernisation Fund with dedicated national funds. Nevertheless, overall this potential is largely overlooked by other beneficiaries, among others due to lack of awareness about the possible support for for projects of different kind of maturity.

Amendment 2549

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu, Adrian-George Axinia

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) electrification of demand side sectors including industry, buildings and transport;(c) electrification of demand side sectors including industry, buildings and transport when technologicaly and economicaly feasible;

Or. en

Amendment 2550

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) electrification of demand side sectors including industry, buildings and transport;(c) electrification of demand side sectors including industry, buildings and transport, including railway lines, terminals and rolling stock;

Or. en

Amendment 2551

Anna Zalewska, Jacek Ozdoba, Jadwiga Wiśniewska, Daniel Obajtek, Beata Szydło, Rihards Kols, Patryk Jaki, Marion Maréchal

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point ca (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ca) transition towards lower-emission energy systems with the use of gaseous fossil fuels where such investment contributes to significant lowering of emissions, strengthening system adequacy and enhancing the security of energy supply.

Or. en

Amendment 2552

Adam Jarubas, Andrzej Halicki, Riho Terras, Ewa Kopacz, Elżbieta Katarzyna Łukacijewska, Hanna Gronkiewicz-Waltz, Bartosz Arłukowicz

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) the modernisation and expansion of electricity, hydrogen, district heating and CO2 infrastructure, including energy storage;(d) the modernisation and expansion of electricity, hydrogen, district heating, including energy generation facilities, and CO2 infrastructure, including energy storage and thermal energy storage;

Or. en

Justification

The list of priority investments must explicitly encompass key district heating decarbonization and electrification technologies. Inserting large-scale hydrogen-ready industrial boilers, large-scale heat pumps, electrode boilers, thermal energy storage, energy generation facilities, and process-level energy efficiency requirements into Article 10d(2) guarantees that these capital-intensive assets qualify for 100% priority funding without being restricted by administrative non-priority caps or misinterpreted at the whole-installation level.

Amendment 2553

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) the modernisation and expansion of electricity, hydrogen, district heating and CO2 infrastructure, including energy storage;(d) the modernisation and expansion of electricity, grids, district heating and cooling from renewable sources, including energy storage;

Or. en

Amendment 2554

Li Andersson, Jonas Sjöstedt, Per Clausen

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) the modernisation and expansion of electricity, hydrogen, district heating and CO2 infrastructure, including energy storage;(d) the modernisation and expansion of electricity, hydrogen, district heating and cooling infrastructure, including energy storage;

Or. en

Justification

The amendment removes CO₂ infrastructure from the eligible investment categories to ensure that Modernisation Fund resources are focused on infrastructure that directly supports modernisation of energy systems.The amendment adds district cooling to reflect the EU policy direction towards integrated, energy-efficient heating and cooling systems

Amendment 2555

Sirpa Pietikäinen

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) the modernisation and expansion of electricity, hydrogen, district heating and CO2 infrastructure, including energy storage;(d) the modernisation and expansion of electricity, district heating and cooling infrastructure, including energy storage;

Or. en

Amendment 2556

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point e

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(e) industrial decarbonisation, including CCS and CCU and electrification;(e) industrial decarbonisation, including CCS and CCU, and electrification, deploying all technologies capable of contributing to climate mitigation and neutrality goals in a technology-neutral manner

Or. en

Justification

This amendment ensures that Modernisation Fund revenues can support investments in all net-zero technologies contributing to the Union's climate objectives. Including nuclear energy recognises its role as a net-zero source of energy and allows beneficiary Member States to direct investments towards it, in line with their right to determine their energy mix. The reference to technology neutrality in point (e) ensures that investments in industrial decarbonisation can rely on all technologies capable of contributing to climate mitigation and neutrality goals.

Amendment 2557

Mohammed Chahim

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point e

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(e) industrial decarbonisation, including CCS and CCU and electrification;(e) industrial decarbonisation, prioritising direct electrification and limiting CCS and CCU to sectors where no technically and economically viable decarbonisation alternatives are available;

Or. en

Amendment 2558

Li Andersson, Jonas Sjöstedt, Per Clausen

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point e

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(e) industrial decarbonisation, including CCS and CCU and electrification;(e) industrial decarbonisation, prioritising direct electrification and limiting CCS and CCU to sectors where no technically and economically viable decarbonisation alternatives are available;

Or. en

Justification

Prioritising mature, fossil-free solutions delivering direct and reliable emissions reductions and to avoid scarce public resources supporting infrastructure that risks prolonging fossil fuel use or whose long-term climate benefits remain uncertain.

Amendment 2559

Sirpa Pietikäinen

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point e

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(e) industrial decarbonisation, including CCS and CCU and electrification;(e) industrial decarbonisation, prioritising direct electrification and limiting CCS and CCU to sectors where no technically and economically viable decarbonisation alternatives are available;

Or. en

Amendment 2560

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point e

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(e) industrial decarbonisation, including CCS and CCU and electrification;(e) industrial decarbonisation in a way that applies the electrification first principle in line with the methodology referred to in Article 10cc (1a);

Or. en

Amendment 2561

Mohammed Chahim

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2003/87/EC

Article 10d – paragraph 2 – point f

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(f) support for low-income households, including in rural and remote areas, to address energy poverty and to modernise their heating systems;(f) support for low-income households, including in rural and remote areas, to address energy poverty and to modernise their heating and cooling systems;

Or. en

Amendment 2562

Kristian Vigenin

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point b

Directive 2008/98/EC

Article 10d – paragraph 2 – point ha (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
“(ha) investments in waste management infrastructure in accordance with the waste hierarchy, including waste prevention, preparing for reuse, separate collection, sorting, recycling and recovery, as well as, where necessary adequate treatment capacity for non-recyclable residual waste, with a view to reducing landfilling and preventing the diversion of waste towards disposal by landfilling;”

Or. en

Amendment 2563

Adam Jarubas, Andrzej Halicki, Riho Terras, Ewa Kopacz, Elżbieta Katarzyna Łukacijewska, Hanna Gronkiewicz-Waltz, Bartosz Arłukowicz

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point c

Directive 2003/87/EC

Article 10d – paragraph 4

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
4. All beneficiary Member States shall use the amount of allowances distributed for the purposes of solidarity, growth and interconnections within the Union specified in Article 10(2)(b) in accordance with Article 10d, to support investments within the framework of the Modernisation Fund, thereby increasing the resources available to them under the Fund. Any Member State concerned may also use the amount of allowances to be auctioned by that Member State in accordance with Article 10(2)(a), or part of that amount, in accordance with Article 10d, Where a Member State intends to use allowances referred to in Article 10(2)(a) under Article 10d, it shall inform the Commission of the relevant amount at the latest by 30 September of the preceding calendar year.deleted

Or. en

Justification

The proposed changes to the 10% solidarity redistribution mechanism should be deleted. Under the current framework, redistributed allowances increase the national auction volumes of the 16 beneficiary Member States, and the use of the resulting revenues remains subject to the general rules applicable to national auction revenues. The Commission proposal would instead channel the value of those allowances, for Member States that remain eligible for the Modernisation Fund after 2030, through that Fund and subject it to the Fund’s eligibility, governance and disbursement rules. This would replace flexible national auction revenues with resources tied to a dedicated Union instrument, reducing Member States’ capacity to address national transformation, infrastructure and social needs. The proposal would also create unequal treatment between Member States benefiting from the same solidarity mechanism. Spain, Cyprus, Malta and Slovenia would retain additional national auction volumes, while the other beneficiaries would receive the corresponding economic value through the Modernisation Fund and under more restrictive procedural and eligibility rules. Eligibility for the Modernisation Fund should not alter the legal nature or the method of delivery of allowances redistributed under the 10% mechanism. That mechanism should therefore continue to operate uniformly for all beneficiary Member States, with redistributed allowances increasing their respective national auction volumes rather than being transferred to the Modernisation Fund.

Amendment 2564

Ondřej Knotek, Jana Nagyová, Antonín Staněk, Viktória Ferenc

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point c

Directive 2003/87/EC

Article 10d – paragraph 4

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
4. All beneficiary Member States shall use the amount of allowances distributed for the purposes of solidarity, growth and interconnections within the Union specified in Article 10(2)(b) in accordance with Article 10d, to support investments within the framework of the Modernisation Fund, thereby increasing the resources available to them under the Fund. Any Member State concerned may also use the amount of allowances to be auctioned by that Member State in accordance with Article 10(2)(a), or part of that amount, in accordance with Article 10d, Where a Member State intends to use allowances referred to in Article 10(2)(a) under Article 10d, it shall inform the Commission of the relevant amount at the latest by 30 September of the preceding calendar year.4. All beneficiary Member States may use the amount of allowances distributed for the purposes of solidarity, growth and interconnections within the Union specified in Article 10(2)(b) in accordance with Article 10d, to support investments within the framework of the Modernisation Fund, thereby increasing the resources available to them under the Fund. Any Member State concerned may also use the amount of allowances to be auctioned by that Member State in accordance with Article 10(2)(a), or part of that amount, in accordance with Article 10d, Where a Member State intends to use allowances referred to in Article 10(2)(a) under Article 10d, it shall inform the Commission of the relevant amount at the latest by 30 September of the preceding calendar year.

Or. en

Justification

Member States should keep the choice of whether to use the allowances distributed for solidarity, growth and interconnections through the Modernisation Fund or to auction them under Article 10(2).

Amendment 2565

Anna Zalewska, Jacek Ozdoba, Jadwiga Wiśniewska, Daniel Obajtek, Beata Szydło, Rihards Kols, Patryk Jaki, Marion Maréchal

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point d

Directive 2003/87/EC

Article 10d – paragraph 6 – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Where an investment in line with the objectives of the Modernisation Fund, which is proposed to be financed from the Modernisation Fund, does not fall into the areas listed in paragraph 2, the investment committee shall assess the technical and financial viability of that investment, including the emission reductions it achieves, and issue a recommendation on financing the investment from the Modernisation Fund. The investment committee shall ensure that any investment financed from the Modernisation Fund achieves a substantial improvement in emission reductions and, where relevant, in energy efficiency. That recommendation may include suggestions regarding appropriate financing instruments. Up to 50% of the relevant costs of an investment which does not fall into the areas listed in paragraph 2 may be supported with resources from the Modernisation Fund provided that the remaining costs are financed by private legal entities.Where an investment in line with the objectives of the Modernisation Fund, which is proposed to be financed from the Modernisation Fund, does not fall into the areas listed in paragraph 2, the investment committee shall assess the technical and financial viability of that investment, including the emission reductions it achieves, and issue a recommendation on financing the investment from the Modernisation Fund. The investment committee shall ensure that any investment financed from the Modernisation Fund achieves a substantial improvement in emission reductions and, where relevant, in energy efficiency. That recommendation may include suggestions regarding appropriate financing instruments. Up to 70% of the relevant costs of an investment which does not fall into the areas listed in paragraph 2 may be supported with resources from the Modernisation Fund provided that the remaining costs are financed by private legal entities.

Or. en

Amendment 2566

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu, Adrian-George Axinia

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point d

Directive 2003/87/EC

Article 10d – paragraph 6 – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Where an investment in line with the objectives of the Modernisation Fund, which is proposed to be financed from the Modernisation Fund, does not fall into the areas listed in paragraph 2, the investment committee shall assess the technical and financial viability of that investment, including the emission reductions it achieves, and issue a recommendation on financing the investment from the Modernisation Fund. The investment committee shall ensure that any investment financed from the Modernisation Fund achieves a substantial improvement in emission reductions and, where relevant, in energy efficiency. That recommendation may include suggestions regarding appropriate financing instruments. Up to 50% of the relevant costs of an investment which does not fall into the areas listed in paragraph 2 may be supported with resources from the Modernisation Fund provided that the remaining costs are financed by private legal entities.Where an investment in line with the objectives of the Modernisation Fund, which is proposed to be financed from the Modernisation Fund, does not fall into the areas listed in paragraph 2, the investment committee shall assess the technical and financial viability of that investment, including the emission reductions it achieves, and issue a recommendation on financing the investment from the Modernisation Fund. The investment committee shall ensure that any investment financed from the Modernisation Fund achieves a substantial improvement in emission reductions and, where relevant, in energy efficiency. That recommendation may include suggestions regarding appropriate financing instruments. Up to 70% of the relevant costs of an investment which does not fall into the areas listed in paragraph 2 may be supported with resources from the Modernisation Fund provided that the remaining costs are financed by private legal entities.

Or. en

Amendment 2567

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point f

Directive 2003/87/EC

Article 10d – paragraph 11

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(f) in paragraph 11, ‘2024’ is replaced by ‘2036’.(f) paragraph 11 is replaced by the following:
' The investment committee shall report annually to the Commission on experience with the evaluation of investments, in particular in terms of emission reductions and abatement costs. By 31 December 2033, taking into consideration the findings of the investment committee, the Commission shall review the areas for projects referred to in paragraph 2 and the basis on which the investment committee makes its recommendations. The conclusions of that review shall be included in the annual report to the European Parliament and to the Council and may be accompanied by a legislative proposal to amend this Directive.

Or. en

Amendment 2568

Li Andersson, Jonas Sjöstedt, Per Clausen

Proposal for a directive

Article 1 – paragraph 1 – point 18 – point fa (new)

Directive 2003/87/EC

Article 10d – paragraph 12

Amendment: Present text and Amendment
Present textAmendment
(fa) In Article 10d, paragraph 12 is replaced by the following:
12. The Commission shall adopt implementing acts concerning detailed rules on the operation of the Modernisation Fund. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 22a(2)."12. The Commission shall adopt implementing acts concerning detailed rules on the operation of the Modernisation Fund, including rules ensuring transparency, stakeholder consultation and effectrive stakeholder participation in the selection, implementation and monitoring of investments financed by the Fund. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 22a(2).
"

Or. en

(https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A02003L0087-20240301)

Justification

Strengthens the transparency and accountability of the Modernisation Fund by ensuring that its implementing rules establish clear requirements for stakeholder consultations throughout the investment cycle.

Amendment 2569

Adam Jarubas, Andrzej Halicki, Riho Terras, Ewa Kopacz, Elżbieta Katarzyna Łukacijewska, Hanna Gronkiewicz-Waltz, Bartosz Arłukowicz

Proposal for a directive

Article 1 – paragraph 1 – point 19

Directive 2003/87/EC

Article 10da

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(19) The following Article is inserted:deleted
‘
Article 10da
Rule of Law
1. Beneficiary Member States shall ensure the respect of the principles of the rule of law as set out in Article 2, point (a), and Article 3 of Regulation (EU, Euratom) 2020/2092 throughout the implementation of the Modernisation Fund.
2. Appropriate measures as set out in paragraph 3 may be taken where it is established that the breaches of the principles of the rule of law referred to in Article 4(2) of Regulation 2020/2092 in a beneficiary Member State affect or seriously risk affecting the sound financial management of the Modernisation Fund in a sufficiently direct way.
3.
Provided that the condition set out in paragraph 2 is fulfilled, one or more of the following appropriate measures may be adopted, following the procedure in Article 10db.
(a) a suspension of the adoption of the disbursement decision referred to in Article 10d (3);
(b) a suspension of disbursements under disbursement decisions already adopted;
The measures adopted shall respect the conditions provided for in Article 5(2) to (5) of Regulation 2020/2092 as appropriate.
4. The measures shall be adopted in accordance with the procedure laid down in Article 6 of Regulation 2020/2092. When triggering the procedure, the Commission shall verify that no other means exist to protect the revenues managed under the Modernisation Fund more effectively.
5. The measures shall be lifted in accordance with the procedure laid down in Article 7 of Regulation 2020/2092.
’

Or. en

Justification

A mechanism suspending Modernisation Fund where breaches of rule-of-law principles affect or seriously risk affecting the sound financial management of the Fund should be deleted, as it could transfer the consequences of an assessment concerning a Member State to undertakings, municipalities, public entities and households implementing transformation projects in good faith and with no influence over the circumstances giving rise to the suspension.Suspending payments for projects already approved could create financing gaps, delay procurement and construction, increase financing costs and undermine legal commitments based on adopted disbursement decisions. The Fund already operates under dedicated eligibility, EIB assessment, due-diligence, Commission decision-making, control, audit and recovery procedures. Protection of the Union’s financial interests should therefore rely on the generally applicable Union framework and the Fund’s existing safeguards, rather than on an additional sector-specific conditionality that may disproportionately affect final beneficiaries.

Amendment 2570

Anna Zalewska, Jacek Ozdoba, Jadwiga Wiśniewska, Daniel Obajtek, Beata Szydło, Patryk Jaki, Marion Maréchal

Proposal for a directive

Article 1 – paragraph 1 – point 19

Directive 2003/87/EC

Article 10da

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(19) The following Article is inserted:deleted
‘
Article 10da
Rule of Law
1. Beneficiary Member States shall ensure the respect of the principles of the rule of law as set out in Article 2, point (a), and Article 3 of Regulation (EU, Euratom) 2020/2092 throughout the implementation of the Modernisation Fund.
2. Appropriate measures as set out in paragraph 3 may be taken where it is established that the breaches of the principles of the rule of law referred to in Article 4(2) of Regulation 2020/2092 in a beneficiary Member State affect or seriously risk affecting the sound financial management of the Modernisation Fund in a sufficiently direct way.
3.
Provided that the condition set out in paragraph 2 is fulfilled, one or more of the following appropriate measures may be adopted, following the procedure in Article 10db.
(a) a suspension of the adoption of the disbursement decision referred to in Article 10d (3);
(b) a suspension of disbursements under disbursement decisions already adopted;
The measures adopted shall respect the conditions provided for in Article 5(2) to (5) of Regulation 2020/2092 as appropriate.
4. The measures shall be adopted in accordance with the procedure laid down in Article 6 of Regulation 2020/2092. When triggering the procedure, the Commission shall verify that no other means exist to protect the revenues managed under the Modernisation Fund more effectively.
5. The measures shall be lifted in accordance with the procedure laid down in Article 7 of Regulation 2020/2092.
’

Or. en

Justification

Article 10da should be deleted. The Modernisation Fund should be governed by objective criteria directly linked to energy-system modernisation and sound financial management, not by additional political conditionality. Rule-of-law mechanisms have in the past been used instrumentally by the Commission to exert political pressure on governments critical of its policies. Extending such conditionality to the Modernisation Fund risks politicising access to ETS revenues and creating legal and investment uncertainty for installations covered by ETS.

Amendment 2571

Jorge Buxadé Villalba, Roman Haider, Silvia Sardone, Marie-Luce Brasier-Clain, Mathilde Androuët, Anne-Sophie Frigout

Proposal for a directive

Article 1 – paragraph 1 – point 19

Directive 2003/87/EC

Article 10da

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(19) The following Article is inserted:deleted
‘
Article 10da
Rule of Law
1. Beneficiary Member States shall ensure the respect of the principles of the rule of law as set out in Article 2, point (a), and Article 3 of Regulation (EU, Euratom) 2020/2092 throughout the implementation of the Modernisation Fund.
2. Appropriate measures as set out in paragraph 3 may be taken where it is established that the breaches of the principles of the rule of law referred to in Article 4(2) of Regulation 2020/2092 in a beneficiary Member State affect or seriously risk affecting the sound financial management of the Modernisation Fund in a sufficiently direct way.
3.
Provided that the condition set out in paragraph 2 is fulfilled, one or more of the following appropriate measures may be adopted, following the procedure in Article 10db.
(a) a suspension of the adoption of the disbursement decision referred to in Article 10d (3);
(b) a suspension of disbursements under disbursement decisions already adopted;
The measures adopted shall respect the conditions provided for in Article 5(2) to (5) of Regulation 2020/2092 as appropriate.
4. The measures shall be adopted in accordance with the procedure laid down in Article 6 of Regulation 2020/2092. When triggering the procedure, the Commission shall verify that no other means exist to protect the revenues managed under the Modernisation Fund more effectively.
5. The measures shall be lifted in accordance with the procedure laid down in Article 7 of Regulation 2020/2092.
’

Or. en

Amendment 2572

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu, Adrian-George Axinia

Proposal for a directive

Article 1 – paragraph 1 – point 19

Directive 2003/87/EC

Article 10da

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(19) The following Article is inserted:deleted
‘
Article 10da
Rule of Law
1. Beneficiary Member States shall ensure the respect of the principles of the rule of law as set out in Article 2, point (a), and Article 3 of Regulation (EU, Euratom) 2020/2092 throughout the implementation of the Modernisation Fund.
2. Appropriate measures as set out in paragraph 3 may be taken where it is established that the breaches of the principles of the rule of law referred to in Article 4(2) of Regulation 2020/2092 in a beneficiary Member State affect or seriously risk affecting the sound financial management of the Modernisation Fund in a sufficiently direct way.
3.
Provided that the condition set out in paragraph 2 is fulfilled, one or more of the following appropriate measures may be adopted, following the procedure in Article 10db.
(a) a suspension of the adoption of the disbursement decision referred to in Article 10d (3);
(b) a suspension of disbursements under disbursement decisions already adopted;
The measures adopted shall respect the conditions provided for in Article 5(2) to (5) of Regulation 2020/2092 as appropriate.
4. The measures shall be adopted in accordance with the procedure laid down in Article 6 of Regulation 2020/2092. When triggering the procedure, the Commission shall verify that no other means exist to protect the revenues managed under the Modernisation Fund more effectively.
5. The measures shall be lifted in accordance with the procedure laid down in Article 7 of Regulation 2020/2092.
’

Or. en

Amendment 2573

Sophie Wilmès, Olivier Chastel, Benoit Cassart, Katri Kulmuni

Proposal for a directive

Article 1 – paragraph 1 – point 19

Directive 2003/87/EC

Article 10da – paragraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
2. Appropriate measures as set out in paragraph 3 may be taken where it is established that the breaches of the principles of the rule of law referred to in Article 4(2) of Regulation 2020/2092 in a beneficiary Member State affect or seriously risk affecting the sound financial management of the Modernisation Fund in a sufficiently direct way.2. Appropriate measures as set out in paragraph 3 may be taken where it is established that the breaches of the principles of the rule of law referred to in Article 4(2) of Regulation 2020/2092 in a beneficiary Member State affect or seriously risk affecting the sound financial management of the Modernisation Fund in a sufficiently direct way. In assessing whether the conditions set out in the first subparagraph are fulfilled, particular consideration shall be given to breaches of the principles of the rule of law affecting or seriously risking to affect the selection, implementation or control of one or more investments supported by the Modernisation Fund, or the effective judicial review of decisions or measures relating to such investments

Or. en

Amendment 2574

Sophie Wilmès, Olivier Chastel, Benoit Cassart, Katri Kulmuni

Proposal for a directive

Article 1 – paragraph 1 – point 19

Directive 2003/87/EC

Article 10da – paragraph 3 – point ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) a suspension of support for one or more investments in relation to which the breaches referred to in paragraph 2 have been established

Or. en

Amendment 2575

Emma Ytterell, Yvan Verougstraete, Gerben-Jan Gerbrandy, Anna Stürgkh, Jeannette Baljeu

Proposal for a directive

Article 1 – paragraph 1 – point 19

Directive 2003/87/EC

Article 10da – paragraph 3 – point ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) a reimbursement of the support already disbursed under disbursement decisions already adopted;

Or. en

Justification

In case of serious breaches of the Rule of Law, there should be a clawback mechanism for disbursements already made.

Amendment 2576

Sophie Wilmès, Olivier Chastel, Benoit Cassart, Katri Kulmuni

Proposal for a directive

Article 1 – paragraph 1 – point 19

Directive 2003/87/EC

Article 10da – paragraph 3 – point bb (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(bb) the imposition of specific and proportionate remedial measures directly related to the breaches concerned and necessary to address their impact on the Modernisation Fund to be fulfilled before the adoption of a disbursement decision or the resumption of disbursements.

Or. en

Amendment 2577

Sophie Wilmès, Olivier Chastel, Benoit Cassart

Proposal for a directive

Article 1 – paragraph 1 – point 19

Directive 2003/87/EC

Article 10da – paragraph 4

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
4. The measures shall be adopted in accordance with the procedure laid down in Article 6 of Regulation 2020/2092. When triggering the procedure, the Commission shall verify that no other means exist to protect the revenues managed under the Modernisation Fund more effectively.4. The measures shall be adopted in accordance with the procedure laid down in Article 6 of Regulation 2020/2092. When triggering the procedure, the Commission shall verify that no other means exist to protect the revenues managed under the Modernisation Fund more effectively. Where possible, measures shall be targeted at the investments affected by the breaches concerned.

Or. en

Amendment 2578

Ondřej Knotek, Jana Nagyová, Antonín Staněk, Roman Haider, Viktória Ferenc

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(20) Article 10f is replaced by the following:deleted
‘
Article 10f
‘Do no significant harm’ principle
Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509.
’

Or. en

Amendment 2579

Anna Zalewska, Jacek Ozdoba, Jadwiga Wiśniewska, Daniel Obajtek, Beata Szydło, Rihards Kols, Patryk Jaki, Marion Maréchal

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(20) Article 10f is replaced by the following:deleted
‘
Article 10f
‘Do no significant harm’ principle
Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509.
’

Or. en

Justification

Applying DNSH criteria risks excluding investments that deliver substantial emission reductions compared with the existing situation, but which do not meet all technical screening criteria from the outset. This may be particularly problematic for investments necessary for security of supply, system adequacy, industrial decarbonisation and the replacement of more carbon-intensive technologies. The result could be to restrict the technological choices available to beneficiary Member States precisely where flexibility is needed to achieve cost-effective and socially sustainable modernisation.

Amendment 2580

Jorge Buxadé Villalba, Roman Haider, Antonín Staněk, Silvia Sardone, Marie-Luce Brasier-Clain, Mathilde Androuët, Anne-Sophie Frigout

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(20) Article 10f is replaced by the following:deleted
‘
Article 10f
‘Do no significant harm’ principle
Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509.
’

Or. en

Amendment 2581

Jens Gieseke, Ralf Seekatz, Sophia Kircher, Norbert Herhammer, Gheorghe Falcă, Andrea Wechsler, Isabelle Le Callennec

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(20) Article 10f is replaced by the following:deleted
‘
Article 10f
‘Do no significant harm’ principle
Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509.
’

Or. en

Amendment 2582

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu, Adrian-George Axinia

Proposal for a directive

Article 1 – paragraph 1 – point 20 – introductory part

Directive 2003/87/EC

Article 10f

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(20) Article 10f is replaced by the following:(20) Article 10f "‘Do no significant harm’ principle" is deleted

Or. en

Amendment 2583

Adam Jarubas, Andrzej Halicki, Riho Terras, Ewa Kopacz, Elżbieta Katarzyna Łukacijewska, Hanna Gronkiewicz-Waltz, Bartosz Arłukowicz

Proposal for a directive

Article 1 – paragraph 1 – point 20 – introductory part

Directive 2003/87/EC

Article 10f

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(20) Article 10f is replaced by the following:(20) Article 10f shall be deleted.

Or. en

Justification

A separate broadly formulated DNSH requirement could create additional uncertainty for projects already subject to applicable environmental law and sector-specific eligibility criteria.

Amendment 2584

Marie-Luce Brasier-Clain, Anne-Sophie Frigout, Mathilde Androuët, Valérie Deloge, Antonín Staněk, Barbara Bonte, Ondřej Knotek, Jana Nagyová

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f - title

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
‘Do no significant harm’ principledeleted

Or. fr

Amendment 2585

Marie-Luce Brasier-Clain, Anne-Sophie Frigout, Mathilde Androuët, Valérie Deloge, Barbara Bonte, Ondřej Knotek, Jana Nagyová

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509.deleted

Or. fr

Amendment 2586

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Christian Ehler, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509.deleted

Or. en

Justification

The provision is deleted because the application of the ‘do no significant harm’ principle to the Modernisation Fund, the Innovation Fund and the Industrial Decarbonisation Bank is addressed more specifically in Article 10f. A general cross-reference risks creating additional and duplicative compliance obligations without adding substantive environmental protection.The deletion therefore improves legal clarity and avoids parallel assessment, monitoring and documentation requirements, while preserving the application of the DNSH principle through the dedicated and proportionate framework established in Article 10f.

Amendment 2587

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509.Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Electrification and Decarbonisation Bank pursuant to Article 10cc of this Directive and revenues referred to in Article 10(3) shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509.
By [one year after entry into force of this Directive], the Commission shall adopt a guidance setting out general principles and criteria to ensure compliance with the first paragraph.

Or. en

Amendment 2588

Li Andersson, Jonas Sjöstedt, Per Clausen

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509.Revenues generated from the auctioning of allowances referred to in Article 10(3), and revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive, shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d), of Regulation (EU, Euratom) 2024/2509.

Or. en

Amendment 2589

Thomas Pellerin-Carlin, Christophe Clergeau

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509.Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509, and Article 5 of the Regulation (EU) [.../...][Performance Regulation].

Or. en

Amendment 2590

Sigrid Friis, Gerben-Jan Gerbrandy, Stine Bosse

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation of Regulation (EU, Euratom) 2024/2509.Revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive shall be used in line with the principle of ‘do no significant harm’ referred to in Article 5 of Regulation 2025/0545.

Or. en

Justification

The reference to the Performance Regulation ensures that the ‘do no significant harm’ principle is applied consistently across Union funding.

Amendment 2591

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Christian Ehler, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f – paragraph 1a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
‘1a. The application of the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation (EU, Euratom) 2024/2509 to revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive, shall be set out in this Article to ensure it is feasible and appropriate for the objectives and activities of these programmes. The principle shall be applied to the programmes as set out in this Article. No monitoring, verification or reporting obligation specific to the principles beyond that set out in this Article shall apply.
1b. Projects or investment proposals not subject to an environmental impact assessment pursuant to Directives 2011/92/EU or 92/43/EEC shall be presumed compliant with the principle referred to in Article 33(2), point (d) of Regulation [2024/2509]. No documentation or other evidence of compliance shall be required from applicants for such projects.
1c. Where a project or investment proposal is subject to an environmental impact assessment pursuant to Directive 2011/92/EU or to an appropriate assessment pursuant to Article 6(3) of Directive 92/43/EEC, the following shall apply: where the relevant permit, consent or decision has been completed or granted at the time of submission of the project or investment proposal, the entity submitting the proposal may demonstrate compliance with the principle referred to in paragraph 1 by providing the relevant permit, consent or decision and shall not be required to provide additional documentation relating to the environmental aspects covered by that assessment; where the relevant assessment procedure has been initiated but has not yet been completed at the time of submission of the project or investment proposal, the entity submitting the proposal shall provide evidence of the initiation of that procedure and any relevant documentation available to it. The project or investment shall be presumed to comply with the principle referred to in paragraph 1 in respect of the environmental aspects covered by that procedure for the duration of the assessment procedure, unless the competent granting authority determines, on the basis of the information available to it in the ordinary exercise of its functions, that there are manifest grounds to consider that the project would cause significant harm to one or more of the environmental objectives referred to in Article 33(2), point (d), of Regulation (EU, Euratom) 2024/2509. Once the relevant permit, consent or decision has been completed or granted, the entity submitting the proposal shall provide it to the granting authority, where required under the applicable rules governing the relevant funding instrument; where that procedure has not yet been initiated at the time of submission of the project or investment proposal, the entity submitting the proposal shall instead submit a declaration undertaking to initiate the procedure with the competent national authority no later than the signature of the grant or financing agreement, and shall provide evidence of such initiation at that stage. That declaration shall satisfy the requirements of this point at the application stage.’

Or. en

Justification

The amendment clarifies and simplifies the application of the ‘do no significant harm’ principle to projects supported by the Modernisation Fund, the Innovation Fund and the Industrial Decarbonisation Bank. It avoids creating an additional layer of monitoring, verification and reporting requirements where environmental compliance is already assessed under existing Union legislation.Where no environmental impact assessment is required, projects should be presumed compliant with the DNSH principle. Where an environmental or appropriate assessment is required, existing permits, decisions or ongoing procedures should be sufficient to demonstrate compliance for the environmental aspects already covered. This reduces duplicative administrative requirements, shortens application procedures and improves legal certainty for project developers, while maintaining the substantive environmental safeguards established under Union law.

Amendment 2592

Michalis Hadjipantela

Proposal for a directive

Article 1 – paragraph 1 – point 20

Directive 2003/87/EC

Article 10f – paragraph 1a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
1a. The application of the principle of ‘do no significant harm’ referred to in Article 33(2), point (d) of Regulation (EU, Euratom) 2024/2509 to revenues generated from the auctioning of allowances destined for the Modernisation Fund pursuant to Article 10d, for the Innovation Fund pursuant to Article 10cb and for the Industrial Decarbonisation Bank pursuant to Article 10cc of this Directive, shall be set out in this Article to ensure it is feasible and appropriate for the objectives and activities of these funds. The principle shall be applied to the programmes as set out in this Article. No monitoring, verification or reporting obligation specific to the principles beyond that set out in this Article shall apply.
1b. Projects or investment proposals not subject to an environmental impact assessment pursuant to Directives 2011/92/EU or 92/43/EEC shall be presumed compliant with the principle referred to in Article 33(2), point (d) of Regulation [2024/2509]. No documentation or other evidence of compliance shall be required from applicants for such projects.
1c. Where a project or investment proposal is subject to an environmental impact assessment pursuant to Directive 2011/92/EU or to an appropriate assessment pursuant to Article 6(3) of Directive 92/43/EEC, the following shall apply:
(a) where the relevant permit, consent or decision has been completed or granted at the time of submission of the project or investment proposal, the entity submitting the proposal may demonstrate compliance with the principle referred to in paragraph 1 by providing the relevant permit, consent or decision and shall not be required to provide additional documentation relating to the environmental aspects covered by that assessment;
(b) where the relevant assessment procedure has been initiated but has not yet been completed at the time of submission of the project or investment proposal, the entity submitting the proposal shall provide evidence of the initiation of that procedure and any relevant documentation available to it. The project or investment shall be presumed to comply with the principle referred to in paragraph 1 in respect of the environmental aspects covered by that procedure for the duration of the assessment procedure, unless the competent granting authority determines, on the basis of the information available to it in the ordinary exercise of its functions, that there are manifest grounds to consider that the project would cause significant harm to one or more of the environmental objectives referred to in Article 33(2), point(d), of Regulation (EU, Euratom). Once the relevant permit, consent or decision has been completed or granted, the entity submitting the proposal shall provide it to the granting authority, where required under the applicable rules governing the relevant funding instrument;
(c) where that procedure has not yet been initiated at the time of submission of the project or investment proposal, the entity submitting the proposal shall instead submit a declaration undertaking to initiate the procedure with the competent national authority no later than the signature of the grant or financing agreement, and shall provide evidence of such initiation at that stage. That declaration shall satisfy the requirements of this point at the application stage.
1d. Without prejudice to paragraphs 2 and 3, where the environmental aspects relevant for the application of the principle referred to in paragraph 1 have already been assessed, regulated, monitored, reported or verified pursuant to applicable Union environmental or climate legislation, or national legislation implementing such Union legislation, the granting authority shall rely on the relevant assessment, permit, authorisation, consent, decision, monitoring data or verification and shall not require the applicant to repeat an equivalent assessment or submit equivalent documentation. In particular:
a. where an economic activity has already been demonstrated to qualify as environmentally sustainable in accordance with Article 3 of Regulation (EU) 2020/852 and the applicable technical screening criteria adopted pursuant to that Regulation, it shall be deemed to comply with the principle referred to in paragraph 1 and no additional assessment or documentation demonstrating compliance with that principle shall be required;
b. where an installation holds a valid permit pursuant to Directive 2010/75/EU and the applicable permit conditions have been established in accordance with Articles 14 and 15 of that Directive, taking into account the applicable conclusions on best available techniques adopted pursuant to Article 13(5), the project or investment proposal shall be presumed to comply with the principle referred to in paragraph 1 in respect of the environmental aspects covered by that permit. The applicant shall not be required to submit additional documentation in respect of those environmental aspects;
c. where an installation holds a valid greenhouse gas emissions permit pursuant to Articles 4 to 6 of Directive 2003/87/EC, and greenhouse gas emissions relevant to the project or investment have been monitored, reported and verified in accordance with Articles 14 and 15 of that Directive and the acts adopted pursuant thereto, the relevant permit, monitoring information and verified emissions data shall constitute sufficient evidence for the corresponding elements of the assessment under the climate-change-mitigation objective and shall not be requested or assessed a second time. Where support under Articles 10cb, 10cc, 10cd, 10ce or 10d is conditional upon quantified and verified greenhouse gas emission reductions, avoided emissions or removals, the project or investment shall be presumed to comply with the principle referred to in paragraph 1 in respect of the climate-change-mitigation objective to the extent covered by that assessment;
d. where a project, investment, installation or activity holds a valid permit, authorisation, consent or equivalent decision issued pursuant to other applicable Union environmental legislation or national legislation implementing it, that permit, authorisation, consent or decision shall constitute sufficient evidence of compliance with the principle referred to in paragraph 1 in respect of the environmental aspects which the competent authority was required to assess and address when granting that permit, authorisation, consent or decision. No additional documentation relating to those environmental aspects shall be required.
1e. Projects carried out by micro-undertakings, small undertakings and medium sized undertakings, as defined in Article 3 of Directive 2013/34/EU, shall not be subject to additional assessment, documentation, monitoring or reporting requirements specifically relating to compliance with the principle referred to in paragraph 1, beyond those arising from applicable Union and national environmental legislation.

Or. en

Amendment 2593

Jeannette Baljeu

Proposal for a directive

Article 1 – paragraph 1 – point 20 a (new)

Directive 2003/87/EC

Article 10fa (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(20a) Article 10fa is inserted:
Economic security of ETS-funded support and expenditure
Support financed under this Directive shall not be granted to beneficiaries that:
(a) are owned or controlled by a natural or legal person from a third country identified pursuant to Regulation (EU) …/… [Industrial Accelerator Act] as holding more than 40% of global manufacturing capacity in a strategic sector;
(b) source more than 50% of a net-zero technology or its main specific components from a single third country on which the Union depends for more than 50% of its supply, as identified pursuant to Regulation (EU) 2024/1735;
(c) are high-risk suppliers as defined in Article 2 point (39) of Regulation xxxx/xxxx [CSA2]: For auctions that include control systems, management control systems, supervisory control and data acquisition systems, remote access systems or firewalls, suppliers identified as high risk suppliers in accordance with Regulation xxxx/xxxx [CSA2]shall not be involved in the following processes:
(1) the supply of those products or systems;
(2) the design, development or production of those products or systems;
(3) the management, control or operation of those products or systems;
(4) the development, maintenance, operation, or updating of their software.
This Article shall apply to support financed through allowances reserved under this Directive or the revenues generated from their monetisation, including support under Articles 10cb, 10cc, 10cd, 10ce and 10d; public support and expenditure financed, wholly or in part, from auction revenues generated under this Directive, including expenditure at national, regional and local level; measures counted towards the equivalent financial value of auction revenues for the purposes of Article 3d(4), Article 10(3) or Article 30d(6); and financial measures compensating for indirect carbon costs pursuant to Article 10a(6).

Or. en

Justification

ETS-linked funding should follow the same supply chain security requirements from the IAA, NZIA and CSA2 to ensure that no high-risk suppliers would receive financing. This ensures that the European carbon-market funds are in line with other EU legislation.

Amendment 2594

Mohammed Chahim

Proposal for a directive

Article 1 – paragraph 1 – point 20 a (new)

Directive 2003/87/EC

Chapter IIIa (new) – Article x1 to Article x12

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(21a) Chapter IIIa - carbon leakage on international markets
Article 1 - Subject matter
1. A Fund (the ‘Decarbonisation Fund’) is hereby established. This chapter lays down its governance, the financial rules for its implementation, its resources, and the scope of its support. The Fund shall provide financial support in the period 2031-2040 to address the remaining risk of carbon leakage associated with carbon intensive goods produced by eligible operators of installations in the period 2031-2040
Article 2 - Resources of the Fund
1. The Fund shall be financed by contributions from Member States.
2. Those contributions shall correspond to 25% of the revenues that each Member State has collected from the sale of CBAM certificates pursuant to Article 20 of Regulation (EU) 2023/956 in relation to embedded emissions declared for the relevant year.
3. Each Member State shall communicate to the Commission the exact annual amounts to contribute to the Fund for each year over the period. Member States shall transfer to the Fund a monetary amount that corresponds to the amount referred to in paragraph 2 of this Article respectively by 31 March each year. The amounts contributed shall be assigned revenue to the Fund in accordance with Article 21(5) of Regulation (EU, Euratom) 2024/2509. By way of derogation from that provision, the amounts contributed shall constitute external assigned revenue.
4. Revenues remaining after the full disbursement of funding to final beneficiaries and payment of administrative costs of the Fund shall not be automatically carried over to be used by the Fund. By way of derogation from Article 12(4), point (c), of Regulation (EU, Euratom) 2024/2509, the Commission may use those revenues for the purpose of the Union’s international climate finance commitments, in particular under Article 9 of the Paris Agreement.
5. The administrative costs incurred by the Commission for the implementation of the Fund shall be covered by the resources mentioned in paragraph 1.
6. The Commission is empowered to adopt delegated acts in accordance with Article 14 to supplement this Regulation by laying down the provisions and arrangements necessary for the calculation and collection of each Member State’s contribution to the resources assigned to the Fund in accordance with this Article, including any relevant reporting requirements.
Article 3 - Implementation of the Fund
1. The Fund shall be implemented by the Commission under direct management within the meaning of Article 62(1), first subparagraph, point (a), of Regulation (EU, Euratom) 2024/2509, and in accordance with the other relevant rules adopted pursuant to Article 322 TFEU, including Regulation (EU, Euratom) 2020/2092.
2. The Commission is empowered to adopt delegated acts in accordance with Article 14 to supplement this Regulation by laying down the provisions and arrangements concerning the implementation of the Fund, including the reporting and monitoring requirements.
3. From … [the date of entry into force of this Regulation], the Commission shall document, on an annual basis, detailed information about the collection and use of the assigned revenue referred to in Article 3(1) in the relevant working documents accompanying the draft budget of the Fund, as well as a detailed breakdown of funds disbursed under the Fund and applications per Member State, sector, goods and installations.
4. By 31 March 2033, the Commission shall carry out a comprehensive assessment and submit to the European Parliament and to the Council an interim report on the performance and effectiveness of the Fund in:
(a) preventing carbon leakage, including by assessing whether the current scope of eligible goods and sectors adequately reflects the sectors exposed to a risk of relocation of production outside the Union;
(b) supporting the level playing field of Union producers in third markets, and all goods covered by Directive 2003/87/EC and Regulation (EU) 2023/956;
(c) achieving verifiable emission reductions.
The interim report referred to in the first subparagraph shall evaluate in particular:
(a) the adequacy of the scope of this Regulation in terms of eligible goods or sectors on the basis of an updated assessment of the remaining risk of carbon leakage from those goods or sectors;
(b) the adequacy of the financial resources allocated to the Fund in light of its objectives and whether the available appropriations are commensurate with the demand for support by the sectors and installations concerned, on the basis of the applications received;
(c) consistency of the Fund with Union climate objectives, State aid rules, and the Union’s international obligations;
(d) the appropriateness of introducing a targeted transaction fee on the secondary EU ETS market, its effect on price stability and expected revenues for the Fund;
(e) an assessment of the effectiveness and added value of using the remaining funds of the Fund to contribute to the Union’s international climate obligations under Article 9 of the Paris Agreement.
Article 4 - Competent authorities
Each Member State shall designate the competent authority to carry out the functions and duties under this Chapter and inform the Commission thereof.
The Commission shall make a list of all competent authorities available to the public.
Article 5 - Eligibility
1. The operator of an installation producing goods as listed in Annex I of Regulation (EU) 2023/956, which goods fall under the Combined Nomenclature (‘CN’) codes in Regulation (EEC) No 2658/87, shall be eligible to receive financial support in accordance with Article 8 and subject to the conditions set out in Article 6.
2. The operator of an installation producing goods not listed in the Annex or downstream operator producing such goods, which have a low ratio of value to weight and are subject to a heightened remaining risk of carbon leakage at national level as defined in the delegated act adopted in accordance with paragraph 5, shall, upon decision of the Commission following a reasoned request of a Member State, be eligible to receive financial support in accordance with Article 8 and be subject to the conditions set out in Article 6.
(a) a substantial proportion of the operator’s output of those goods is exported to third-country markets or supplied to exporters of such goods.
3. An operator operator that produces eligible goods listed in the Annex X(new), shall not be eligible to receive financial support pursuant to Article 8 when:
(a) the operator or downstream operator concerned, following verification by the relevant national competent authority, or respectively, the Commission, is in breach of relevant working and employment conditions and employer obligations resulting from Union or national labour laws, or applicable collective agreements according to national rules and practices; or
(b) the operator and downstream operator concerned, or the parent company, are established in jurisdictions listed in the Union list of non-cooperative jurisdictions for tax purposes.
4. The Commission is empowered to adopt delegated acts by establishing the indicators determining the heightened remaining risk of carbon leakage provided for in paragraph 2 and a list of goods determined on the basis of that indicator, including the conditions that the producers of such goods need to fulfil to receive financial support, in addition to the ones set out in Article 6.
Article 6 - Conditionality
1. Where an operator is subject to the obligation to conduct an energy audit as a stand-alone energy audit or within the framework of a certified Energy Management System or Environmental Management System, the operator shall receive financial support from the Fund provided that the operator demonstrates to the satisfaction of the Commission that one of the following conditions is fulfilled:
(a) all recommendations under Article 11 of Directive 2023/1791/EC of the European Parliament and of the Council have been implemented;
(b) the pay-back time for any remaining relevant investments exceeds five years;
(c) the cost of implementing the recommendations referred to in (a) is disproportionate and the operator demonstrates a legal commitment within the meaning of Article 3d of Implementing Regulation (EU) 2019/1842 for investments implementing other measures which will lead to verifiable greenhouse gas emission reductions equivalent to those recommended by the audit report or by the certified Energy Management System for the installation concerned.
2. The conditions set out in paragraph 1, points (a), (b) and (c), shall apply also to operators that are not subject to the obligation to conduct an energy audit provided that their energy audit is compliant with the minimum criteria set out in Annex VI to Directive (EU) 2023/1791.
3. Alternatively to paragraphs 1, and 2, an operator shall receive financial support from the Fund provided that the operator demonstrates to the satisfaction of the Commission, that it has made a legal commitment within the meaning of Article 3d of Implementing Regulation (EU) 2019/1842 made for investments to achieve the targets and milestones referred to in a climate neutrality plan and which is at least equivalent to the support amount applied for under this Chapter.
4. Operators shall receive financial support from the Fund provided that they demonstrate to the satisfaction of the Commission that:
(a) they have a legal commitment to use or source, where available, half of their equipment, supplies and materials, or their components, from the Union’s territory, for investments supported by the Fund;
(b) they do not to use the financial support of the Fund for dividend payouts, in excess of expected returns, share buybacks or executive bonuses over the period.
5. The Commission shall, by means of implementing acts, determine standardised indicators and templates for operators to demonstrate compliance with the conditionality requirements set out in Article 6, including, inter alia, indicators relevant for downstream operators at the level of input reduction and use of lower carbon footprint material. This shall include simplified indicators and templates proportionate to small- and medium sized enterprises and shall take into account the specific case of Ireland and Northern Ireland.
Article 7 - Application for support, processing of applications and competent authority assessments
1. The operator of an installation producing goods that are eligible for financial support may submit an application for such support from the Fund by 31 March each year. That application shall be submitted to the competent authority of the Member State where the operator of the installation is established.
2. An application submitted pursuant to paragraph 1 shall be accompanied by the following specific elements:
(a) for all operators, a production and export data report complementing the verified activity level reports for the relevant production reference period covered by the application submitted pursuant to paragraph 1 of this Article submitted pursuant to Article 3 of Implementing Regulation (EU) 2019/1842, providing the necessary production data and data on the share of production sold in third countries, broken down by country of export, to verify the eligibility for financial support;
(b) for all operators, if applicable, a tax transparency report and an ownership structure disclosure providing evidence that the operator and its parent company are not established in jurisdictions listed in the Union list of non-cooperative jurisdictions for tax purposes;
(c) for all operators, documentation providing evidence that investments in Article 6(1), (2) and (3) are in accordance with Section 5 of the Clean Industrial Deal State Aid Framework (CISAF);
(d) for operators seeking to meet the conditionality requirements set out in Article 6(1) or (2):
(i) a verification report confirming during the verification of the annual activity level reports for the relevant years of production in accordance with Article 3 of Implementing Regulation (EU) 2019/1842 that the conditions set out in Article 6(1) or (2) have been met;
(ii) if applicable, documentary evidence of the legal commitment within the meaning of Article 3d of Implementing Regulation (EU) 2019/1842 for the investment referred to in Article 6(1), point (c), and the documentary evidence that the investment will lead to greenhouse gas emission reductions equivalent to those recommended by the audit report or by the certified Energy Management System for the installation concerned.
(iii) a technical decarbonisation plan and a certified project impact assessment demonstrating that the intended investments lead to verifiable emission reductions. (c) for operators seeking to meet the conditionality requirements of Article 6(3) both of the following:
(i) a verified climate-neutrality report in accordance with Article 3b of Implementing Regulation (EU) 2019/1842 that has been verified as satisfactory in accordance with Commission Implementing Regulation (EU) 2018/206722; or for operators submitting a climate neutrality plan for the first time, a climate neutrality plan for their activities covered by Directive 2003/87/EC in accordance with Implementing Regulation (EU) 2023/2441;
(ii) documentary evidence of the legal commitment within the meaning of Article 3d of Implementing Regulation (EU) 2019/1842 for the investment referred to in Article 6(3), and the documentary evidence that the investment leads to the achievement of the targets and milestones referred to in the most recent climate neutrality plan in accordance with Implementing Regulation (EU) 2023/2441.
3. For operators, an application submitted pursuant to paragraph 1 shall be accompanied by the following specific elements:
(a) production data for the production reference period covered by the call for application referred to in paragraph 1 to verify the eligibility for financial support;
(b) the share of production sold in third countries broken down by country of export;
(c) if applicable, a tax transparency report and an ownership structure disclosure providing evidence that the operator and its parent company are not established in jurisdictions listed in the Union list of non-cooperative jurisdictions for tax purposes.
4. SMEs, as defined in Directive 2013/34/EU of the European Parliament and of the Council1a, shall not be required to update their existing climate-neutrality plans, verified climate-neutrality report, energy audit, certified Energy Management System or certified Environmental Management System incompliance with CISAF, solely for the purpose of receiving support from this Fund.
5. Within 15 days of reception of the application referred to in paragraph 1, the Commission shall assess the completeness of the information provided by the applicant which is necessary to evaluate the eligibility of the operator and the downstream operator for support under the Fund. If before the end of 15 days, the Commission assesses that the information provided by the applicant is incomplete or insufficient to conclude the evaluation of its request, the applicant shall be requested to submit complementary information within 15 days. Following an acknowledgment of completeness, the applicant shall not be asked to provide any new information unless duly justified.
6. The Commission is empowered to adopt implementing acts to further define details related to procedural requirements, the documents and evidence submitted as part of the application procedure to be eligible for financial support by the Fund, particularly the minimum contents to be submitted as part of the production data report and the documentary evidence of the legal commitment within the meaning of Article 3d of Implementing Regulation (EU) 2019/1842.
7. The Commission shall assess, with the support of relevant competent authorities, the documentation provided in accordance with paragraph 2. Based on that assessment, the Commission shall decide whether the conditions set out in Articles 5 and 6 have been met. It shall recover funds if the conditions were not met and bring legal proceedings where necessary in that regard.
8. By 30 June each year, the Commission shall establish a list identifying all the applicants that applied for support by 31 March each year, respectively, that meet the conditions as determined in accordance with paragraph 7, their respective installations and the level of support calculated in accordance with Article 8.
9. When establishing the details under Article 7(3) of this Chapter, the Commission shall align them and the requirements of Article 6 with the existing Union acquis, and notably with the requirements and methodologies for monitoring, reporting and verification of emissions laid down in this Directive.
10. Following the conclusion of the decisions referred to in Article 9(3), the Commission shall make the relevant documentation, evidence and plans submitted to the Commission, by operators, pursuant to this Article, publicly available. This shall be done in accordance with the applicable Union law on the protection of personal data, as well as commercially sensitive information and trade secrets, in particular pursuant to Regulation (EU) 2018/1725 of the European Parliament and of the Council1a and Directive (EU) 2016/943 of the European Parliament and of the Council1b, respectively.
Article 8 - Calculation of support
1. The Commission shall assess and calculate the amount of financial support to be provided to eligible operators, for the production of each of the exported goods listed in the Annex I of Regulation (EU) 2023/956, based on the amount of free allocation phased out, in a transparent manner. That amount of allowances shall be calculated in accordance with Article 16(8) of Delegated Regulation (EU) 2019/331 and take into account the Decision the Commission has adopted in accordance with Article 23(4) of that Regulation. To obtain the financial value of the support, the amount of free allowances shall be adjusted to the share of production (in volume) of goods listed in the Annex that has been exported to third-country markets, and multiplied with the annual average of the closing prices of EU ETS allowances on the common auction platform for the reference period for which an application for support has been submitted in accordance with Article 7(1) of this Chapterand in accordance with the procedures laid down in Delegated Regulation (EU) 2023/2830.
2. Pursuant to paragraph 1, when calculating the level of financial support, the Commission shall take into account, to the extent possible, the competitiveness risk faced by the goods in the country destination due to differences in carbon-pricing schemes and equivalent regulatory constraints on industrial emissions between that destination and the Union, notably by establishing a methodology based on public and objective indicators.
3. The total financial support granted by the Fund to all final beneficiaries shall not exceed the resources of the Fund, reduced by the administrative costs incurred by the Commission.
Article 9 - Disbursement decision by the Commission
1. Upon establishing the list of beneficiaries, the Commission shall perform the following actions:
(a) review the calculation performed pursuant to Article 8;
(b) assess the inclusion of each operator in the list;
(c) assess the information submitted in accordance with Article 7(2);
(d) determine the individual amounts of financial support to be awarded to each final beneficiary.
2. The Commission shall proportionally reduce the amount of support to be awarded to each final beneficiary in accordance with Article 8(1) where it is needed to comply with Article 8(2).
3. Based on its assessment in accordance with paragraph 1, the Commission shall adopt an implementing decision by 31 December each year for the lists received the respective year on the financial support to the operators, including downstream operators, upon availability of the resources of the Fund. That decision shall constitute a financing decision within the meaning of Article 110 of Regulation (EU, Euratom) 2024/2509. The notification of that decision to the competent authority concerned shall constitute an individual legal commitment within the meaning of Regulation (EU, Euratom) 2024/2509.
4. The decision referred to in paragraph 3 shall be publicly available and set out the total amount to be transferred to the respective Member State, the list of the final beneficiaries of financial support and the amount for each recipient, and information on how the beneficiaries meet the conditions set out in Article 6.
Article 10 - Disbursement of financial support
1. Within one month following the adoption of the decision referred to in Article 8(3), the Commission shall disburse the total amount set out in that decision to the relevant competent authorities. By derogation from Article 196(3) of Regulation (EU, Euratom) 2024/2509, the Commission may also pay support with respect to investments and productions even if already completed.
2. Within one month upon receipt of the funding from the Commission and at the latest on 31 March each year for the implementing decisions referred to in Article 10(3) adopted by 31 December the relevant year, the relevant competent authorities shall disburse the financial support awarded by the Commission under the decisions referred to in Article 9(3) to the final beneficiaries and shall inform the Commission immediately after the disbursements are made.
Article 11 - Protection of the financial interests of the Union
1. Member States, as beneficiaries of funds under the Fund, and relevant competent authorities shall take all the appropriate measures to protect the financial interests of the Union and to ensure that the use of the financial allocations complies with applicable Union and national law, in particular regarding the prevention, detection and tackling of fraud, corruption, conflicts of interests and all other irregularities affecting the financial interests of the Union. To that effect, Member States shall take any necessary measures to prevent wrongful payouts and for the recovery of amounts wrongly paid. Member States shall rely on their national budget management, control and recovery systems.
2. The decision referred to in Article 9(3) shall provide for the following obligations on the Member States:
(a) that Member States take appropriate measures to prevent, detect and tackle fraud, corruption, conflicts of interests, non-compliance and all other irregularities affecting the financial interest of the Union within the meaning of Article 61 of Regulation (EU, Euratom) 2024/2509 and to take legal action to recover funds that have been unduly spent or misappropriated; the Commission, with support of the Member State relevant competent authorities, shall verify that the final beneficiaries have used the financial support to carry out the investments and that they have complied with the conditions referred to in Article 6;
(b) that Member States maintain data as regards the name of all final beneficiaries of the financial allocations, their VAT registration numbers or tax identification numbers and amount of the financial allocations from the Fund;
(c) to expressly authorise that the Commission, OLAF, the Court of Auditors and, in respect of those Member States participating in enhanced cooperation pursuant to Regulation (EU) 2017/1939, the EPPO can exert their rights as provided for in Article 129(1) of Regulation (EU, Euratom) 2024/2059 and to impose obligations on all final beneficiaries of the financial support to expressly authorise the Commission, OLAF, the Court of Auditors and, where applicable, EPPO to exert their rights as provided for in Article 129(1) of Regulation (EU, Euratom) 2024/2059 and to impose similar obligations on all final beneficiaries of funds disbursed;
(d) that Member States shall keep records in accordance with Article 133 of Regulation (EU, Euratom) 2024/2509;
(e) to expressly authorise that the Commission has the right to reduce the financial support under the Fund proportionately and recover any amount due to the Union budget, in cases of fraud, corruption, conflict of interests, non-compliance or any other irregularity affecting the financial interests of the Union.
3. When deciding on the amount of the recovery and reduction the Commission shall respect the principle of proportionality and shall take into account the seriousness of the concerned fraud, corruption, conflict of interests and other irregularity affecting the financial interests of the Union, or of a breach of an obligation. The Commission shall give the Member State the opportunity to present its observations before the reduction is made.
Article 12 - Obligations of final beneficiaries
1. The final beneficiaries shall be responsible of the data submitted under this Regulation by them and keep complete and accurate records of the activities referred to in Article 6 substantiating their submissions.
2. To this end, the Commission is empowered to adopt implementing acts to specify the responsibilities and monitoring obligations of the final beneficiaries, including by specifying the data retention period.
3. The final beneficiaries shall cooperate with the Commission or the relevant competent authority when they perform audits, evaluations, and monitoring activities. Upon request, the final beneficiaries shall timely provide the information and documents referred to in paragraph 1 to the competent authorities and to the Commission.

Or. en

Amendment 2595

Jens Gieseke, Ralf Seekatz, Sophia Kircher, Norbert Herhammer, Gheorghe Falcă

Proposal for a directive

Article 1 – paragraph 1 – point 21 a (new)

Directive 2003/87/EC

Article 11a

Amendment: Present text and Amendment
Present textAmendment
(21a) Article 11a is amended as follows:
1. Subject to paragraphs 2 and 3 of this Article, aircraft operators that hold an air operator certificate issued by a Member State or are registered in a Member State, including in the outermost regions, dependencies and territories of that Member State, shall be able to use the following units to comply with their obligations to cancel units in respect of the quantity notified pursuant to Article 12(6) as laid down in Article 12(9): (a) credits authorised by parties participating in the mechanism established under Article 6(4) of the Paris Agreement; (b) credits authorised by the parties participating in crediting programmes which have been considered eligible by the ICAO Council as identified in the implementing act adopted pursuant to paragraph 8; (c) credits authorised by parties to agreements pursuant to paragraph 5; (d) credits issued in respect of Union level projects pursuant to Article 24a. 2. Units referred to in paragraph 1, points (a) and (b), may be used if the following conditions have been met: (a) they originate from a State that is a Party to the Paris Agreement at the time of use; (b) they originate from a State that is listed in the implementing act adopted pursuant to Article 25a(3) as participating in ICAO’s Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA). This condition shall not apply in respect of emissions released before 2027, nor shall it apply in respect of least developed countries or small island developing States, as defined by the United Nations, except for those States whose GDP per capita equals or exceeds the Union average. 3. Units referred to in paragraph 1, points (a), (b) and (c), may be used if arrangements are in place for authorisation by the participating parties, timely adjustments are made to the reporting of anthropogenic emissions by sources and removals by sinks covered by the nationally determined contributions of the participating parties, and double counting and a net increase in global emissions are avoided. The Commission shall adopt implementing acts laying down detailed requirements for the arrangements referred to in the first subparagraph of this paragraph, which may include reporting and registry requirements, and for listing the States or programmes which apply those arrangements. Those arrangements shall take account of flexibilities accorded to least developed countries and small island developing States in accordance with paragraph 2 of this Article. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 22a(2).’ ; (b) paragraph 4 is deleted; (c) the following paragraph is added: ‘8. The Commission shall adopt implementing acts listing units which have been considered eligible by the ICAO Council and that fulfil the conditions set out in paragraphs 2 and 3 of this Article. The Commission shall also adopt implementing acts to update that list, as appropriate. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 22a(2).’1. Subject to paragraphs 2 and 3 of this Article, aircraft operators that hold an air operator certificate issued by a Member State or are registered in a Member State, including in the outermost regions, dependencies and territories of that Member State, shall be able to use the following units to comply with their obligations to cancel units in respect of the quantity notified pursuant to Article 12(6) as laid down in Article 12(9): (a) credits authorised by parties participating in the mechanism established under Article 6(4) of the Paris Agreement; (b) credits authorised by the parties participating in crediting programmes which have been considered eligible by the ICAO Council as identified in the implementing act adopted pursuant to paragraph 8; (c) credits authorised by parties to agreements pursuant to paragraph 5; (d) credits issued in respect of Union level projects pursuant to Article 24a. 2. Units referred to in paragraph 1, points (a) and (b), may be used if the following conditions have been met: (a) they originate from a State that is a Party to the Paris Agreement at the time of use

Or. en

(02003L0087)

Amendment 2596

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu

Proposal for a directive

Article 1 – paragraph 1 – point 21 a (new)

Directive 2003/87/EC

Article 11a – paragraphs 2 and 3

Amendment: Present text and Amendment
Present textAmendment
(21a) Article 11a, paragraph 2 is replaced by the following, paragraph 3 is deleted:
2. Units referred to in paragraph 1, points (a) and (b), may be used if the following conditions have been met:(a) they originate from a State that is a Party to the Paris Agreement at the time of use;(b) they originate from a State that is listed in the implementing act adopted pursuant to Article 25a(3) as participating in ICAO’s Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA). This condition shall not apply in respect of emissions released before 2027, nor shall it apply in respect of least developed countries or small island developing States, as defined by the United Nations, except for those States whose GDP per capita equals or exceeds the Union average.3. Units referred to in paragraph 1, points (a), (b) and (c), may be used if arrangements are in place for authorisation by the participating parties, timely adjustments are made to the reporting of anthropogenic emissions by sources and removals by sinks covered by the nationally determined contributions of the participating parties, and double counting and a net increase in global emissions are avoided.The Commission shall adopt implementing acts laying down detailed requirements for the arrangements referred to in the first subparagraph of this paragraph, which may include reporting and registry requirements, and for listing the States or programmes which apply those arrangements. Those arrangements shall take account of flexibilities accorded to least developed countries and small island developing States in accordance with paragraph 2 of this Article. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 22a(2).2. Units referred to in paragraph 1, points (a) and (b), may be used if the following conditions have been met:(a) they originate from a State that is a Party to the Paris Agreement at the time of use;
3. Units referred to in paragraph 1, points (a), (b) and (c), may be used if arrangements are in place for authorisation by the participating parties, timely adjustments are made to the reporting of anthropogenic emissions by sources and removals by sinks covered by the nationally determined contributions of the participating parties, and double counting and a net increase in global emissions are avoided.deleted

Or. en

(02003L0087-20240301)

Justification

Under international law, the EU must uphold its CORSIA commitment to globally harmonise regulation on international aviation emissions, including EEUs under the auspices of ICAO.

Amendment 2597

Mohammed Chahim

Proposal for a directive

Article 1 – paragraph 1 – point 20 b (new)

Directive 2003/87/EC

Chapter IIIa (new) – Article x – points a to d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(21b) The following points are added and relevant for Chapter IIIa (new):
(a) 'Decarbonisation Fund' or 'Fund' means the fund established by Article 10[x];
(b) 'eligible good' means any good listed in Annex I of Regulation (EU) 2023/956, as well as any good identified as subject to a heightened remaining risk of carbon leakage pursuant to Article 10x;
(c) 'production year' means the calendar year, from 2031 to 2040, in which the eligible goods for which support is applied for under Article 10[x] have been produced;
(d) 'final beneficiary' means an operator of an installation receiving financial support from the Fund;

Or. en

Amendment 2598

Anna Zalewska, Jacek Ozdoba, Jadwiga Wiśniewska, Daniel Obajtek, Beata Szydło, Rihards Kols, Patryk Jaki, Marion Maréchal

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point –a (new)

Directive 2003/87/EC

Article 12 – paragraph 1

Amendment: Present text and Amendment
Present textAmendment
(aa) In Article 12, paragraph 1 is amended as follows:
1. Member States shall ensure that allowances can be transferred between:"Allowances may be transferred between compliance entities for the purpose of meeting current or future surrender obligations under this Directive, and may also be transferred by Member States, the Commission, the Central Administrator, national administrators, auctioneers or other public bodies where necessary for the auctioning, allocation, administration, cancellation or other operation of the EU ETS in accordance with this Directive.
(a) persons within the Union;Financial institutions shall not acquire, hold, receive, transfer, sell or otherwise trade allowances, directly or indirectly, whether on their own account or on behalf of another person.
(b) persons within the Union and persons in third countries, where such allowances are recognised in accordance with the procedure referred to in Article 25 without restrictions other than those contained in, or adopted pursuant to, this Directive.The second subparagraph shall not preclude the provision of clearing, settlement or other purely technical services, provided that the financial institution does not acquire beneficial ownership of the allowances, exercise discretion over them or engage in trading in allowances.

Or. en

(02003L0087-20240301)

Justification

The amendment responds to concerns that the participation of financial institutions and other non-compliance entities facilitates speculative trading in EU allowances, potentially amplifying price movements beyond those driven by the underlying compliance needs of ETS sectors. Restricting trading to entities subject to surrender obligations would strengthen the link between EUA prices and actual demand for compliance, while reducing opportunities for purely financial speculation and excessive price volatility.

Amendment 2599

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i

Directive 2003/87/EC

Article 12 – paragraph 3 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging.;(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging and, from 1 January 2029, a number of allowances that is equal to its total climate impacts from contrails determined on the basis of the data reported pursuant to Article 14(5) and expressed in tonnes of CO2 equivalent on a 100-year Global Warming Potential basis during the preceding calendar year, as verified in accordance with Article 15 .;

Or. en

Amendment 2600

Li Andersson, Jonas Sjöstedt, Per Clausen

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i

Directive 2003/87/EC

Article 12 – paragraph 3 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging.;(b) Each aircraft operator surrenders a number of aviation allowances issued within the total quantity determined pursuant to Article 3c equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging; allowances issued outside the total quantity determined pursuant to Article 3c shall not be valid for meeting aircraft operators’ surrender obligations under this paragraph.

Or. en

Justification

To preserve the environmental integrity of the EU ETS and prevent the continued growth of aviation emissions from consuming the increasingly scarce allowances available to stationary sectors, aircraft operators should fulfil their surrender obligations exclusively with aviation allowances. Establishing separate compliance pools would ensure that emission reductions required from industry and the power sector are not weakened by additional demand from aviation.

Amendment 2601

Marie-Luce Brasier-Clain, Anne-Sophie Frigout, Mathilde Androuët, Valérie Deloge, Silvia Sardone, Barbara Bonte, Ondřej Knotek, Jana Nagyová

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i

Directive 2003/87/EC

Article 12 – paragraph 3 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging.;(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15;

Or. fr

Amendment 2602

Jens Gieseke, Ralf Seekatz, Sophia Kircher, Norbert Herhammer, Gheorghe Falcă, Andrea Wechsler, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i

Directive 2003/87/EC

Article 12 – paragraph 3 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging.;(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15.

Or. en

Amendment 2603

Andreas Glück, Jan-Christoph Oetjen, Jeannette Baljeu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i

Directive 2003/87/EC

Article 12 – paragraph 3 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging.;(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct the amount of emissions offset with CORSIA eligible fuels or CORSIA eligible emissions units from CORSIA offsetting, and thereby avoid double charging.;

Or. en

Justification

The Commission proposal covers all the emissions within the ETS scope. For routes covered by both schemes, the CORSIA costs for the emission units can be deducted from the total carbon cost of ETS. However, the CORSIA costs related to the purchase of SAF cannot be deducted. This approach is problematic, because a cost-based deduction does not treat the two CORSIA compliance options equally and may therefore promote the use of emission units over SAF. Second, it contradicts the Chicago Convention, whereby the same emissions should not be charged twice.

Amendment 2604

Dolors Montserrat, Nicolás Pascual de la Parte, Rosa Estaràs Ferragut, Adrián Vázquez Lázara, Esteban González Pons, Juan Ignacio Zoido Álvarez, Carmen Crespo Díaz, Susana Solís Pérez, Esther Herranz García, Pablo Arias Echeverría, Fernando Navarrete Rojas, Raúl de la Hoz Quintano, Gabriel Mato, Isabel Benjumea Benjumea, Elena Nevado del Campo, Alma Ezcurra Almansa, Pilar del Castillo Vera, Maravillas Abadía Jover, Borja Giménez Larraz, Antonio López-Istúriz White, Javier Zarzalejos, Francisco José Millán Mon

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i

Directive 2003/87/EC

Article 12 – paragraph 3 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging.;(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced in full as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid any double charging.;

Or. en

Amendment 2605

Adam Jarubas, Andrzej Halicki, Riho Terras, Ewa Kopacz, Elżbieta Katarzyna Łukacijewska, Hanna Gronkiewicz-Waltz, Bartosz Arłukowicz

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i

Directive 2003/87/EC

Article 12 – paragraph 3 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging.;(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, excluding emissions already covered under ICAO CORSIA.

Or. en

Amendment 2606

Seán Kelly

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i

Directive 2003/87/EC

Article 12 – paragraph 3 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging.;(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, excluding emissions already covered under ICAO CORSIA and as verified in accordance with Article 15;

Or. en

Justification

Under international law, the EU must uphold its CORSIA commitment to globally harmonised regulation on international aviation emissions. Full implementation of CORSIA by the EU would also remove the risk of double charging present in the proposal even with this clause, given that 3rd countries without an ETS scheme of their own would not be covered.

Amendment 2607

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i

Directive 2003/87/EC

Article 12 – paragraph 3 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging.;(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, excluding emissions already covered under ICAO CORSIA and as verified in accordance with Article 15.;

Or. en

Amendment 2608

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i

Directive 2003/87/EC

Article 12 – paragraph 3 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year, as verified in accordance with Article 15, reduced as set out in paragraph 3-f to deduct costs incurred from CORSIA offsetting, and thereby avoid double charging.;(b) each aircraft operator surrenders a number of allowances that is equal to its total emissions during the preceding calendar year , excluding emissions already covered under ICAO CORSIA and as verified in accordance with article 15.;

Or. en

Amendment 2609

Ruggero Razza, Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i

Directive 2003/87/EC

Article 12 – paragraph 3 – point ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the request of a Member State, provide by means of an implementing act that Member States are to consider the requirements set out in those provisions to be satisfied and that they are to take no action against shipping companies in respect of emissions released until 31 December 2040 from voyages performed by passenger ships, other than cruise passenger ships, by ro-pax ships, by ro-ro cargo ships and by any other cargo ships transporting goods, raw materials or commodities, between a port of an island under the jurisdiction of that requesting Member State, with no road or rail link with the mainland and either with a population of fewer than 200 000 permanent residents according to the latest best data available in 2022, or when the regional GDP per capita of the NUTS level 2 region in which that island is situated, measured in purchasing power standards (PPS), is below 75 % of the EU-27 average, and a port under the jurisdiction of that same Member State, and from the activities, within a port, of such ships in relation to such voyages. For the purposes of the second criterion, eligibility shall be determined on the latest 2024 data, and shall remain valid until 31 December 2040, notwithstanding subsequent annual fluctuations or statistical revisions. The Commission shall publish a list of the islands referred to in the first subparagraph and the ports concerned and keep that list up to date.

Or. en

Amendment 2610

André Franqueira Rodrigues, Sérgio Gonçalves, Juan Fernando López Aguilar

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i a (new)

Directive 2003/87/EC

Article 3– paragraph 3-ea (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ia) in Article 12, the following paragraph is inserted after paragraph 3:
An obligation to surrender allowances shall not arise in respect of emissions released at berth by containerships and passenger ships within a port of call located in an outermost region, where no on-shore power supply connection point is available to the ship in that port.

Or. en

Justification

If the ship port of departure is not located in the same Member State, ships will continue to pay for allowances covering all emissions produced whilst berthed. This puts ports in the outermost regions – which are exempt from installing OPS – at a competitive disadvantage compared with ports that have this system in place. This situation is particularly relevant in the cruise market, where operators can easily call at another port, thereby bypassing these destinations.

Amendment 2611

Matteo Ricci

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i a (new)

Directive 2003/87/EC

Article 12 – paragraph 3–d

Amendment: Present text and Amendment
Present textAmendment
(ia) Article 12 – paragraph 3-d is replaced by the following
3-d. By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the request of a Member State, provide by means of an implementing act that Member States are to consider the requirements set out in those provisions to be satisfied and that they are to take no action against shipping companies in respect of emissions released until 31 December 2035 from voyages performed by passenger ships, other than cruise passenger ships, and by ro-pax ships, between a port of an island under the jurisdiction of that requesting Member State, with no road or rail link with the mainland and with a population of fewer than 200 000 permanent residents according to the latest best data available in 2022, and a port under the jurisdiction of that same Member State, and from the activities, within a port, of such ships in relation to such voyages. The Commission shall publish a list of the islands referred to in the first subparagraph and the ports concerned and keep that list up to date.""3-d. By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the request of a Member State, provide by means of an implementing act that Member States are to consider the requirements set out in those provisions to be satisfied and that they are to take no action against shipping companies in respect of emissions released until 31 December 2035 from voyages performed by passenger ships, other than cruise passenger ships, and by ro-pax ships, between a port of an island under the jurisdiction of that requesting Member State, with no road or rail link with the mainland and either with a population of fewer than 200 000 permanent residents according to the latest best data available in 2022, and/or Nuts 2 insular regions with a GDP below the 75% of the EU 27 average, and a port under the jurisdiction of that same Member State, and from the activities, within a port, of such ships in relation to such voyages. The Commission shall publish a list of the islands referred to in the first subparagraph and the ports concerned and keep that list up to date.

Or. en

(02003L0087)

Amendment 2612

André Franqueira Rodrigues, Sérgio Gonçalves, Juan Fernando López Aguilar

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point i b (new)

Directive 2003/87/EC

Article 3– paragraph 3-ea (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ib) in Article 12, the following paragraph is inserted after paragraph 3:
An obligation to surrender allowances shall not arise in respect of emissions by containerships released from voyages between two ports of the same Member State, neither of which is located in an outermost region, and from the activities, within a port, of such ships in relation to such voyages, where all the cargo carried on such voyage is to be unloaded in an outermost region of that Member State.

Or. en

Justification

It would be important to extend the exemption to all journeys whose final destination is an outermost region. This would be straightforward to implement, as it is possible to verify the final destination of all cargo carried by checking documents such as the bill of lading.

Amendment 2613

Grégory Allione

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–c

Amendment: Present text and Amendment
Present textAmendment
3-c. By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the joint request of two Member States, one of which having no land border with another Member State and the other Member State being the geographically closest Member State to the Member State without such a land border, provide by means of an implementing act that Member States are to consider the requirements set out in those provisions to be satisfied and that they are to take no action against shipping companies in respect of emissions released until 31 December 2030 from voyages performed by passenger or ro-pax ships in the framework of a transnational public service contract or a transnational public service obligation, set out in the joint request, connecting the two Member States, and from the activities, within a port, of such ships in relation to such voyages.– ‘3-c. By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the request of a Member State, provide by means of an implementing act that Member States are to consider the requirements set out in those provisions to be satisfied and that they are to take no action against shipping companies in respect of emissions released until 31 December 2035 from voyages performed by passenger ships, other than cruise passenger ships, and by ro-pax ships, between a port of an island under the jurisdiction of that requesting Member State, with no road or rail link with the mainland and with a population of fewer than 200 000 permanent residents according to the latest best data available in 2022 or providing maritime transport services within the meaning of Regulation (EEC) No 3577/92 under public service obligations or public service contracts, and a port under the jurisdiction of that same Member State, and from the activities, within a port, of such ships in relation to such voyages.

Or. en

Amendment 2614

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3-g

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
‘3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles. Where the shipping companies benefit from the derogation referred to in the first subparagraph, they may surrender fewer allowances than their verified emissions in respect of emissions released from the activities within a port in relation to the voyages referred to in the first subparagraph. The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership. Where fewer allowances are surrendered compared to the verified emissions, once the difference between verified emissions and allowances surrendered has been established in respect of each year, an amount of allowances corresponding to that difference shall be cancelled rather than auctioned pursuant to Article 10.deleted

Or. en

Justification

This new derogation would create a significant preferential treatment to liner shipping companies operating vessels of 10,000 TEU or larger. A more proportionate way to deal with possible risk of evasion is already done via the expansion of the list of non-EU transshipment ports.

Amendment 2615

Sakis Arnaoutoglou, Nikos Papandreou, Yannis Maniatis, Nikolas Farantouris

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.deleted

Or. en

Justification

Article 3ga(2) already provides safeguards against circumvention through neighbouring container transhipment ports. A further derogation limited to large containerships risks differentiated treatment between shipping segments and weakening the level playing field. Port competitiveness should instead be supported through effective anti-evasion measures, infrastructure investment and progress towards a global IMO framework.

Amendment 2616

Letizia Moratti, Dolors Montserrat

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Present text and Amendment
Present textAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender a reduced number of allowances in respect of verified emissions released from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State, and from a port of call under the jurisdiction of a Member State to a port of call outside the jurisdiction of a Member State, if performed by containerships with a capacity of 5 000 TEU or above and the distance of each voyage exceeds 300 nautical miles. For each eligible voyage, the amount of allowances to be surrendered (A) shall be calculated by multiplying the number of allowances corresponding to 50 % of the verified emissions (E) from that voyage, pursuant to Article 3ga(1), by the transhipment factor in Table 1 (TF) and the distance factor in Table 2 (D), in accordance with the following formula: A = 0.50 × E × TF× D .
For the purpose of this paragraph:
- a container shall be considered to be transhipped where, at a port of call in the course of its transport to its final destination, it is unloaded from a ship for the purpose of being loaded onto another ship.
- the percentage of transhipment shall be defined as the share, measured in twenty-foot equivalent units (TEU), of transhipped containers loaded and unloaded by the containership during the relevant port call under the jurisdiction of a Member State, in relation to the total number of containers loaded and unloaded by that containership during the same port call, on the basis of the information contained in the ship’s cargo manifest, including the relevant loading and unloading records.
For each reporting year, the reduction resulting from this paragraph shall be the difference between the number of allowances that would otherwise have been required to be surrendered for the eligible voyages under Article 3ga(1) and paragraph 3, first subparagraph, point (c), and the number required to be surrendered after applying this paragraph. An amount of allowances corresponding to that difference shall be cancelled rather than auctioned pursuant to Article 10.
Table 1 Transhipment factor
Percentage of transhipment at the EU port call - Transhipment factor
More than 50 % - 0.00
More than 40 % and up to 50 % - 0.20
More than 30 % and up to 40 % - 0.50
Up to and including 30 % - 1.00
Table 2 Distance factor
Distance of the eligible voyage in nautical miles - Distance factor
More than 300 and up to 3 000 - 1.00
More than 3 000 and up to 4 000 - 0.90
More than 4 000 and up to 5 000 - 0.80
More than 5 000 and up to 6 500 - 0.70
More than 6 500 and up to 9 700 - 0.50
More than 9 700 - 0.30

Or. en

Amendment 2617

Dolors Montserrat, Peter Liese, Nicolás Pascual de la Parte, Rosa Estaràs Ferragut, Adrián Vázquez Lázara, Esteban González Pons, Juan Ignacio Zoido Álvarez, Carmen Crespo Díaz, Susana Solís Pérez, Esther Herranz García, Pablo Arias Echeverría, Fernando Navarrete Rojas, Raúl de la Hoz Quintano, Gabriel Mato, Isabel Benjumea Benjumea, Elena Nevado del Campo, Alma Ezcurra Almansa, Pilar del Castillo Vera, Maravillas Abadía Jover, Borja Giménez Larraz, Antonio López-Istúriz White, Javier Zarzalejos, Francisco José Millán Mon

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages performed by containerships from a port of call outside the jurisdiction of a Member State and from a port of call under the jurisdiction of a Member State to a port of call outside the jurisdiction of a Member State, based on the Carbon Leakage Factor. Where the shipping companies benefit from the derogation referred to in the first subparagraph, they may surrender fewer allowances than their verified emissions in respect of emissions released from the activities within a port in relation to the voyages referred to in 3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages performed by containerships from a port of call outside the jurisdiction of a Member State and from a port of call under the jurisdiction of a Member State to a port of call outside the jurisdiction of a Member State, based on the Carbon Leakage Factor. Where the shipping companies benefit from the derogation referred to in the first subparagraph, they may surrender fewer allowances than their verified emissions in respect of emissions released from the activities within a port in relation to the voyages referred to in the first subparagraph.
The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the Carbon Leakage Factor. The Carbon Leakage Factor shall be based on the total distance sailed during the last leg of the voyage. The percentage of emissions subject to the ETS shall be as follows:
< 3,000 nautical miles: 50%
3,000 - 4,000 nautical miles: 45%
4,000 – 5,000 nautical miles 40%
5,000 - 6,500 nautical miles: 35%
6,500 - 9,700 nautical miles: 25%
> 9,700 nautical miles: 15%
Where fewer allowances are surrendered compared to the verified emissions, once the difference between verified emissions and allowances surrendered has been established in respect of each year, an amount of allowances corresponding to that difference shall be cancelled rather than auctioned pursuant to Article 10.

Or. en

Amendment 2618

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Ruggero Razza, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.‘3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies shall not surrender allowances in respect of emissions released from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State, and from a port of call under the jurisdiction of a Member State to a port of call outside the jurisdiction of a Member State, if performed by containerships of 8 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles and either:
(a) The port located under the jurisdiction of a Member State is in the list of major Union container transhipment ports established pursuant to paragraph 2; or
(b) at least 50 % of the containers, measured in twenty-foot equivalent units, loaded and unloaded during the port call are transhipped containers, as evidenced by the information contained in the ship cargo manifest.
For the purpose of this paragraph, a container shall be considered to be transhipped where, at a port of call in the course of its transport to its final destination, it is unloaded from a ship for the purpose of being loaded onto another ship.

Or. en

Amendment 2619

Letizia Moratti, Peter Agius, Massimiliano Salini, Flavio Tosi

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies shall not surrender allowances in respect of emissions released from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State, and from a port of call under the jurisdiction of a Member State to a port of call outside the jurisdiction of a Member State, if performed by containerships of 8 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles and either:
(a) The port located under the jurisdiction of a Member State is in the list of major Union container transhipment ports established pursuant to paragraph 2; or
(b) at least 50 % of the containers, measured in twenty-foot equivalent units, loaded and unloaded during the port call are transhipped containers, as evidenced by the information contained in the ship cargo manifest.
For the purpose of this paragraph, a container shall be considered to be transhipped where, at a port of call in the course of its transport to its final destination, it is unloaded from a ship for the purpose of being loaded onto another ship.

Or. en

Amendment 2620

André Franqueira Rodrigues

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State, and for outbound voyages between ports under the jurisdiction of a Member State to ports outside the jurisdiction of a Member State, if performed by containerships of 5 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.

Or. en

Justification

The outbound voyage should be covered as supply chain actors assess the entirety of the costs linked to the transport of the container. On the technical level, this can be easily achieved by leveraging the Re-export notification (REN) issued by the shipping line which provides information with respect to the second leg of the journey. Establishing the threshold at 5,000 TEU is also relevant to target carbon leakage as also smaller ships are used to perform voyages associated to relay traffic.

Amendment 2621

Wouter Beke, Liesbet Sommen, Pascal Arimont

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State, and for outbound voyages between ports under the jurisdiction of a Member State to ports outside the jurisdiction of a Member State, if performed by containerships of 5,000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.

Or. en

Justification

The threshold should be set at 5,000 TEU, as smaller vessels also undertake voyages associated with relay traffic. This adjustment would help address business and carbon leakage and ensure a level playing field for vessels between 5,000 and 10,000 TEU. The outbound leg should also be covered, as supply chain operators consider the total cost of transporting a container across all legs of the journey. Information in the re-export notification (REN) submitted by the shipping line could be used to identify the subsequent leg and facilitate implementation.

Amendment 2622

Annalisa Corrado, Brando Benifei

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State and from a port of call under the jurisdiction of a Member State to a port of call outside the jurisdiction of a Member State, if performed by containerships of 8 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.

Or. en

Justification

The risk of diversion of transhipment activities towards neighbouring non-EU ports is not limited to the largest containerships and may concern both inbound and outbound traffic. The amendment aims to strengthen the protection of European transhipment hubs against carbon leakage and unfair competition while preserving the environmental integrity of the EU ETS.

Amendment 2623

Silvia Sardone, Mathilde Androuët, Marie-Luce Brasier-Clain, Susanna Ceccardi, Barbara Bonte, Anna Maria Cisint

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.3-g. An obligation to surrender allowances shall not arise in respect of emissions released from voyages performed by container ships calling at an EU transhipment hub designated pursuant to Article 3ga(2), where the voyage departs from a port of call outside the jurisdiction of a Member State and arrives at an EU transhipment hub, or departs from an EU transhipment hub and arrives at a port of call outside the jurisdiction of a Member State, nor in respect of emissions released during the port call at the EU transhipment hub in connection with those voyages.

Or. en

Amendment 2624

Ondřej Knotek, Jana Nagyová, Antonín Staněk

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.3-g.An obligation to surrender allowances shall not arise in respect of emissions released from voyages performed by container ships calling at an EU transhipment hub designated pursuant to Article 3ga(2), where the voyage departs from a port of call outside the jurisdiction of a Member State and arrives at an EU transhipment hub, or departs from an EU transhipment hub and arrives at a port of call outside the jurisdiction of a Member State, nor in respect of emissions released during the port call at the EU transhipment hub in connection with those voyages.

Or. en

Justification

Container transshipment can move between competing hubs without changes in cargo origin or destination. A carbon-cost difference between EU and third-country hubs can therefore influence routing and investment, particularly for cargo moving between non-EU markets. Exempting extra-EU voyages through designated hubs would address that competitive exposure directly. The measure would apply to container ships and related port calls at listed hubs, while intra-EU voyages would remain covered. This option covers the eligible voyage and port-call emissions

Amendment 2625

Javi López, César Luena, Rosa Serrano Sierra, Alicia Homs Ginel, Juan Fernando López Aguilar, Lina Gálvez, Nicolás González Casares, Leire Pajín, Elena Sancho Murillo

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released from voyages between a port of call outside the jurisdiction of a Member State and a port of call under the jurisdiction of a Member State, in either direction, if such voyages are performed by containerships and exceed 3 000 nautical miles.

Or. en

Justification

The Commission's measure only covers inbound voyages by containerships of 10 000 TEU and above and does not address the splitting of direct deep-sea services through non-EU hubs. These amendments extend the derogation to all containerships on voyages exceeding 3 000 nautical miles, in both directions, with surrender percentages that decrease with distance. The bands are based on a route-level analysis of 74 deep-sea container services and remove the incentive to split routes. They rely only on data verified under the MRV Regulation and complement the rules on transhipment ports.

Amendment 2626

Katri Kulmuni, Jeannette Baljeu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.

Or. en

Justification

Ice-classed ships are essential for safe navigation in ice conditions and preventing environmental damage. The derogation should be permanent to ensure a level playing field. Ships would retain an incentive to reduce emissions, as only 5% of emissions is exempted. The energy-efficiency disadvantage of the highest ice classes (1A and 1A Super) is expected to persist due to technical requirements for safe ice navigation.

Amendment 2627

Katri Kulmuni, Jeannette Baljeu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
‘3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions released until 31 December 2035 from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State if performed by containerships of 10 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles.3-g. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions released from ships sailing in ice conditions, provided that those ships have the ice class IC, IB, IA or IA Super, or an equivalent ice class established based on HELCOM Recommendation 25/7, or a Polar Class from PC1 to PC5. The reduction in the number of allowances to be surrendered shall correspond exclusively to the additional emissions resulting from sailing in ice conditions. Those additional emissions shall be calculated as the difference between the emissions released when sailing in ice conditions and the emissions that the ship would have released over the same distance under open-water conditions. Such emissions corresponding to open-water conditions shall be determined on the basis of the ship’s greenhouse gas emissions and the distance travelled in open-water conditions during the same reporting year, in accordance with Regulation (EU) 2015/757.
The derogation under this paragraph may be applied independently of, or in combination with, the derogation provided for in paragraph 3-e, where applicable. Where both derogations are applied in respect of the same ship for a given reporting year, the reduction in the number of allowances to be surrendered under this paragraph shall be adjusted to reflect the extent to which paragraph 3-e has already reduced the number of allowances to be surrendered in respect of the additional emissions resulting from sailing in ice conditions.

Or. en

Justification

Sailing in ice conditions increases energy consumption, so the number of allowances to be surrendered should be reduced accordingly to ensure a level playing field. The adjustment aligns the EU ETS with FuelEU Maritime and builds on existing monitoring under its ice-navigation derogation. Use of the derogation remains voluntary and subject to monitoring and reporting requirements, while avoiding double counting.

Amendment 2628

Dolors Montserrat, Nicolás Pascual de la Parte, Rosa Estaràs Ferragut, Adrián Vázquez Lázara, Esteban González Pons, Juan Ignacio Zoido Álvarez, Carmen Crespo Díaz, Susana Solís Pérez, Esther Herranz García, Pablo Arias Echeverría, Fernando Navarrete Rojas, Raúl de la Hoz Quintano, Gabriel Mato, Isabel Benjumea Benjumea, Elena Nevado del Campo, Alma Ezcurra Almansa, Pilar del Castillo Vera, Maravillas Abadía Jover, Borja Giménez Larraz, Antonio López-Istúriz White, Javier Zarzalejos, Francisco José Millán Mon

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–ga (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Eligibility and the applicable factor shall be determined from data held by the shipping company and, where possible, from information already reported under Regulation (EU) 2015/757. No port authority or terminal operator shall be required to certify the ultimate origin or destination of cargo or assume additional monitoring, reporting or verification duties.
The Commission shall review the effectiveness of this paragraph annually using evidence on services, deployed capacity, transhipment volumes, direct connectivity and investment, and shall propose adjustments where carbon or business leakage persists.

Or. en

Amendment 2629

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–ga (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
⁠The Commission shall, by means of implementing acts, establish a list of major Union container transhipment ports and update that list by 31 December every two years thereafter. Those implementing acts shall list a port as a major Union container transhipment port where the share of transhipment of containers, measured in twenty-foot equivalent units, exceeds 65 % of the total container traffic of that port during the most recent twelve-month period for which relevant data are available.

Or. en

Amendment 2630

Letizia Moratti, Peter Agius, Massimiliano Salini, Flavio Tosi

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–ga (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
In Article 12, paragraph 3-ga is inserted:
The Commission shall adopt the implementing decision within twelve months of the entry into force of a linking agreement concluded pursuant to Article 25, so that the recognition of third-country storage follows linkage without undue delay. Pending that decision, transitional arrangements shall ensure that emissions verified as captured and permanently stored in a third country from 2029 are not disadvantaged.

Or. en

Amendment 2631

Dolors Montserrat, Nicolás Pascual de la Parte, Rosa Estaràs Ferragut, Adrián Vázquez Lázara, Esteban González Pons, Juan Ignacio Zoido Álvarez, Carmen Crespo Díaz, Susana Solís Pérez, Esther Herranz García, Pablo Arias Echeverría, Fernando Navarrete Rojas, Raúl de la Hoz Quintano, Gabriel Mato, Isabel Benjumea Benjumea, Elena Nevado del Campo, Alma Ezcurra Almansa, Pilar del Castillo Vera, Maravillas Abadía Jover, Borja Giménez Larraz, Antonio López-Istúriz White, Javier Zarzalejos, Francisco José Millán Mon

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–gb (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the request of a Member State, provide by means of an implementing act that Member States are to consider the requirements set out in those provisions to be satisfied and that they are to take no action against shipping companies in respect of emissions released from voyages performed by passenger ships, other than cruise passenger ships, and by ro-pax ships, between a port of an island under the jurisdiction of that requesting Member State, with no road or rail link with the mainland and with a population of fewer than 200 000 permanent residents according to the latest best data available in 2022, or the cities of Ceuta and Melilla and a port under the jurisdiction of that same Member State, and from the activities, within a port, of such ships in relation to such voyages.

Or. en

Amendment 2632

Ondřej Knotek, Jana Nagyová, Antonín Staněk, Roman Haider

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Where the shipping companies benefit from the derogation referred to in the first subparagraph, they may surrender fewer allowances than their verified emissions in respect of emissions released from the activities within a port in relation to the voyages referred to in the first subparagraph.deleted

Or. en

Amendment 2633

Sakis Arnaoutoglou, Nikos Papandreou, Yannis Maniatis, Nikolas Farantouris

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Where the shipping companies benefit from the derogation referred to in the first subparagraph, they may surrender fewer allowances than their verified emissions in respect of emissions released from the activities within a port in relation to the voyages referred to in the first subparagraph.deleted

Or. en

Justification

Article 3ga(2) already provides safeguards against circumvention through neighbouring container transhipment ports. A further derogation limited to large containerships risks differentiated treatment between shipping segments and weakening the level playing field. Port competitiveness should instead be supported through effective anti-evasion measures, infrastructure investment and progress towards a global IMO framework.

Amendment 2634

Silvia Sardone, Mathilde Androuët, Roman Haider, Marie-Luce Brasier-Clain, Susanna Ceccardi, Barbara Bonte

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Where the shipping companies benefit from the derogation referred to in the first subparagraph, they may surrender fewer allowances than their verified emissions in respect of emissions released from the activities within a port in relation to the voyages referred to in the first subparagraph.deleted

Or. en

Amendment 2635

Letizia Moratti, Peter Agius, Massimiliano Salini, Flavio Tosi

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Where the shipping companies benefit from the derogation referred to in the first subparagraph, they may surrender fewer allowances than their verified emissions in respect of emissions released from the activities within a port in relation to the voyages referred to in the first subparagraph.deleted

Or. en

Amendment 2636

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Where the shipping companies benefit from the derogation referred to in the first subparagraph, they may surrender fewer allowances than their verified emissions in respect of emissions released from the activities within a port in relation to the voyages referred to in the first subparagraph.deleted

Or. en

Amendment 2637

Thomas Bajada, Daniel Attard, Alex Agius Saliba

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–ga (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies operating container ships, ro-ro cargo ships, ro-pax ships or feeder services exclusively between the same port of call under the jurisdiction of a Member State and the same port of call under the jurisdiction of an island Member State dependent on maritime transport for the import of goods, and calling at no other port of call between those two ports, shall surrender, in respect of each voyage, a number of allowances calculated by multiplying the verified emissions of that voyage by the ratio between the volume of cargo actually carried, measured in twenty-foot equivalent units or lane metres, and the certified cargo capacity of the ship. This calculation shall apply to each leg of the voyage individually, irrespective of the direction in which cargo is predominantly carried.

Or. en

Justification

Island Member States suffer from a trade imbalance due to their dependency on the importation of raw materials and essential goods for their livelihood, and their lack of potential production intended for export. In general, ships arrive full and return largely empty, so charging each voyage at full rate regardless of cargo carried, passes decarbonisation costs on to the cost of living. This amendment charges ETS by the cargo actually carried on each leg of a single fixed lifeline route, using verified emissions and certified capacity. It follows the ratio-based structure of the Commission's own paragraph 3-g, also applied to a narrowly defined route type.

Amendment 2638

Silvia Sardone, Mathilde Androuët, Roman Haider, Marie-Luce Brasier-Clain, Susanna Ceccardi, Barbara Bonte

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership.deleted

Or. en

Amendment 2639

Ondřej Knotek, Jana Nagyová, Antonín Staněk, Roman Haider

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership.deleted

Or. en

Amendment 2640

Sakis Arnaoutoglou, Nikos Papandreou, Yannis Maniatis, Nikolas Farantouris

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership.deleted

Or. en

Justification

Article 3ga(2) already provides safeguards against circumvention through neighbouring container transhipment ports. A further derogation limited to large containerships risks differentiated treatment between shipping segments and weakening the level playing field. Port competitiveness should instead be supported through effective anti-evasion measures, infrastructure investment and progress towards a global IMO framework.

Amendment 2641

Letizia Moratti, Peter Agius, Massimiliano Salini, Flavio Tosi

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership.deleted

Or. en

Amendment 2642

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership.deleted

Or. en

Amendment 2643

Jens Gieseke, Ralf Seekatz, Sophia Kircher, Norbert Herhammer, Gheorghe Falcă, Andrea Wechsler

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership.By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies shall not surrender allowances in respect of emissions released from voyages from a port of call outside the jurisdiction of a Member State to a port of call under the jurisdiction of a Member State, and from a port of call under the jurisdiction of a Member State to a port of call outside the jurisdiction of a Member State, if performed by containerships of 8 000 TEU and above, if the distance of the voyage exceeds 300 nautical miles and either: (a) The port located under the jurisdiction of a Member State is in the list of major Union container transhipment ports established pursuant to paragraph 2; or (b) at least 50 % of the containers, measured in twenty-foot equivalent units, loaded and unloaded during the port call are transhipped containers, as evidenced by the information contained in the ship cargo manifest. For the purpose of this paragraph, a container shall be considered to be transhipped where, at a port of call in the course of its transport to its final destination, it is unloaded from a ship for the purpose of being loaded onto another ship. Where fewer allowances are surrendered compared to the verified emissions, once the difference between verified emissions and allowances surrendered has been established in respect of each year, an amount of allowances corresponding to that difference shall be cancelled rather than auctioned pursuant to Article 10. 2.⁠ ⁠The Commission shall, by means of implementing acts, establish a list of major Union container transhipment ports and update that list by 31 December every two years thereafter. Those implementing acts shall list a port as a major Union container transhipment port where the share of transhipment of containers, measured in twenty-foot equivalent units, exceeds 65 % of the total container traffic of that port during the most recent twelve-month period for which relevant data are available.

Or. en

Amendment 2644

Wouter Beke, Liesbet Sommen, Pascal Arimont

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership.The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership. The same principle regarding the amount of allowances shall apply to the subsequent outbound voyage bringing the container from the port under the jurisdiction of Member State to a port outside the jurisdiction of a member state.

Or. en

Justification

The outbound leg should also be covered, as supply chain operators consider the total cost of transporting a container across all legs of the journey. Information in the re-export notification (REN) submitted by the shipping line could be used to identify the subsequent leg and facilitate implementation.

Amendment 2645

Javi López, César Luena, Rosa Serrano Sierra, Alicia Homs Ginel, Juan Fernando López Aguilar, Lina Gálvez, Nicolás González Casares, Leire Pajín, Elena Sancho Murillo

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership.The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall correspond to the percentage of those emissions for which allowances must be surrendered, as determined by applying the factor set out in the following table:
Distance of the voyage --- Percentage of emissions for which allowances shall be surrendered
More than 3 000 and up to 4 000 nautical miles --- 45 %
More than 4 000 and up to 5 000 nautical miles --- 40 %
More than 5 000 and up to 6 500 nautical miles --- 35 %
More than 6 500 and up to 9 700 nautical miles --- 25 %
More than 9 700 nautical miles --- 15 %.

Or. en

Justification

The Commission's measure only covers inbound voyages by containerships of 10 000 TEU and above and does not address the splitting of direct deep-sea services through non-EU hubs. These amendments extend the derogation to all containerships on voyages exceeding 3 000 nautical miles, in both directions, with surrender percentages that decrease with distance. The bands are based on a route-level analysis of 74 deep-sea container services and remove the incentive to split routes. They rely only on data verified under the MRV Regulation and complement the rules on transhipment ports.

Amendment 2646

Matteo Ricci

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership.The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph shall correspond to the percentage of those emissions for which allowances must be surrendered, as determined by applying the factor set out in the following table:
Distance of voyage Percentage of emissions for which allowances must be surrendered
- Less then 3 000 nautical miles 50 %
- More than 3 000 and up to 4 000 nautical miles 45 %
- More than 4 000 and up to 5 000 nautical miles 40 %
- More than 5 000 and up to 6 500 nautical miles 35 %
- More than 6 500 and up to 9 700 nautical miles 25 %
- More than 9 700 nautical miles 15 %.

Or. en

Amendment 2647

Annalisa Corrado, Brando Benifei

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, unloaded at the port of call under the jurisdiction of a Member State for the sole purpose of being loaded onto another ship, performing a voyage between the same port of call and a port of call outside the jurisdiction of a Member State, compared to the total number of containers unloaded by the containership.The amount of allowances to be surrendered in respect of the containership referred to in the first subparagraph at the port of call under the jurisdiction of a Member State, shall be reduced on the basis of the share of containers, measured in twenty-foot equivalent units, loaded and unloaded at the port of call under the jurisdiction of a Member State, where both the port from which those containers arrived and their final port of destination are outside the jurisdiction of a Member State, compared to the total number of containers loaded and unloaded by the containership at that port call.

Or. en

Amendment 2648

André Franqueira Rodrigues

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 3a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The same principle regarding the amount of allowances shall apply to the subsequent outbound voyage bringing the container from the port under the jurisdiction of Member State to a port outside the jurisdiction of a member state.

Or. en

Justification

The outbound voyage should be covered as supply chain actors assess the entirety of the costs linked to the transport of the container.

Amendment 2649

Sakis Arnaoutoglou, Nikos Papandreou, Yannis Maniatis, Nikolas Farantouris

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 4

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Where fewer allowances are surrendered compared to the verified emissions, once the difference between verified emissions and allowances surrendered has been established in respect of each year, an amount of allowances corresponding to that difference shall be cancelled rather than auctioned pursuant to Article 10.deleted

Or. en

Justification

Article 3ga(2) already provides safeguards against circumvention through neighbouring container transhipment ports. A further derogation limited to large containerships risks differentiated treatment between shipping segments and weakening the level playing field. Port competitiveness should instead be supported through effective anti-evasion measures, infrastructure investment and progress towards a global IMO framework.

Amendment 2650

Ondřej Knotek, Jana Nagyová, Antonín Staněk

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 4

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Where fewer allowances are surrendered compared to the verified emissions, once the difference between verified emissions and allowances surrendered has been established in respect of each year, an amount of allowances corresponding to that difference shall be cancelled rather than auctioned pursuant to Article 10.Where fewer allowances are surrendered compared to the verified emissions, once the difference between verified emissions and allowances surrendered has been established in respect of each year, an amount of allowances corresponding to that difference shall be cancelled rather than auctioned pursuant to Article 10.
The Commission shall, by means of implementing acts, establish a list of major Union container transhipment ports and update that list by 31 December every two years thereafter. Those implementing acts shall list a port as a major Union container transhipment port where the share of transhipment of containers, measured in twenty-foot equivalent units, exceeds 65 % of the total container traffic of that port during the most recent twelve-month period for which relevant data are available.

Or. en

Justification

Unlike gateway cargo, transshipment traffic is not tied to a port’s hinterland or local production and consumption. Transshipment hubs serving the same international networks are therefore interchangeable, regulatory cost differentials can prompt shipping lines to redirect vessel rotations, terminal investment, and hub calls toward more competitive non-EU ports.On deep-sea routes, relocating a transshipment call outside the EU allows non-EU-bound cargo to avoid voyage segments subject to EU ETS costs, while EU-bound cargo can still reach EU ports through feeder services.

Amendment 2651

Letizia Moratti, Peter Agius, Massimiliano Salini, Flavio Tosi

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–g – subparagraph 4a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
⁠The Commission shall, by means of implementing acts, establish a list of major Union container transhipment ports and update that list by 31 December every two years thereafter. Those implementing acts shall list a port as a major Union container transhipment port where the share of transhipment of containers, measured in twenty-foot equivalent units, exceeds 65 % of the total container traffic of that port during the most recent twelve-month period for which relevant data are available.

Or. en

Amendment 2652

Marie-Luce Brasier-Clain, Anne-Sophie Frigout, Mathilde Androuët, Valérie Deloge, Silvia Sardone, Barbara Bonte, Ondřej Knotek, Jana Nagyová

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-f. On routes subject to the offsetting requirement calculated pursuant to paragraph 6 of this Article, the reduction of the surrender obligation shall correspond to the aircraft operator’s offsetting requirement, as calculated pursuant to paragraph 6 of this Article, in proportion to the extent the route is covered by the surrender obligation, multiplied by the ratio between the average price of allowances and the average price of credits eligible under Article 11a. The ratio shall be calculated using best available price indices for credits published in the carbon market report published pursuant to Article 10(5).deleted

Or. fr

Amendment 2653

Seán Kelly

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-f. On routes subject to the offsetting requirement calculated pursuant to paragraph 6 of this Article, the reduction of the surrender obligation shall correspond to the aircraft operator’s offsetting requirement, as calculated pursuant to paragraph 6 of this Article, in proportion to the extent the route is covered by the surrender obligation, multiplied by the ratio between the average price of allowances and the average price of credits eligible under Article 11a. The ratio shall be calculated using best available price indices for credits published in the carbon market report published pursuant to Article 10(5).deleted

Or. en

Amendment 2654

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-f. On routes subject to the offsetting requirement calculated pursuant to paragraph 6 of this Article, the reduction of the surrender obligation shall correspond to the aircraft operator’s offsetting requirement, as calculated pursuant to paragraph 6 of this Article, in proportion to the extent the route is covered by the surrender obligation, multiplied by the ratio between the average price of allowances and the average price of credits eligible under Article 11a. The ratio shall be calculated using best available price indices for credits published in the carbon market report published pursuant to Article 10(5).deleted

Or. en

Amendment 2655

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-f. On routes subject to the offsetting requirement calculated pursuant to paragraph 6 of this Article, the reduction of the surrender obligation shall correspond to the aircraft operator’s offsetting requirement, as calculated pursuant to paragraph 6 of this Article, in proportion to the extent the route is covered by the surrender obligation, multiplied by the ratio between the average price of allowances and the average price of credits eligible under Article 11a. The ratio shall be calculated using best available price indices for credits published in the carbon market report published pursuant to Article 10(5).deleted

Or. en

Amendment 2656

Jens Gieseke, Ralf Seekatz, Sophia Kircher, Norbert Herhammer, Gheorghe Falcă, Andrea Wechsler, Borja Giménez Larraz, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-f. On routes subject to the offsetting requirement calculated pursuant to paragraph 6 of this Article, the reduction of the surrender obligation shall correspond to the aircraft operator’s offsetting requirement, as calculated pursuant to paragraph 6 of this Article, in proportion to the extent the route is covered by the surrender obligation, multiplied by the ratio between the average price of allowances and the average price of credits eligible under Article 11a. The ratio shall be calculated using best available price indices for credits published in the carbon market report published pursuant to Article 10(5).deleted

Or. en

Amendment 2657

Adam Jarubas, Andrzej Halicki, Riho Terras, Ewa Kopacz, Elżbieta Katarzyna Łukacijewska, Hanna Gronkiewicz-Waltz, Bartosz Arłukowicz

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-f. On routes subject to the offsetting requirement calculated pursuant to paragraph 6 of this Article, the reduction of the surrender obligation shall correspond to the aircraft operator’s offsetting requirement, as calculated pursuant to paragraph 6 of this Article, in proportion to the extent the route is covered by the surrender obligation, multiplied by the ratio between the average price of allowances and the average price of credits eligible under Article 11a. The ratio shall be calculated using best available price indices for credits published in the carbon market report published pursuant to Article 10(5).deleted
(This amendment applies to whole paragraph 3f including all its subparagraphs)

Or. en

Justification

Without prejudice to EU ETS application to intra EU flights, CORSIA should remain the only global market mechanism in order to maintain competitiveness of EU airline operators.

Amendment 2658

Andreas Glück, Jan-Christoph Oetjen, Jeannette Baljeu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3-f. On routes subject to the offsetting requirement calculated pursuant to paragraph 6 of this Article, the reduction of the surrender obligation shall correspond to the aircraft operator’s offsetting requirement, as calculated pursuant to paragraph 6 of this Article, in proportion to the extent the route is covered by the surrender obligation, multiplied by the ratio between the average price of allowances and the average price of credits eligible under Article 11a. The ratio shall be calculated using best available price indices for credits published in the carbon market report published pursuant to Article 10(5).3-f. On routes subject to the offsetting requirement calculated pursuant to paragraph 6 of this Article, the reduction of the surrender obligation shall correspond to the aircraft operator’s offsetting requirement, as calculated pursuant to paragraph 6 of this Article, in proportion to the extent the route is covered by the surrender obligation.

Or. en

Justification

The Commission proposal covers all the emissions within the ETS scope. For routes covered by both schemes, the CORSIA costs for the emission units can be deducted from the total carbon cost of ETS. However, the CORSIA costs related to the purchase of SAF cannot be deducted. This approach is problematic, because a cost-based deduction does not treat the two CORSIA compliance options equally and may therefore promote the use of emission units over SAF. Second, it contradicts the Chicago Convention, whereby the same emissions should not be charged twice.

Amendment 2659

Niels Flemming Hansen

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 1a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
For the purposes of the second sentence of the first subparagraph, a price index shall be considered to be among the best available where it is publicly available, is published at regular intervals and is determined on the basis of transactions in credits eligible under Article 11a concluded during the period to which the calculation relates. Price indices determined on the basis of estimates, quotes or assessments shall be used only where no price index fulfilling the conditions set out in the first sentence of this subparagraph is available. The Commission shall set out in the report referred to in Article 10(5) the price indices used for the purposes of this paragraph and the reasons for their selection.

Or. en

Justification

The ratio in Article 12(3-f), which converts a CORSIA credit into an equivalent number of EU allowances, rests on an allowance price already established and published in the carbon market report, while leaving the credit price unspecified. Both sides of the calculation should rest on price information of comparable reliability. Regulation (EU) 2016/1011 already establishes what makes a price reliable enough to determine amounts payable: input data must be capable of representing accurately the market it purports to measure, must be verifiable and must be drawn from transactions where transactions are available, with estimates, quotes and judgement reserved for where they are not. The same principle should apply here, and the Commission should report which price index it has used and the reasons for its choice.

Amendment 2660

Jens Gieseke, Ralf Seekatz, Sophia Kircher, Norbert Herhammer, Gheorghe Falcă, Andrea Wechsler, Borja Giménez Larraz, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
In case the cancelation of units pursuant to paragraph 9 does not take place for a certain period described in that paragraph, allowances shall be surrendered for the deductions that took already place for the years in that period, no later than 30 September of the year following the date of the notification of the final offsetting obligation.deleted

Or. en

Amendment 2661

Seán Kelly

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
In case the cancelation of units pursuant to paragraph 9 does not take place for a certain period described in that paragraph, allowances shall be surrendered for the deductions that took already place for the years in that period, no later than 30 September of the year following the date of the notification of the final offsetting obligation.deleted

Or. en

Amendment 2662

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
In case the cancelation of units pursuant to paragraph 9 does not take place for a certain period described in that paragraph, allowances shall be surrendered for the deductions that took already place for the years in that period, no later than 30 September of the year following the date of the notification of the final offsetting obligation.deleted

Or. en

Amendment 2663

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
In case the cancelation of units pursuant to paragraph 9 does not take place for a certain period described in that paragraph, allowances shall be surrendered for the deductions that took already place for the years in that period, no later than 30 September of the year following the date of the notification of the final offsetting obligation.deleted

Or. en

Amendment 2664

Seán Kelly

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
In case the final offsetting requirement pursuant to paragraph 6 is not communicated to aircraft operators and the cancelation of units pursuant to paragraph 9 does not take place for a certain period described in that paragraph, allowances shall be surrendered for the deductions that took already place for the years in that period, no later than 30 September of the year following the due date of the notification of the final offsetting obligation.;deleted

Or. en

Amendment 2665

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
In case the final offsetting requirement pursuant to paragraph 6 is not communicated to aircraft operators and the cancelation of units pursuant to paragraph 9 does not take place for a certain period described in that paragraph, allowances shall be surrendered for the deductions that took already place for the years in that period, no later than 30 September of the year following the due date of the notification of the final offsetting obligation.;deleted

Or. en

Amendment 2666

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
In case the final offsetting requirement pursuant to paragraph 6 is not communicated to aircraft operators and the cancelation of units pursuant to paragraph 9 does not take place for a certain period described in that paragraph, allowances shall be surrendered for the deductions that took already place for the years in that period, no later than 30 September of the year following the due date of the notification of the final offsetting obligation.;deleted

Or. en

Amendment 2667

Jens Gieseke, Ralf Seekatz, Sophia Kircher, Norbert Herhammer, Gheorghe Falcă, Andrea Wechsler, Borja Giménez Larraz, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–f – subparagraph 3

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
In case the final offsetting requirement pursuant to paragraph 6 is not communicated to aircraft operators and the cancelation of units pursuant to paragraph 9 does not take place for a certain period described in that paragraph, allowances shall be surrendered for the deductions that took already place for the years in that period, no later than 30 September of the year following the due date of the notification of the final offsetting obligation.;deleted

Or. en

Amendment 2668

Mohammed Chahim, Peter Liese

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–fa (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
By way of derogation from point (c) of the first subparagraph of paragraph 3, for verified emissions resulting from maritime transport activities performed by motorised private yachts as defined in Article 3, point (ap), shipping companies or operators shall surrender a number of allowances that is equal to its total emissions during the preceding calendar year.

Or. en

Amendment 2669

Pascal Canfin, Grégory Allione

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–fa (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
An obligation to surrender allowances shall not arise in respect of emissions released until 31 December 2040 from voyages between a port located in an outermost region of a Member State and a port located in another part of the EEA, nor in respect of emissions released from activities within a port of those ships in relation to such voyages.

Or. en

Justification

Exempts voyages between outermost regions and other EEA ports from the obligation to surrender allowances until 2040.

Amendment 2670

Annalisa Corrado

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point ii

Directive 2003/87/EC

Article 12 – paragraph 3–fa (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
1) By way of derogation from point (c) of the first subparagraph of paragraph 3, for verified emissions resulting from maritime transport activities performed by motorised private yachts as defined in Article 3, point (ap), shipping companies or operators shall surrender a number of allowances that is equal to its total emissions during the preceding calendar year.

Or. en

Amendment 2671

Marie-Luce Brasier-Clain, Anne-Sophie Frigout, Mathilde Androuët, Valérie Deloge, Silvia Sardone, Ondřej Knotek, Jana Nagyová

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point aa (new)

Directive 2003/87/EC

Article 12 – paragraph 3a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
By way of derogation from paragraph 3, first subparagraph, point (c), the obligation to surrender allowances shall not apply to emissions from ships performing voyages between a port located in an outermost region of a Member State and a port located in the same Member State, including voyages between ports within an outermost region and voyages between ports situated in the outermost regions of the same Member State, or to emissions from the activities carried out by these ships inside a port in relation to such voyages.
This derogation shall apply irrespective of the ship’s gross tonnage and shall cover, in particular, ships below 5 000 gross tonnage but not below 400 gross tonnage falling within the scope of this Directive.

Or. fr

Amendment 2672

Ondřej Knotek, Jana Nagyová, Antonín Staněk

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a a (new)

Directive 2003/87/EC

Article 12 – paragraph 3a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(aa) By way of derogation from paragraph 3, first subparagraph, point (a), the operator of an installation shall not be required to surrender allowances in respect of emissions attributable to eligible exported output. For the purposes of this paragraph, ‘eligible exported output’ means output produced by an installation covered by this Directive which is demonstrated to have been exported from the customs territory of the Union, whether directly or following processing, transformation or distribution within the Union. The emissions attributable to eligible exported output shall be determined on the basis of the quantity of products effectively exported and, where applicable, the relevant product benchmark. Where Union-produced output has undergone processing or transformation before leaving the customs territory of the Union, the emissions for which the surrender obligation does not arise shall be limited to the emissions attributable to the Union-produced input. The same emissions attributable to eligible exported output shall not be taken into account more than once for the purposes of carbon-leakage protection under Union law. The Commission shall adopt implementing acts specifying the detailed rules for determining and verifying eligible exported output and the emissions attributable to such output, including the use of production, sales, customs and other relevant supply-chain data, the application of relevant product benchmarks where applicable, and the measures necessary to prevent double counting and circumvention. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 22a(2). The implementing acts shall ensure that the application of this paragraph is consistent with the Union’s international obligations, including those arising under the rules of the World Trade Organization.

Or. en

Justification

Union producers exporting to third-country markets bear the EU ETS carbon cost without the protection provided by CBAM. The amendment therefore adjusts the surrender obligation for emissions attributable to effectively exported output, reducing the risk of carbon leakage while preserving the existing ETS monitoring, verification and benchmarking framework

Amendment 2673

Matteo Ricci

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a a (new)

Directive 2003/87/EC

Article 12 – paragraph 3a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(aa) By way of derogation from paragraph 3, first subparagraph, point (c), an obligation to surrender allowances shall not arise in respect of emissions released from voyages performed by passenger ships and ro-pax ships between a port located in an island region of a Member State facing structural and socio-economic disadvantages linked to insularity and a port located in the mainland territory of the same Member State, including voyages between ports located within the same island region, and from the activities, within a port, of such ships in relation to such voyages. For the purposes of this paragraph, the identification of the island regions concerned shall take into account, in particular, their structural dependence on maritime transport for ensuring territorial continuity, the absence of equivalent transport alternatives, the impact of transport costs on competitiveness and economic and social cohesion, and the structural disadvantages linked to insularity, in accordance with Article 174 TFEU.

Or. en

Amendment 2674

Dimitris Tsiodras

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a a (new)

Directive 2003/87/EC

Article 12 – paragraph 3a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3a. By way of derogation from paragraph 3, first subparagraph, point (c), an obligation to surrender allowances shall not arise in respect of emissions directly attributable to activities or events which are not related to the commercial transport activity of the ship, including, inter alia, emissions arising from regulatory, classification or maintenance requirements, dry-docking, and associated positioning and repositioning voyages.

Or. en

Justification

This amendment establishes the substantive ETS derogation. The reference to “including, inter alia” makesclear that dry-docking and the other listed cases are examples and do not exhaust the scope of the principle.

Amendment 2675

Jorge Buxadé Villalba, Roman Haider, Antonín Staněk, Silvia Sardone, Marie-Luce Brasier-Clain, Mathilde Androuët, Anne-Sophie Frigout

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a – point iia (new)

Directive 2003/87/EC

Article 12 – paragraph 3 – point a

Amendment: Present text and Amendment
Present textAmendment
(aa) point (a) is amended as follows:
(a) the operator of each installation surrenders a number of allowances that is equal to the total emissions from that installation during the preceding calendar year, as verified in accordance with Article 15;(a) the operator of each installation surrenders a number of allowances that is equal to the total emissions from that installation during the preceding calendar year, as verified in accordance with Article 15; where an installation’s total emissions surpass its allowances for a given year, it will be exempt from surrendering allowances for the emissions caused by its products exported to third countries without a comparative emissions’ pricing mechanism;

Or. en

Amendment 2676

Dimitris Tsiodras

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point a b (new)

Directive 2003/87/EC

Article 12 – paragraph 3b (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3b. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions in respect of emissions directly attributable to a deviation from a voyage or undertake additional navigation for the purpose of rendering assistance to persons in distress at sea, or to participate in search and rescue activities, pursuant to applicable obligations under international law. The emissions referred to in the first subparagraph shall continue to be monitored and reported in accordance with Regulation (EU) 2015/757 and shall be separately identified, documented and verified for the purposes of applying this derogation.

Or. en

Justification

Shipping companies may be required under international law to deviate from a planned voyage in order torender assistance to persons in distress at sea or to participate in search and rescue activities. Additionalemissions resulting directly from such activities do not arise from the commercial operation or optimisation ofthe voyage or decisions but from compliance with obligations concerning the safety of human life at sea.Shipping companies should therefore not incur an EU ETS surrender obligation for emissions from activitiesundertaken for the protection of human life that do not constitute commercial maritime transport activity.

Amendment 2677

Robert Gabel

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;deleted

Or. en

Justification

Maritime derogations should expire on 31 December 2030. Extending them would postpone the full carbon-price incentive while dedicated support for cleaner propulsion is being introduced. Connectivity and affordability should be addressed through targeted transition support rather than prolonged exemptions from the surrender obligation. The existing cancellation rule accompanying the ice-class derogation is unaffected by deletion of this amending provision.

Amendment 2678

Thomas Bajada, Alex Agius Saliba, Daniel Attard, Yannis Maniatis, Sakis Arnaoutoglou

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-d, 3-c and 3-b, the date of '31 December 2030' is replaced by '31 December 2040', and in paragraph 3-e, the date of '31 December 2030' is replaced by '31 December 2035';

Or. en

Justification

Services under paragraphs 3-b, 3-c and 3-d are lifelines for small islands, outermost regions and public service links, given their permanent structural constraints, their dependency on critical maritime connectivity and the lack of any road or rail alternative. As the fleets and ports serving them remain constrained by infrastructure and investment needs, this extension to 2040 avoids passing ETS costs on to residents, public budgets and essential supplies.

Amendment 2679

Galato Alexandraki, Emmanouil Fragkos

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-e, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’; in paragraph 3-d, the date ‘of 31 December 2030’ is replaced by ‘31 December 2040’;

Or. el

Amendment 2680

Sophie Wilmès, Olivier Chastel, Benoit Cassart, Andreas Glück

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraph 3-e, the date of ‘31 December 2030’ is replaced by ‘31 December 2040’, and n paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;

Or. en

Amendment 2681

Heléne Fritzon

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraph 3-e, the date of ‘31 December 2030’ is replaced by ‘31 December 2040’; in paragraphs 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;

Or. en

Amendment 2682

Nora Mebarek, Christophe Clergeau

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-e, 3-d and 3-c, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’; in paragraph 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2040’;

Or. en

Amendment 2683

Ondřej Knotek, Jana Nagyová, Antonín Staněk

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-e, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’; in paragraph 3-d, the date "31 December 2030" is replaced by "31 December 2040".

Or. en

Justification

Minor islands depend on regular maritime connections and often have limited alternatives for moving passengers and goods. The availability of suitable fuels, port infrastructure and replacement vessels may constrain the pace at which these services can decarbonize.Extending the existing derogation to 31 December 2040 would provide a longer planning horizon for essential services and related investment. The existing eligibility conditions and coverage of associated port activities would remain unchanged.

Amendment 2684

Adam Jarubas, Riho Terras, Jüri Ratas, Ewa Kopacz, Elżbieta Katarzyna Łukacijewska, Hanna Gronkiewicz-Waltz, Bartosz Arłukowicz

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-e and 3-d the date of ‘31 December 2030’ is replaced by ‘31 December 2050; 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;

Or. en

Amendment 2685

Sakis Arnaoutoglou, Nikos Papandreou, Yannis Maniatis, Nikolas Farantouris

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2040’;

Or. en

Justification

In order for such derogations to allow for significant decarbonisation of essential connectivity, access to dedicated support of funding through the Industrial Decarbonisation Bank is necessary to gradually phase out these derogations. Furthermore, a fixed calendar extension does not address a permanent structural constraint and would require repeated legislative amendment. This introduces a reviewable, criteria-based renewal mechanism, and extends eligibility beyond purely domestic routes to reflect the permanent structural dependency that island Member States have on critical maritime connectivity.

Amendment 2686

Dolors Montserrat, Nicolás Pascual de la Parte, Rosa Estaràs Ferragut, Adrián Vázquez Lázara, Esteban González Pons, Juan Ignacio Zoido Álvarez, Carmen Crespo Díaz, Susana Solís Pérez, Esther Herranz García, Pablo Arias Echeverría, Fernando Navarrete Rojas, Raúl de la Hoz Quintano, Gabriel Mato, Isabel Benjumea Benjumea, Elena Nevado del Campo, Alma Ezcurra Almansa, Pilar del Castillo Vera, Maravillas Abadía Jover, Borja Giménez Larraz, Antonio López-Istúriz White, Javier Zarzalejos, Francisco José Millán Mon

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2045’;

Or. en

Amendment 2687

Sunčana Glavak

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3-e, 3-d, 3-c and 3-b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2040’;

Or. hr

Amendment 2688

Javi López, César Luena, Rosa Serrano Sierra, Alicia Homs Ginel, Juan Fernando López Aguilar, Nicolás González Casares, Leire Pajín, Elena Sancho Murillo

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2040’;

Or. en

Justification

The large-scale deployment of zero-emission solutions on vessels serving outermost regions, small islands, public service routes and ice-class ships remains constrained by infrastructure and investment needs. Limiting these derogations to 2035 does not provide sufficient predictability for operators and would reopen the debate at the next review. Extending them until 2040 ensures territorial continuity and affordable maritime connectivity, while the derogations should be gradually phased out over that period so that all sectors contribute to climate neutrality.

Amendment 2689

Dimitris Tsiodras, Eleonora Meleti, Emmanouil Kefalogiannis, Elissavet Vozemberg-Vrionidi, Fredis Beleris, Georgios Aftias, Vangelis Meimarakis, Michalis Hadjipantela, Loucas Fourlas, Letizia Moratti

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2040’;

Or. en

Justification

Τhe duration of the relevant derogations under Article 12 should be extended to provide the necessary regulatory predictability and avoid abrupt increases in compliance costs for services that are essential for island connectivity. The proposed five-year extension would provide greater regulatory certainty and sufficient time for the progressive adaptation of the relevant services, infrastructure and fleets, while ensuring the continued provision of essential maritime connectivity services to islands and other geographically disadvantaged areas.The proposed five-year extension would provide greater regulatory certainty and sufficient time for the progressive adaptation of the relevant services, infrastructure and fleets, while ensuring the continued provision of essential maritime connectivity services to islands and other geographically disadvantaged areas.

Amendment 2690

Annalisa Corrado

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;

Or. en

Amendment 2691

Emma Ytterell, Yvan Verougstraete, Anna Stürgkh, Jeannette Baljeu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;

Or. en

Amendment 2692

André Franqueira Rodrigues, Sérgio Gonçalves, Juan Fernando López Aguilar

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraphs 3-e, 3-d, and 3-c the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;

Or. en

Justification

This ammendment is part of two amendments that aim to make the derrogation applicable to outermost regions permanent.

Amendment 2693

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b

Directive 2003/87/EC

Article 12 – paragraphs 3–e, 3–d, 3–c and 3–b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) in paragraphs 3-e, 3-d, 3-c, and 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;(b) in paragraph 3-b, the date of ‘31 December 2030’ is replaced by ‘31 December 2035’;

Or. en

Justification

A stable regulatory environment should be maintained to ensure that incentives are given to short-distance passenger and ro-pax ferries to electrify, enabling lead markets for builders of full electric passenger and ro-pax ferries.

Amendment 2694

Peter Liese, Dolors Montserrat, Letizia Moratti, Peter Agius, Lídia Pereira

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b a (new)

Directive 2003/87/EC

Article 12 – paragraph 3–d

Amendment: Present text and Amendment
Present textAmendment
(ba) In Article 12, paragraph 3-d is replaced by the following:
3-d. By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the request of a Member State, provide by means of an implementing act that Member States are to consider the requirements set out in those provisions to be satisfied and that they are to take no action against shipping companies in respect of emissions released until 31 December 2030 from voyages performed by passenger ships, other than cruise passenger ships, and by ro-pax ships, between a port of an island under the jurisdiction of that requesting Member State, with no road or rail link with the mainland and with a population of fewer than 200 000 permanent residents according to the latest best data available in 2022, and a port under the jurisdiction of that same Member State, and from the activities, within a port, of such ships in relation to such voyages.3-d. 'By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the request of a Member State, provide by means of an implementing act that:
(a) No action shall be taken against shipping companies in respect of 100 % of verified emissions released until 31 December 2040 from voyages performed by passenger, ro-pax, and ro-ro cargo ships between an island with a population of fewer than 200,000 permanent residents according to the latest best data available in 2022, and the mainland of that same Member State.
(b) For voyages between the mainland of the Union and an island Member State that lacks any land borders with another Member State, or for voyages between the mainland of the Union and an island located within a NUTS level 2 region whose GDP per capita in purchasing power standards (PPS) is below 75 % of the EU-27 average, and which does not otherwise benefit from a derogation under paragraph (3b), shipping companies shall be required to surrender allowances for 50 % of their verified emissions.
(c) For the purposes of this paragraph, mainland territories or enclaves that lack permanent fixed road or rail connections to the European mainland, and are located contiguous to non-Union territories, shall be treated as islands under point (a) of this paragraph.
The Commission shall publish a list of the islands and territories referred to in the first and second subparagraphs and the ports concerned and keep that list up to date.'

Or. en

Justification

The challenges of island Member States, enclaves as well as small or less prosperous islands should be taken into account in a more targeted way. Therefore, they should be subject to exemptions lightening some of the requirements. However, in accordance with AM 70 of the Draft Report, these exemptions should be phase-out until 2040.

Amendment 2695

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b a (new)

Directive 2003/87/EC

Article 12 – paragraph 3–e

Amendment: Present text and Amendment
Present textAmendment
(ba) In Article 12, paragraph 3-e is replaced by the following:
3-e. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender 5 % fewer allowances than their verified emissions released until 31 December 2030 from ice-class ships, provided that such ships have the ice class IA or IA Super or an equivalent ice class, established based on HELCOM Recommendation 25/7.3-e. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender up to 5 % fewer allowances than their verified emissions released until 31 December 2035 from ice-class ships, provided that such ships have the ice class IA or IA Super or an equivalent ice class, established based on HELCOM Recommendation 25/7 as follows:
(a) 5 % fewer allowances than their verified emissions released until 31 December 2031;
(b) 4 % fewer allowances than their verified emissions released until 31 December 2032;
(c) 3 % fewer allowances than their verified emissions released until 31 December 2033;
(d) 2 % fewer allowances than their verified emissions released until 31 December 2034;
(e) 1 % fewer allowances than their verified emissions released until 31 December 2035;
(f) from 1 January 2036, shipping companies shall be liable to surrender allowances for 100% of their verified emissions from ice-class ships.
Where fewer allowances are surrendered compared to the verified emissions, once the difference between verified emissions and allowances surrendered has been established in respect of each year, an amount of allowances corresponding to that difference shall be cancelled rather than auctioned pursuant to Article 10.Where fewer allowances are surrendered compared to the verified emissions, once the difference between verified emissions and allowances surrendered has been established in respect of each year, an amount of allowances corresponding to that difference shall be cancelled rather than auctioned pursuant to Article 10.

Or. en

Amendment 2696

Thomas Bajada

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b a (new)

Directive 2003/87/EC

Article 12 – paragraph 3–d – subparagraph 2a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) By way of derogation from the date referred to in the first subparagraph, this paragraph shall continue to apply after 31 December 2040 to the islands and ports listed pursuant to this paragraph, after the Commission establishes a periodic, criteria-based renewal mechanism for essential island maritime connectivity services, earlier than 24 months before that date, and by means of an implementing act adopted in accordance with Article 22 a (2), in order to address the permanent geographical constraints faced by small islands.

Or. en

Justification

A fixed calendar extension does not address a permanent structural constraints of small islands, without a fixed link, road or rail. This introduces a reviewable, criteria-based renewal mechanism to establish territorial continuity and addresses the permanency of the geographical constraints, instead of repeated legislative amendments.

Amendment 2697

André Franqueira Rodrigues, Sérgio Gonçalves, Juan Fernando López Aguilar

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b a (new)

Directive 2003/87/EC

Article 12 – paragraph 3–b

Amendment: Present text and Amendment
Present textAmendment
(ba) in Article 12, paragraph 3-b is replaced by the following:
3-b. An obligation to surrender allowances shall not arise in respect of emissions released until 31 December 2030 from voyages between a port located in an outermost region of a Member State and a port located in the same Member State, including voyages between ports within an outermost region and voyages between ports in the outermost regions of the same Member State, and from the activities, within a port, of such ships in relation to such voyages.3-b. An obligation to surrender allowances shall not arise in respect of emissions released from voyages between a port located in an outermost region of a Member State and a port under the jurisdiction of any Member State, including voyages between ports within an outermost region and voyages between ports in the outermost regions, and from the activities, within a port, of such ships in relation to such voyages.

Or. en

Justification

This amendment aims to make the derogation applicable to outermost regions permanent as well as applicable to voyages between outermost regions and ports in all Member States, rather than only between outermost regions and ports in the Member State of that outermost region.

Amendment 2698

Galato Alexandraki, Emmanouil Fragkos

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b a (new)

Directive 2003/87/EC

Article 12 – paragraph 3–b – subparagraph 1a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) The application of the derogation provided for in this paragraph shall not, in itself, constitute grounds for excluding the islands, ports, shipping companies or maritime links concerned from accessing Union financial instruments supporting maritime connectivity, fleet renewal and modernisation, zero- and low-emission technologies, alternative fuels or port infrastructure.

Or. el

Amendment 2699

Nora Mebarek, Christophe Clergeau

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b a (new)

Directive 2003/87/EC

Article 12 – paragraph 3–b – subparagraph 1a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) In Article 12, paragraph 3-b, the following subparagraph is added:
‘Once the amount of emissions not subject to a surrender obligation under this paragraph has been established in respect of each year, a corresponding amount of allowances shall be cancelled rather than auctioned pursuant to Article 10.’;

Or. en

Amendment 2700

Letizia Moratti, Dimitris Tsiodras, Massimiliano Salini, Flavio Tosi

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b a (new)

Directive 2003/87/EC

Article 12 – paragraph 3–d

Amendment: Present text and Amendment
Present textAmendment
(ba) In Article 12, paragraph 3-d is replaced by the following:
By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the request of a Member State, provide by means of an implementing act that Member States are to consider the requirements set out in those provisions to be satisfied and that they are to take no action against shipping companies in respect of emissions released until 31 December 2030 from voyages performed by passenger ships, other than cruise passenger ships, and by ro-pax ships, between a port of an island under the jurisdiction of that requesting Member State, with no road or rail link with the mainland and with a population of fewer than 200 000 permanent residents according to the latest best data available in 2022, and a port under the jurisdiction of that same Member State, and from the activities, within a port, of such ships in relation to such voyages."By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the request of a Member State, provide by means of an implementing act that Member States are to consider the requirements set out in those provisions to be satisfied and that they are to take no action against shipping companies in respect of emissions released until 31 December 2035 from voyages performed by passenger ships, other than cruise passenger ships, and by ro-pax ships, between a port of an island under the jurisdiction of that requesting Member State, with no road or rail link with the mainland and either with a population of fewer than 200 000 permanent residents according to the latest best data available in 2022, or when the regional GDP per capita of the NUTS level 2 region in which that island is situated, measured in purchasing power standards (PPS), is below 75 % of the EU-27 average, and a port under the jurisdiction of that same Member State, and from the activities, within a port, of such ships in relation to such voyages.

Or. en

(02003L0087-20240301)

Amendment 2701

Javi López, César Luena, Rosa Serrano Sierra, Alicia Homs Ginel, Juan Fernando López Aguilar, Nicolás González Casares, Leire Pajín, Elena Sancho Murillo

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b a (new)

Directive 2003/87/EC

Article 12 – paragraph 3–d

Amendment: Present text and Amendment
Present textAmendment
(ba) In Article 12, paragraph 3-d is replaced by the following:
3-d. By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the request of a Member State, provide by means of an implementing act that Member States are to consider the requirements set out in those provisions to be satisfied and that they are to take no action against shipping companies in respect of emissions released until 31 December 2030 from voyages performed by passenger ships, other than cruise passenger ships, and by ro-pax ships, between a port of an island under the jurisdiction of that requesting Member State, with no road or rail link with the mainland and with a population of fewer than 200 000 permanent residents according to the latest best data available in 2022, and a port under the jurisdiction of that same Member State, and from the activities, within a port, of such ships in relation to such voyages."3-d. By way of derogation from paragraph 3, first subparagraph, point (c), of this Article and Article 16, the Commission shall, at the request of a Member State, provide by means of an implementing act that Member States are to consider the requirements set out in those provisions to be satisfied and that they are to take no action against shipping companies in respect of emissions released until 31 December 2040 from voyages performed by passenger ships, other than cruise passenger ships, and by ro-pax ships, between a port of an island under the jurisdiction of that requesting Member State, with no road or rail link with the mainland and with a population of fewer than 200 000 permanent residents according to the latest best data available in 2022, and a port under the jurisdiction of that same Member State, and from the activities, within a port, of such ships in relation to such voyages.
For the purposes of the application of this paragraph, the cities of Ceuta and Melilla shall be considered as ports of call located on an island.
The Commission shall publish a list of the islands referred to in the first subparagraph and the ports concerned and keep that list up to date.The Commission shall publish a list of the islands referred to in the first subparagraph and the ports concerned and keep that list up to date.

Or. en

(02003L0087-20240301)

Justification

Ceuta and Melilla have no land link with mainland Spain, making their maritime connectivity comparable to that of islands. EU law already treats them as island ports for maritime cabotage (Regulation (EEC) No 3577/92, Article 2(1)) and FuelEU Maritime (Regulation (EU) 2023/1805, Article 2(6)). Applying the same treatment under Article 12(3-d) ensures consistency between the EU ETS, FuelEU Maritime and the EU framework on maritime cabotage.

Amendment 2702

Emma Ytterell, Yvan Verougstraete, Anna Stürgkh, Jeannette Baljeu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b a (new)

Directive 2003/87/EC

Article 12 – paragraph 3–e

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) in paragraph 3-e the date of ‘31 December 2030’ is replaced by ‘31 December 2040’;

Or. en

Justification

Prolongs the derogation for ice-class ships until 2040.

Amendment 2703

Jens Gieseke, Ralf Seekatz, Sophia Kircher, Norbert Herhammer, Gheorghe Falcă, Andrea Wechsler, Borja Giménez Larraz, Isabelle Le Callennec

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b a (new)

Directive 2003/87/EC

Article 12 – paragraph 3-e – subparagraph 1

Amendment: Present text and Amendment
Present textAmendment
(ba) paragraph 3-e, subparagraph 1 is replaced by the following,
3-e. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender 5 % fewer allowances than their verified emissions released until 31 December 2030 from ice-class ships, provided that such ships have the ice class IA or IA Super or an equivalent ice class, established based on HELCOM Recommendation 25/7.3-e. By way of derogation from paragraph 3, first subparagraph, point (c), shipping companies may surrender fewer allowances than their verified emissions released from ships sailing in ice conditions, provided that those ships have the ice class IC, IB, IA or IA Super, or an equivalent ice class established based on HELCOM Recommendation 25/7, or a Polar Class from PC1 to PC5. The reduction in the number of allowances to be surrendered shall correspond exclusively to the additional emissions resulting from sailing in ice conditions. Those additional emissions shall be calculated as the difference between the emissions released when sailing in ice conditions and the emissions that the ship would have released over the same distance under open-water conditions. Such emissions corresponding to open-water conditions shall be determined on the basis of the ship’s greenhouse gas emissions and the distance travelled in open-water conditions during the same reporting year, in accordance with Regulation (EU) 2015/757. The derogation under this paragraph may be applied independently of, or in combination with, the derogation provided for in paragraph 3-e, where applicable. Where both derogations are applied in respect of the same ship for a given reporting year, the reduction in the number of allowances to be surrendered under this paragraph shall be adjusted to reflect the extent to which paragraph 3-e has already reduced the number of allowances to be surrendered in respect of the additional emissions resulting from sailing in ice conditions.

Or. en

Amendment 2704

Peter Liese, Dolors Montserrat, Letizia Moratti, Peter Agius, Lídia Pereira

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b b (new)

Directive 2003/87/EC

Article 12 – paragraph 3–ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(bb) In Article 12, paragraph 3-b, the following paragraph is inserted:
‘3-ba By way of derogation from paragraphs 3-d, 3-c, and 3-b of this Article, as of 2034, shipping companies that are exempted under those provisions shall be liable to surrender an amount of the share of exempted allowances according to the following schedule:
(a) 14,3 % of verified emissions reported for 2034 that would be subject to surrender requirements in accordance with Article 12;
(b) 28,6 % of verified emissions reported for 2035 that would be subject to surrender requirements in accordance with Article 12;
(c) 42,9 % of verified emissions reported for 2036 that would be subject to surrender requirements in accordance with Article 12;
(d) 57,2 % of verified emissions reported for 2037 that would be subject to surrender requirements in accordance with Article 12;
(e) 71,5 % of verified emissions reported for 2038 that would be subject to surrender requirements in accordance with Article 12;
(f) 85,8 % of verified emissions reported for 2039 that would be subject to surrender requirements in accordance with Article 12;
(g) 100 % of verified emissions reported for 2040 and each year thereafter in accordance with Article 12.’;

Or. en

Justification

The challenges of island Member States, enclaves as well as small or less prosperous islands should be taken into account in a more targeted way. Therefore, they should be subject to exemptions lightening some of the requirements. However, in accordance with AM 70 of the Draft Report, these exemptions should be phase-out until 2040.

Amendment 2705

Sérgio Humberto, Paulo do Nascimento Cabral, Paulo Cunha, Lídia Pereira

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point b a (new)

Directive 2003/87/EC

Article 12 – paragraph 3-ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(1a) In Article 12, the following paragraph is inserted after paragraph 3-b:
3-ba. The obligations to surrender allowances under this Article shall not apply to emissions released solely and exclusively by ships up to 5 000 gross tonnage providing essential interisland maritime transport services within the same outermost region. This exemption shall apply indefinitely as long as low- or zero-emission vessels and fuels suitable for the characteristics of those fleets and routes are not available on commercially, technically and economically viable terms.’

Or. xm

Amendment 2706

Emma Ytterell, Yvan Verougstraete, Anna Stürgkh, Jeannette Baljeu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point c

Directive 2003/87/EC

Article 12 – paragraph 3a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
An obligation to surrender allowances shall not arise in respect of emissions verified as captured and transported for permanent storage to a facility for which a permit is in force in accordance with Directive 2009/31/EC of the European Parliament and of the Council *, or on a reciprocal basis from 2031 to a facility with a valid permit for geological storage in a third country with a greenhouse gas emissions trading system which is linked to the EU ETS pursuant to Article 25 of this Directive and in respect of which the Commission adopts an implementing decision confirming sufficient safeguards with respect to the rules set out in Directive 2009/31/EC are in place and provided the facility is not used for enhanced oil or gas recovery.An obligation to surrender allowances shall not arise in respect of emissions verified as captured and transported for permanent storage to a facility for which a permit is in force in accordance with Directive 2009/31/EC of the European Parliament and of the Council *, or on a reciprocal basis from 2031 to a facility with a valid permit for geological storage in a third country with a greenhouse gas emissions trading system which is linked to the EU ETS pursuant to Article 25 of this Directive and in respect of which the Commission adopts an implementing decision confirming sufficient safeguards with respect to the rules set out in Directive 2009/31/EC are in place and provided the facility is not used for enhanced oil or gas recovery. Carbon dioxide captured from the atmosphere or from a source with an emission factor of zero pursuant to this Directive shall retain an emission factor of zero when subsequently released in an activity covered by this Directive, except where it is released from a permanent geological storage site after having been accounted for as a certified permanent carbon removal pursuant to Regulation (EU) 2024/3012, in which case an obligation to surrender allowances shall arise in respect of the quantity released.

Or. en

Justification

Addresses liability issue in case of leakage of captured CO2 with an emission factor of zero, in line with reasoning in recital 81 and Annex IV.

Amendment 2707

Silvia Sardone, Mathilde Androuët, Marie-Luce Brasier-Clain, Susanna Ceccardi, Barbara Bonte

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point c

Directive 2003/87/EC

Article 12 – paragraph 3a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
An obligation to surrender allowances shall not arise in respect of emissions verified as captured and transported for permanent storage to a facility for which a permit is in force in accordance with Directive 2009/31/EC of the European Parliament and of the Council *, or on a reciprocal basis from 2031 to a facility with a valid permit for geological storage in a third country with a greenhouse gas emissions trading system which is linked to the EU ETS pursuant to Article 25 of this Directive and in respect of which the Commission adopts an implementing decision confirming sufficient safeguards with respect to the rules set out in Directive 2009/31/EC are in place and provided the facility is not used for enhanced oil or gas recovery.An obligation to surrender allowances shall not arise in respect of emissions verified as captured and transported for permanent storage to a facility for which a permit is in force in accordance with Directive 2009/31/EC of the European Parliament and of the Council *, or on a reciprocal basis from 2029 to a facility with a valid permit for geological storage in a third country with a greenhouse gas emissions trading system which is linked to the EU ETS pursuant to Article 25 of this Directive and in respect of which the Commission adopts an implementing decision confirming sufficient safeguards with respect to the rules set out in Directive 2009/31/EC are in place and provided the facility is not used for enhanced oil or gas recovery.
The Commission shall adopt that implementing decision within twelve months of the entry into force of a linking agreement concluded pursuant to Article 25, ensuring that recognition of third-country storage follows linkage without undue delay. Pending that decision, transitional arrangements should ensure that emissions verified as captured and permanently stored in a third country from 2029 are not disadvantaged.

Or. en

Amendment 2708

Ondřej Knotek, Jana Nagyová, Antonín Staněk, Viktória Ferenc

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point aa (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(aa) permanently chemically bound so that they do not enter the atmosphere under normal use and that product subsequently being incinerated in an installation carrying out the activity waste incineration and waste co-incineration referred to in annex I, or;

Or. en

Justification

In case of an extension of the ETS to municipal waste incineration this would mean that subsequent stages in the life cycle of a non-permanent CCU product would become subject to a further surrender obligation on disposal. This is particularly relevant for concentrated CO2 streams from ammonia production usable in chemical sector applications where the carbon is not released during the products normal use.

Amendment 2709

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) chemically bound so that they will be primarily emitted in activities listed in Annex I and subject to a surrender obligation under Article 12(3).(b) chemically bound in a product belonging to a category for which the Commission has set a yearly coverage rate by delegated act under the fourth subparagraph. That rate shall reflect the verified, lifecycle-adjusted share of the category's carbon dioxide expected to be emitted in an Annex I activity taking into account the restrictions and the timeline set out in Articles 12a and 12b. In that case, the exemption from the obligation to surrender allowances shall only apply to the share of carbon dioxide corresponding to the yearly coverage rate.

Or. en

Justification

In its own impact assessment (Part 4, page 147), the Commission confirmed that across all non-permanent CCU products considered in the underlying study, an average incineration rate of only 21.4% if observed. Therefore granting a full exemption to surrender obligations upstream on the assumption that an equivalent amount of allowances will be surrendered by waste incinerators downstream is not justified. Furthermore, waste incineration will not be fully included in the ETS at the date of entry into force of this Regulation.

Amendment 2710

Mohammed Chahim

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) chemically bound so that they will be primarily emitted in activities listed in Annex I and subject to a surrender obligation under Article 12(3).(b) From 2036, chemically bound so that they will be primarily emitted in activities listed in Annex I and subject to a surrender obligation under Article 12(3).

Or. en

Amendment 2711

Stefan Köhler, Christine Singer

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) chemically bound so that they will be primarily emitted in activities listed in Annex I and subject to a surrender obligation under Article 12(3).(b) chemically bound so that they will be primarily emitted in activities listed in Annex I and subject to a surrender obligation under Article 12(3), or

Or. en

Justification

add. of of point (c)

Amendment 2712

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Christian Ehler, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) chemically bound so that they will be primarily emitted in activities listed in Annex I and subject to a surrender obligation under Article 12(3).(b) chemically bound so that they will be primarily emitted in activities listed in Annex I and subject to a surrender obligation under Article 12(3), or

Or. en

Amendment 2713

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) chemically bound so that they will be primarily emitted in activities listed in Annex I and subject to a surrender obligation under Article 12(3).(b) chemically bound so that they will be primarily emitted in activities listed in Annex I and subject to a surrender obligation under Article 12(3), or

Or. en

Amendment 2714

Kristian Vigenin

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) No later than 12 months after the entry into force of this Regulation, the Commission shall adopt, by means of an implementing act, an exhaustive list of eligible chemically bound carbon dioxide pathways, substances and products covered by points (a) and (b), together with harmonised monitoring, reporting and verification rules and the identification of the entity responsible for reporting and surrender obligations within the Union ETS. A process to revised periodically this list should be also proposed in the implementing act.

Or. en

Amendment 2715

Sunčana Glavak, Davor Ivo Stier

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) chemically bound in mineral carbonates produced by an active and controlled process of use and used for agricultural purposes, including as liming materials, soil improvers or fertiliser constituents.

Or. hr

Amendment 2716

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Kris Van Dijck, Aurelijus Veryga, Laurence Trochu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) chemically bound in mineral carbonates produced through an active and controlled utilisation process and used for agricultural purposes, including as liming materials, soil improvers or components of fertilisers.

Or. en

Amendment 2717

Stefan Köhler, Christine Singer

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) chemically bound in mineral carbonates produced through an active and controlled utilisation process and used for agricultural purposes, including as liming materials, soil improvers or components of fertilisers.

Or. en

Justification

This amendment seeks to establish an exemption for sugar factory lime.

Amendment 2718

Wouter Beke, Liesbet Sommen, Pascal Arimont

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) chemically bound in mineral carbonates produced through an active and controlled utilisation process and used for agricltural purposes, including as liming materials, soil improvers or components of fertilisers.

Or. en

Justification

This amendment ensures that mineral carbonates used in agriculture receive the same ETS treatment, whether produced using captured CO₂ or obtained from natural limestone or dolomite. It avoids penalising CO₂ reuse, while ensuring clear rules for measuring and accounting for the CO₂ involved.

Amendment 2719

Pascal Canfin

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ba) chemically bound in a product, other than a product intended to be used as fuel, whose equivalent manufactured from fossil feedstock is not primarily emitted in activities listed in Annex I

Or. en

Amendment 2720

Kristian Vigenin

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point ca (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ca) Prior to the adoption of the implementing act referred to in point (c), the Commission shall establish a formal consultation process involving operators of installations covered by Directive 2003/87/EC. Such consultation shall determine, for each eligible carbon dioxide pathway, the allocation of monitoring, reporting and surrender responsibilities across the value chain, taking into account traceability requirements, administrative burden, carbon accounting consistency and the integrity of Union ETS product benchmarks. This collaborative assessment will warrentee that no double counting may occur along the value chain.

Or. en

Amendment 2721

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Christian Ehler, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – point ba (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) chemically bound in mineral carbonates produced through an active and controlled utilisation process and used for agricultural purposes, including as liming materials, soil improvers or components of fertilisers.

Or. en

Justification

The amendment addresses the treatment of carbon dioxide chemically bound in mineral carbonates produced through an active and controlled utilisation process and subsequently used for agricultural purposes. Such materials may substitute functionally equivalent mineral carbonates derived from natural limestone or dolomite and used as liming materials, soil improvers or components of fertilisers.Requiring surrender solely because the mineral carbonate originates from an industrial carbon utilisation process may result in different ETS treatment of functionally equivalent products and discourage productive carbon utilisation. The amendment therefore establishes a specific treatment for such mineral carbonates while requiring the Commission to determine, through delegated acts, a robust and verifiable methodology for quantifying the carbon dioxide concerned. This provides legal certainty, supports technology-neutral treatment of comparable agricultural carbonate products and safeguards the integrity of emissions accounting.

Amendment 2722

Grégory Allione

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – subparagraph 1a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
3ba. An obligation to surrender allowances shall not arise in respect of emissions released until 31 December 2035 on all voyages from or to a port located in outermost regions.

Or. en

Amendment 2723

Kristian Vigenin

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2008/98/EC

Article 12 – paragraph 3b – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.
The delegated acts introduced pursuant to this paragraph, including partial surrender requirements, shall not apply to carbon capture and utilisation projects that, before the date of entry into force of those requirements:
(a) were operational;
(b) had reached a final investment decision; or
(c) had started physical construction,
provided that the project continues to comply with the applicable monitoring, reporting and verification requirements and that full greenhouse gas accounting, traceability and the avoidance of double counting are ensured.
The Commission may, where necessary to ensure environmental integrity, adopt proportionate requirements concerning monitoring, reporting, verification and traceability applicable to such projects, provided that those requirements do not retroactively alter the compliance treatment applicable to the emissions covered by the project at the time of the investment decision.

Or. en

Amendment 2724

Alexander Bernhuber, Angelika Winzig

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.
Those delegated acts shall in any event consider the following to be permanently chemically bound: (a) all mineral carbonation pathways, including the production of precipitated calcium carbonate (PCC); Those delegated acts shall lay down conservative default values for the carbon retention time for each typical use case. Where a recognised default pathway is used, no project-specific certification shall be required.

Or. en

Justification

The change to the accounting methodology and the opening towards non-permanently stored CCU products are important: emissions accounting along the value chain should take place where the CO2 is actually released. The previous restriction to very long-lived (construction) products has prevented viable CCU business models from emerging.For legal certainty, the categories that are unambiguously permanent should be fixed in the Directive rather than left entirely to the delegated act. Mineral carbonation pathways, including PCC, meet the permanence requirement.

Amendment 2725

Virgil-Daniel Popescu, Daniel Buda, Dan-Ştefan Motreanu, Iuliu Winkler, Gheorghe Falcă, Siegfried Mureşan

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded. Any requirements introduced pursuant to this paragraph, including partial surrender requirements, shall not alter the compliance treatment applicable to projects that, before the entry into force of those requirements, were already operational, had reached a final investment decision or had started physical construction, provided that full greenhouse-gas accounting, traceability and avoidance of double counting are ensured.

Or. en

Justification

If an operator deploys a CCU technology in compliance with the rules of today, the project's financial model cannot be exposed to subsequent, retroactive carbon liabilities if the Commission later revises its calculation models. This amendment ensures that once a CCU pathway is verified as compliant, its status is grandfathered, providing the predictability required for long-term industrial transition planning.

Amendment 2726

Pascal Canfin

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded. The requirements shall not treat captured carbon less favourably than the fossil carbon it replaces, and shall ensure that the carbon dioxide bound is monitored and verified in accordance with Articles 14 and 15.

Or. en

Amendment 2727

Dimitris Tsiodras

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded. Any partial surrender requirements introduced to address residual carbon leakage risks shall not retroactively alter the compliance status of projects operational at the time of the act's adoption.

Or. en

Justification

If an operator deploys a CCU technology in compliance with the rules of today, the project's financial model cannot be exposed to subsequent, retroactive carbon liabilities if the Commission later revises its calculation models. This amendment ensures that once a CCU pathway is verified as compliant, its status is grandfathered, providing the predictability required for long-term industrial transition planning.

Amendment 2728

Stefan Köhler, Christine Singer

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, including the method for determining the quantity of carbon dioxide emissions covered by point (c), and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.

Or. en

Justification

This amendment seeks to establish an exemption for sugar factory lime.

Amendment 2729

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Kris Van Dijck, Aurelijus Veryga, Laurence Trochu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, including the method for determining the quantity of carbon dioxide emissions covered by point (c), and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.

Or. en

Amendment 2730

Wouter Beke, Liesbet Sommen, Pascal Arimont

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, including the method for determining the quantity of carbon dioxide emissions covered by point (c), and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.

Or. en

Amendment 2731

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Christian Ehler, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, including the method for determining the quantity of carbon dioxide emissions covered by point (c), and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.

Or. en

Amendment 2732

Emma Ytterell, Yvan Verougstraete, Anna Stürgkh, Jeannette Baljeu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – subparagraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.By 31 December 2030, the Commission shall adopt delegated acts in accordance with Article 23 to supplement this Directive concerning the requirements for considering that greenhouse gases have become permanently chemically bound or chemically bound as referred to in the first subparagraph of this paragraph, and list the types of utilisation that are considered to meet or not to meet these requirements. Those delegated acts may determine de minimis thresholds for the risk of not meeting those requirements and may introduce measures, such as partial surrender requirements, to address carbon leakage risks when these thresholds are exceeded.

Or. en

Amendment 2733

Pascal Canfin

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d

Directive 2003/87/EC

Article 12 – paragraph 3b – subparagraph 2a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Each year, the quantity of allowances to be auctioned pursuant to Article 10 shall be reduced by a number of allowances corresponding to the quantity of carbon dioxide in respect of which no obligation to surrender allowances arose pursuant to point (c) of the first subparagraph in the preceding year, as reported and verified in accordance with Articles 14 and 15. Those allowances shall be cancelled.

Or. en

Amendment 2734

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d a (new)

Directive 2003/87/EC

Article 12 – paragraph 4

Amendment: Present text and Amendment
Present textAmendment
(da) In Article 12, paragraph 4 is replaced by the following:
4. Member States shall take the necessary steps to ensure that allowances are cancelled at any time at the request of the person holding them. In the event of closure of electricity generation capacity in their territory due to additional national measures, Member States may cancel allowances, and are strongly encouraged to do so, from the total quantity of allowances to be auctioned by them referred to in Article 10(2) up to an amount corresponding to the average verified emissions of the installation concerned over a period of five years preceding the closure. The Member State concerned shall inform the Commission of such intended cancellation, or of the reasons for not cancelling, in accordance with the delegated acts adopted pursuant to Article 10(4).4. Member States shall take the necessary steps to ensure that allowances are cancelled at any time at the request of the person holding them. In the event of closure of electricity generation capacity or other permanent emission reductions from operators, aircraft operators or shipping companies in their territory due to additional national measures, Member States shall cancel allowances from the total quantity of allowances to be auctioned by them referred to in Article 10(2) up to an amount corresponding to the average verified emissions of the installation concerned over a period of five years preceding the closure or permanent emission reduction. The Member State concerned shall inform the Commission of such intended cancellation, or of the reasons for not cancelling, in accordance with the delegated acts adopted pursuant to Article 10(4).

Or. en

Justification

Member States shall cancel allowances when they take national measures leading to permanent emission reductions from operators, aircraft operators or shipping companies covered by the ETS, such as national coal phase-outs or bans on domestic flights.

Amendment 2735

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point d a (new)

Directive 2003/87/EC

Article 12 – paragraph 8

Amendment: Present text and Amendment
Present textAmendment
(ea) paragraph 8 is replaced by the following:
8. The calculation of offsetting requirements referred to in paragraph 6 of this Article for the purposes of CORSIA shall be made in accordance with a methodology to be specified by the Commission in respect of flights to, from and between States that are listed in the implementing act adopted pursuant to Article 25a(3), and of flights between Switzerland or the United Kingdom and States that are listed in the implementing act adopted pursuant to Article 25a(3).The Commission shall adopt implementing acts specifying the methodology for the calculation of offsetting requirements for aircraft operators referred to in the first subparagraph of this paragraph. Those implementing acts shall in particular detail further the application of the requirements following from the relevant provisions of this Directive, in particular Articles 3c, 11a, 12 and 25a, and, to the extent possible in light of the relevant provisions of this Directive, from the International Standards and Recommended Practices on Environmental Protection for CORSIA (CORSIA SARPs).Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 22a(2). The first such implementing act shall be adopted by 30 June 2024."8. The calculation of offsetting requirements referred to in paragraph 6 of this Article for the purposes of CORSIA shall be made in accordance with provisions of the International Standards and Recommended Practices on Environmental Protection for CORSIA (CORSIA SARPs). The Commission shall adopt implementing acts specifying the methodology for the calculation of offsetting requirements for aircraft operators referred to in the first subparagraph of this paragraph. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article 22a(2). The first such implementing act shall be adopted by 30 June 2024.
"

Or. en

(02003L0087-20240301)

Amendment 2736

Michalis Hadjipantela

Proposal for a directive

Article 1 – paragraph 1 – point 22 – point e a (new)

Directive 2003/87/EC

Article 12 – paragraph 9a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(ea) 9a. Operators, aircraft operators and shipping companies may fulfil their surrender obligations through the cancellation of eligible domestic permanent carbon removal units certified under Regulation (EU) 2024/3012, whether generated by them or acquired from third parties. For compliance purposes, one eligible permanent carbon removal unit shall have the same compliance value as one allowance.

Or. en

Amendment 2737

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a and 12b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Phase-in of requirements for waste incineration and waste co-incinerationdeleted

Or. en

Amendment 2738

Silvia Sardone, Mathilde Androuët, Roman Haider, Marie-Luce Brasier-Clain, Susanna Ceccardi, Barbara Bonte

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a and 12b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
[...]deleted

Or. en

Amendment 2739

Anna Zalewska, Jacek Ozdoba, Jadwiga Wiśniewska, Daniel Obajtek, Beata Szydło, Rihards Kols, Patryk Jaki, Marion Maréchal

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a and 12b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(23) [...]deleted

Or. en

Justification

The inclusion of waste incineration in the EU ETS should be deleted. It risks slowing the shift from landfilling to waste incineration, while increasing waste-management and district heating costs for municipalities and households, without providing a sufficiently effective decarbonisation incentive.

Amendment 2740

Ondřej Knotek, Jana Nagyová, Antonín Staněk, Roman Haider, Viktória Ferenc

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a and 12b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
[...]deleted

Or. en

Justification

The proposal does not consider the waste management sector specific role as an essential service, where operators are obligated to process all received waste regardless of its composition or carbon content, contradicting the polluter-pays principle. This inclusion would impose substantial and volatile financial burdens on municipalities, businesses, and citizens, leading to higher waste management and heating costs.

Amendment 2741

François-Xavier Bellamy

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a and 12b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
[...]deleted

Or. en

Amendment 2742

Letizia Moratti, Massimiliano Salini, Flavio Tosi

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a and 12b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(23) [...]deleted

Or. en

Amendment 2743

Jorge Buxadé Villalba, Roman Haider, Silvia Sardone, Marie-Luce Brasier-Clain, Mathilde Androuët, Anne-Sophie Frigout

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Article 12adeleted

Or. en

Amendment 2744

Alexandr Vondra

on behalf of the ECR Group

Ondřej Krutílek, Anna Zalewska, Aurelijus Veryga, Laurence Trochu, Adrian-George Axinia

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Article 12adeleted

Or. en

Justification

The proposed phase-in and opt-out offer temporary flexibility but do not resolve the structural problem: the EU ETS is not suited to Waste-to-Energy. Carbon pricing is effective when operators can switch to lower-carbon alternatives. Waste-to-Energy operators cannot control the fossil carbon content of the residual waste they treat, and for non-recyclable waste there is no cleaner treatment option to which they can switch. Gradually introducing the surrender obligation, or temporarily exempting some installations from it, does not change this.

Amendment 2745

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Article 12aArticle 12a new
Phase-in of requirements for waste incineration and waste co-incinerationReview of waste incineration and waste co-incineration
Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances according to the following schedule: (a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12; (b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12; (c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12; (d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12. By way of derogation from the first paragraph of this Article, Member States may exempt waste incineration and waste co-incineration installations located in outermost regions within the meaning of Article 349 TFEU from the obligation to surrender allowances until 31 December 2035.1. Installations carrying out waste incineration and waste co-incineration activities listed in Annex I shall continue to monitor, report and verify their emissions in accordance with Articles 14 and 15.
2. By 30 June 2029, the Commission shall submit to the European Parliament and to the Council a report, accompanied by an impact assessment, evaluating, at Union and Member State level:
(a) effects on the waste hierarchy, waste prevention, reuse and recycling;
(b) risks of diversion to landfill, exports or treatment routes outside the scope of the EU ETS;
(c) impacts on municipal waste fees, district and process heat and energy recovery;
(d) the degree to which operators can effectively influence the fossil carbon content of incoming waste;
(e) interaction with national carbon-pricing and waste-taxation measures;
(f) the conditions necessary to preserve a level playing field in the internal market; and
(g) the risk of double burden or double accounting and the safeguards necessary to address such risks.
3. By way of derogation from Article 12(3), first subparagraph, point (a), no obligation to surrender allowances shall apply from 1 January 2031 to the activities referred to in paragraph 1 unless such an obligation is introduced by a legislative act amending this Directive, adopted by the European Parliament and the Council on the basis of the report and impact assessment referred to in paragraph 2.

Or. en

Justification

The amendment maintains full monitoring, reporting and verification requirements for waste incineration and co-incineration while making the introduction of a surrender obligation subject to a prior comprehensive assessment and a subsequent legislative decision. The application of carbon pricing to waste incineration may affect the waste hierarchy, prevention and recycling incentives, landfill and export leakage, municipal waste fees, heat supply and energy recovery. At the same time, operators may have limited ability to influence the fossil carbon content of incoming residual waste.The Commission should therefore assess these effects at both Union and Member State level before a surrender obligation is introduced. Maintaining MRV requirements provides the necessary emissions data for that assessment. Requiring any subsequent surrender obligation to be introduced through a legislative act amending this Directive ensures that the environmental, economic and distributional consequences, including risks of double burden and waste diversion, can be addressed on the basis of robust evidence.

Amendment 2746

Jessica Polfjärd

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 2a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
The implementation of this Article shall be consistent with the waste hierarchy established in Article 4 of Directive 2008/98/EC and shall support waste prevention, reuse, material recycling and the recovery of secondary raw materials."

Or. en

Justification

When waste incineration is included in the ETS, the carbon price should encourage more waste to be reused and recycled instead of being incinerated.

Amendment 2747

Marie-Luce Brasier-Clain, Anne-Sophie Frigout, Mathilde Androuët, Valérie Deloge, Antonín Staněk, Barbara Bonte, Ondřej Knotek, Jana Nagyová

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Phase-in of requirements for waste incineration and waste co-incinerationdeleted

Or. fr

Amendment 2748

Günther Sidl

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2008/98/EC

Article 12a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Phase-in of requirements for waste incineration and waste co-incinerationdeleted

Or. en

Amendment 2749

Grégory Allione

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Phase-in of requirements for waste incineration and waste co-incinerationdeleted

Or. en

Amendment 2750

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Phase-in of requirements for waste incineration and waste co-incinerationdeleted

Or. en

Amendment 2751

Emma Ytterell, Yvan Verougstraete, Martin Hojsík, Karin Karlsbro

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – title

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Phase-in of requirements for waste incineration and waste co-incinerationPhase-in of requirements for waste incineration, waste co-incineration and landfilling

Or. en

Amendment 2752

Marie-Luce Brasier-Clain, Anne-Sophie Frigout, Mathilde Androuët, Valérie Deloge, Antonín Staněk, Barbara Bonte, Ondřej Knotek, Jana Nagyová

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances according to the following schedule:deleted
(a) 25 % of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;
(b) 50 % of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;
(d) 100 % of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.

Or. fr

Amendment 2753

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances according to the following schedule:deleted
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.

Or. en

Amendment 2754

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances according to the following schedule:deleted
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.

Or. en

Amendment 2755

Grégory Allione

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances according to the following schedule:deleted
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.

Or. en

Amendment 2756

Günther Sidl

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2008/98/EC

Article 12a – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances according to the following schedule:deleted
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.

Or. en

Amendment 2757

Katri Kulmuni, Gerben-Jan Gerbrandy

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – introductory sentence

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances according to the following schedule:Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances in accordance with Article 12 in respect of the full amount of their verified emissions.

Or. en

Justification

We support a faster and more ambitious inclusion of MWI in the ETS, with full inclusion from 2031. A gradual phase-in weakens investment certainty and delays recycling, as the carbon price is a key driver for residual waste pre-sorting. The Commission has identified low plastic capture rates and continued reliance on incineration as risks to meeting recycling targets. Full liability from 2031 would provide a clear investment signal, accelerate decarbonisation and support higher recycling rates.

Amendment 2758

Sirpa Pietikäinen

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – introductory sentence

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances according to the following schedule:Waste incineration and waste co-incineration installations that become subject to the system from 2028 shall be liable to surrender allowances according to the following schedule:

Or. en

Amendment 2759

Heléne Fritzon

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – introductory sentence

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances according to the following schedule:Waste incineration and waste co-incineration installations that become subject to the system from 2029 shall be liable to surrender allowances according to the following schedule:

Or. en

Amendment 2760

Jessica Polfjärd

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – introductory sentence

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances according to the following schedule:Waste incineration and waste co-incineration installations that become subject to the system from 2028 shall be liable to surrender allowances according to the following schedule:

Or. en

Amendment 2761

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – introductory sentence

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Waste incineration and waste co-incineration installations that become subject to the system from 2031 shall be liable to surrender allowances according to the following schedule:Waste incineration and waste co-incineration installations that become subject to the system from 2028 shall be liable to surrender allowances according to the following schedule:

Or. en

Justification

Co-legislators already agreed in the last ETS revision to foresee the gradual extension of ETS to municipal waste incinerators as of 2028.

Amendment 2762

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2763

Günther Sidl

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2008/98/EC

Article 12a – paragraph 1 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2764

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2765

Katri Kulmuni, Gerben-Jan Gerbrandy

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2766

Sirpa Pietikäinen

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;(a) 25% of verified emissions reported for 2028 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2767

Li Andersson, Jonas Sjöstedt, Per Clausen

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;(a) 50% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Justification

The 2031-2034 four-step phase-in keeps the effective carbon price too low for too long. Early-EU-ETS experience shows that low carbon costs are simply absorbed rather than driving change, and recent Swedish EPA analysis shows a meaningful carbon price can shift waste sorting and waste flows. The gap between a weak carbon price and the cost of alternatives is large: mixed waste sorting costs around EUR 40 per tonne, against roughly EUR 113 per tonne for CCS. A two-step 50%/100% phase-in brings a meaningful signal in early enough to influence investment decisions.

Amendment 2768

Heléne Fritzon

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;(a) 25% of verified emissions reported for 2029 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2769

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;(a) 25% of verified emissions reported for 2028 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2770

Emma Ytterell, Martin Hojsík, Sigrid Friis

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;(a) 50% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2771

Jessica Polfjärd

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;(a) 25% of verified emissions reported for 2029 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2772

Sophie Wilmès, Olivier Chastel, Benoit Cassart

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point a

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(a) 25% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;(a) 20% of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2773

Katri Kulmuni, Gerben-Jan Gerbrandy

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2774

Günther Sidl

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2008/98/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2775

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2776

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2777

Martin Hojsík, Michal Wiezik

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;(b) 100% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Justification

A four-phase roll-out would keep the effective price of carbon too low for too long. Experience from the EU-ETS shows that low carbon costs are absorbed rather than incentivising change. A recent study by the Swedish Environmental Protection Agency (EPA) demonstrates that a meaningful carbon price can influence waste sorting and waste streams. The difference between the low carbon price and the costs of alternatives is significant: sorting mixed waste costs approximately €40 per tonne, whilst the costs of carbon capture and storage are approximately €113 per tonne. A two-phase roll-out with a 50 %/100 % ratio sends a clear signal sufficiently early on, which may influence investment decisions.

Amendment 2778

Jessica Polfjärd

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;(b) 50% of verified emissions reported for 2030 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2779

Heléne Fritzon

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;(b) 50% of verified emissions reported for 2030 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2780

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;(b) 50% of verified emissions reported for 2029 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2781

Emma Ytterell, Sigrid Friis

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;(b) 75% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2782

Sirpa Pietikäinen

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;(b) 50% of verified emissions reported for 2029 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2783

Sophie Wilmès, Olivier Chastel, Benoit Cassart

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;(b) 40% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2784

Li Andersson, Jonas Sjöstedt, Per Clausen

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point b

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(b) 50% of verified emissions reported for 2032 that would be subject to surrender requirements in accordance with Article 12;(b) 100% of verified emissions reported for 2032 and each year thereafter in accordance with Article 12.

Or. en

Justification

The 2031-2034 four-step phase-in keeps the effective carbon price too low for too long. Early-EU-ETS experience shows that low carbon costs are simply absorbed rather than driving change, and recent Swedish EPA analysis shows a meaningful carbon price can shift waste sorting and waste flows. The gap between a weak carbon price and the cost of alternatives is large: mixed waste sorting costs around EUR 40 per tonne, against roughly EUR 113 per tonne for CCS. A two-step 50%/100% phase-in brings a meaningful signal in early enough to influence investment decisions.

Amendment 2785

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2786

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2787

Martin Hojsík, Michal Wiezik

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Justification

A four-phase roll-out would keep the effective price of carbon too low for too long. Experience from the EU-ETS shows that low carbon costs are absorbed rather than incentivising change. A recent study by the Swedish Environmental Protection Agency (EPA) demonstrates that a meaningful carbon price can influence waste sorting and waste streams. The difference between the low carbon price and the costs of alternatives is significant: sorting mixed waste costs approximately €40 per tonne, whilst the costs of carbon capture and storage are approximately €113 per tonne. A two-phase roll-out with a 50 %/100 % ratio sends a clear signal sufficiently early on, which may influence investment decisions.

Amendment 2788

Katri Kulmuni, Gerben-Jan Gerbrandy

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2789

Günther Sidl

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2008/98/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Amendment 2790

Li Andersson, Jonas Sjöstedt, Per Clausen

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;deleted

Or. en

Justification

The 2031-2034 four-step phase-in keeps the effective carbon price too low for too long. Early-EU-ETS experience shows that low carbon costs are simply absorbed rather than driving change, and recent Swedish EPA analysis shows a meaningful carbon price can shift waste sorting and waste flows. The gap between a weak carbon price and the cost of alternatives is large: mixed waste sorting costs around EUR 40 per tonne, against roughly EUR 113 per tonne for CCS. A two-step 50%/100% phase-in brings a meaningful signal in early enough to influence investment decisions.

Amendment 2791

Jessica Polfjärd

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;(c) 75 % of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2792

Sophie Wilmès, Olivier Chastel, Benoit Cassart

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;(c) 60 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2793

Heléne Fritzon

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;(c) 75 % of verified emissions reported for 2031 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2794

Sirpa Pietikäinen

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;(c) 75 % of verified emissions reported for 2030 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2795

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;(c) 75 % of verified emissions reported for 2030 that would be subject to surrender requirements in accordance with Article 12;

Or. en

Amendment 2796

Emma Ytterell, Sigrid Friis

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point c

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(c) 75 % of verified emissions reported for 2033 that would be subject to surrender requirements in accordance with Article 12;(c) 100% of verified emissions reported for 2033 and each year thereafter, in accordance with Article 12;

Or. en

Amendment 2797

Emma Ytterell, Martin Hojsík, Sigrid Friis

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.deleted

Or. en

Amendment 2798

Li Andersson, Jonas Sjöstedt, Per Clausen

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.deleted

Or. en

Justification

The 2031-2034 four-step phase-in keeps the effective carbon price too low for too long. Early-EU-ETS experience shows that low carbon costs are simply absorbed rather than driving change, and recent Swedish EPA analysis shows a meaningful carbon price can shift waste sorting and waste flows. The gap between a weak carbon price and the cost of alternatives is large: mixed waste sorting costs around EUR 40 per tonne, against roughly EUR 113 per tonne for CCS. A two-step 50%/100% phase-in brings a meaningful signal in early enough to influence investment decisions.

Amendment 2799

Katri Kulmuni, Gerben-Jan Gerbrandy

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.deleted

Or. en

Amendment 2800

Günther Sidl

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2008/98/EC

Article 12a – paragraph 1 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.deleted

Or. en

Amendment 2801

Nicola Procaccini, Pietro Fiocchi, Michele Picaro, Sergio Berlato, Stefano Cavedagna, Paolo Inselvini, Antonella Sberna, Alexandr Vondra, Sander Smit, Alessandro Ciriani, Carlo Fidanza, Carlo Ciccioli, Giovanni Crosetto, Elena Donazzan, Alberico Gambino, Chiara Gemma, Lara Magoni, Mario Mantovani, Giuseppe Milazzo, Denis Nesci, Daniele Polato, Ruggero Razza, Marco Squarta, Francesco Torselli, Francesco Ventola, Mariateresa Vivaldini

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.deleted

Or. en

Amendment 2802

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.deleted

Or. en

Amendment 2803

Heléne Fritzon

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.(d) 100% of verified emissions reported for 2032 and each year thereafter in accordance with Article 12.

Or. en

Amendment 2804

Michael Bloss

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.(d) 100% of verified emissions reported for 2031 and each year thereafter in accordance with Article 12.

Or. en

Amendment 2805

Jessica Polfjärd

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.(d) 100% of verified emissions reported for 2032 and each year thereafter in accordance with Article 12.

Or. en

Amendment 2806

Sirpa Pietikäinen

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.(d) 100% of verified emissions reported for 2031 and each year thereafter in accordance with Article 12.

Or. en

Amendment 2807

Sophie Wilmès, Olivier Chastel, Benoit Cassart

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(d) 100% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.(d) 80% of verified emissions reported for 2034 and each year thereafter in accordance with Article 12.

Or. en

Amendment 2808

Sophie Wilmès, Olivier Chastel, Benoit Cassart

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1 – point da (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
(da) 100% of verified emissions reported for 2035 and each year thereafter in accordance with Article 12.

Or. en

Amendment 2809

Sophie Wilmès, Olivier Chastel, Benoit Cassart, Katri Kulmuni

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 1a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
Member States shall ensure that the costs directly resulting from the surrender of allowances pursuant to this Article, insofar as they result from fossil carbon contained in products placed on the Union market, are borne by the producers of those products, in accordance with the polluter-pays principle, including through extended producer responsibility schemes, and are not passed on to local or regional authorities responsible for municipal waste management. The financial contributions by producers shall take into account, in particular, the fossil carbon content, recyclability and end-of-life treatment of the products concerned.

Or. en

Amendment 2810

Grégory Allione

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
By way of derogation from the first paragraph of this Article, Member States may exempt waste incineration and waste co-incineration installations located in outermost regions within the meaning of Article 349 TFEU from the obligation to surrender allowances until 31 December 2035.deleted

Or. en

Amendment 2811

Günther Sidl

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2008/98/EC

Article 12a – paragraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
By way of derogation from the first paragraph of this Article, Member States may exempt waste incineration and waste co-incineration installations located in outermost regions within the meaning of Article 349 TFEU from the obligation to surrender allowances until 31 December 2035.deleted

Or. en

Amendment 2812

Andrea Wechsler, Norbert Herhammer, Verena Mertens, Sabine Verheyen, Marie-Sophie Christ, Angelika Niebler

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
By way of derogation from the first paragraph of this Article, Member States may exempt waste incineration and waste co-incineration installations located in outermost regions within the meaning of Article 349 TFEU from the obligation to surrender allowances until 31 December 2035.deleted

Or. en

Amendment 2813

Sérgio Humberto, Paulo do Nascimento Cabral, Paulo Cunha, Lídia Pereira

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 2

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
By way of derogation from the first paragraph of this Article, Member States may exempt waste incineration and waste co-incineration installations located in outermost regions within the meaning of Article 349 TFEU from the obligation to surrender allowances until 31 December 2035.By way of derogation from the first paragraph of this Article, Member States shall exempt waste incineration and waste co-incineration installations located in outermost regions within the meaning of Article 349 TFEU from the obligation to surrender allowances.

Or. pt

Amendment 2814

André Franqueira Rodrigues

Proposal for a directive

Article 1 – paragraph 1 – point 23

Directive 2003/87/EC

Article 12a – paragraph 2d

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
By way of derogation from the first paragraph of this Article, Member States may exempt waste incineration and waste co-incineration installations located in outermost regions within the meaning of Article 349 TFEU from the obligation to surrender allowances until 31 December 2035.By way of derogation from the first paragraph of this Article, Member States may exempt waste incineration and waste co-incineration installations located in outermost regions within the meaning of Article 349 TFEU from the obligation to surrender allowances.

Or. en

Justification

Outermost regions should be exempted in general from including waste incineration plants given their constraints in deploying a comprehensive waste-management ecosystem at scale and distance from recycling markets even beyond 2035

Connections

The dossier, the decisions on this text and its other versions.

No connections found for this item.

Sources & citation

Where the facts on this page come from, and how to cite it.

Data source
Licensed CC BY 4.0.
Retrieved
23 November 2026

Cite as

European Parliament (2026). “AMENDMENTS 2539 - 2814 - Draft report EU Emissions Trading System and market stability reserve: competitiveness and cost-effective decarbonisation”. Text, 20 October 2026. docId ENVI-AM-796496. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/ENVI-AM-796496 (retrieved 23 November 2026). Data: EP Open Data API: document record, https://data.europarl.europa.eu/api/v2/documents/ENVI-AM-796496 (CC BY 4.0).
BibTeX
@misc{epw-text-envi-am-796496,
  author = {{European Parliament}},
  title = {{AMENDMENTS 2539 - 2814 - Draft report EU Emissions Trading System and market stability reserve: competitiveness and cost-effective decarbonisation}},
  year = {2026},
  date = {2026-10-20},
  howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/ENVI-AM-796496}},
  url = {https://news.eu-parl.st-solutions.dev/texts/ENVI-AM-796496},
  urldate = {2026-11-23},
  publisher = {EU Parl Watch Research},
  note = {Text. docId ENVI-AM-796496. Data: EP Open Data API: document record (CC BY 4.0)}
}