Skip to content

Text · Comparison of two versions

Changes from plenary report to adopted text

A-9-2023-0147 → TA-9-2024-0317

From
A-9-2023-0147 Plenary report of 14 Apr 2023
To
TA-9-2024-0317 Adopted text of 24 Apr 2024
Changes
Not comparable
Paragraphs
+9 added · −1 254 removed · 1 changed
More facts (2)
Title (from)
on the proposal for a regulation of the European Parliament and of the Council Guidelines for the development of the trans-European transport network, amending Regulation (EU) 2021/1153 and Regulation (EU) No 913/2010 and repealing Regulation (EU) 1315/2013
Title (to)
Trans-European transport network

These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.

Every difference

The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.

Part 8 of 23: Paragraphs 421–480

RemovedArticle 16 – paragraph 2 – point b: deleted / (see EC amended proposal - point 7)

Removed(Ex AM 193( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 2 – subparagraph 1 (new): At the request of a Member State, in duly justified cases including reasons of cost-efficiency of the service, exemptions may be granted by the Commission by means of implementing acts in respect of the requirements set in this paragraph, except for the requirements set in Article 15, paragraph 2, points (c) and (d). Any request for exemption shall be based on a socio-economic cost-benefit analysis and an assessment of the impact on interoperability. An exemption shall comply with the requirements of Directive (EU) 2016/797 of the European Parliament and of the Council , be coordinated with and agreed by the neighbouring Member State(s) where applicable.

Removed(Ex AM 194( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 2 a (new): 2 a. Without prejudice to paragraph 2, second subparaph, Member States shall ensure that on the railway infrastructure of the extended core network network, as of 31 December 2030, in case of construction of a new line, the requirement set out in paragraph 2, point (-a), is complied with.

Removed(Ex AM 195( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 3 – introductory part: 3. Member States shall ensure that the railway infrastructure of the core network by 31 December 2030:

Removed(Ex AM 196( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 3 – point -a (new): (-a) is fully electrified as regards line tracks and, to the extent necessary for electric train operations, as regards sidings;

Removed(Ex AM 197( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 3 – point a: (a) meets the requirements set out in Article 15(2), points (c) and (d); / (see EC amended proposal - point 7)

Removed(Ex AM 198( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 3 – point a a (new): (a a) allows for a prevailing minimum operational line speed of 100 km/h for freight trains on the freight lines of the core network;

Removed(Ex AM 199( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 3 – point b: deleted / (see EC amended proposal - point 7)

Removed(Ex AM 200( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 3 – point b a (new): (b a) allows for a prevailing minimum line speed of 160 km/h for passenger trains on the passenger lines of the core network;

Removed(Ex AM 201( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 3 – subparagraph 1 (new): At the request of a Member State, in duly justified cases where a Member State is affected by specific geographic or significant physical constraints which prevent the requirements set out in this paragraph, points (ab) and (ba), being complied with on the rail lines on the core network, exemptions may be granted by the Commission by means of implementing acts in respect of those requirements.

Removed(Ex AM 202( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 3 a (new): 3 a. Member States shall ensure that on the railway infrastructure of the core network network, as of 31 December 2025, in case of construction of a new line, the requirement set out in paragraph 3, point (-a), is complied with.

Removed(Ex AM 203( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 4 – introductory part: 4. Member States shall ensure that the railway infrastructure of the core network by 31 December 2040:

Removed(Ex AM 204( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 4 – point b: deleted / (see EC amended proposal - point 7)

Removed(Ex AM 205( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 4 – subparagraph 1 (new): At the request of a Member State, in duly justified cases including reasons of cost-efficiency of the service, exemptions to the requirement set out in point (a) of this paragraph may be granted by the Commission by means of implementing acts. Any request for exemption shall be based on a socio-economic cost-benefit analysis and an assessment of the impact on interoperability. An exemption shall comply with the requirements of Directive (EU) 2016/797 of the European Parliament and of the Council, and be coordinated with and agreed by the neighbouring Member State(s) where applicable.

Removed(Ex AM 206( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 5: 5. Isolated networks are exempted from the requirements under paragraph 2, 3 and 4; / deleted / deleted

Removed(Ex AM 207( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 16 – paragraph 5 a (new): 5 a. Member States shall ensure that the railway infrastructure connections referred to in Article 14(1), point (d), meet the requirements of Article 15(2): / - on the core network by 31 December 2030; / - on the extended core network by 31 December 2040; and / - on the comprehensive network by 31 December 2050. / At the request of a Member State, in duly justified cases including reasons of cost-efficiency of the service, exemptions in respect of the requirements set out in Article 15(2), points (a) and (e) may be granted by the Commission by means of implementing acts. Any request for exemption shall be based on a socio-economic cost-benefit analysis and an assessment of the impact on interoperability. An exemption shall comply with the requirements of Directive (EU) 2016/797 of the European Parliament and of the Council, be coordinated with and agreed by the neighbouring Member State(s) where applicable.; / At the request of a Member State, in duly justified cases where specific geographic or significant physical constraints prevent such provision, exemptions to the requirement set out in Article 15(2), point (d) may be granted by the Commission by means of implementing acts.

Removed(Ex AM 208( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed(Ex AM 209( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed(Ex AM 210( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed(Ex AM 211( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed(Ex AM 212( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 17 – paragraph 1 – point a: (a) ERTMS is equipped, whilst a synchronised and harmonised ERTMS deployment of tracksides and onboards is ensured;

Removed(Ex AM 213( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 17 – paragraph 4: 4. Member States shall ensure that the railway infrastructure of the core network, the extended core network and the comprehensive network, including connections referred to in Article 14(1), point (d), is equipped with ERTMS by 31 December 2040.

Removed(Ex AM 214( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 17 – paragraph 5: 5. Member States shall ensure that on the railway infrastructure of the core network, the extended core network and the comprehensive network, including connections referred to in Article 14(1), point (d), as of 31 December 2025, in case of construction of a new line or upgrade of the signalling system, ERTMS is being deployed.

Removed(Ex AM 215( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 17 – paragraph 6: For isolated networks, at the request of a Member State, in duly justified cases, exemptions may be granted by the Commission by means of implementing acts in respect of requirements referred to in paragraphs 1 to 5.

Removed(Ex AM 216( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 17 – paragraph 6 a (new): 6 a. Member States shall timely inform the concerned parties about ERTMS deployment before the ETCS trackside deployment and before the decommissioning of class B systems.

Removed(Ex AM 217( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 17 – paragraph 6 b (new): 6 b. The Commission shall ensure the Technical Specifications for Interoperability (TSI CCS and TSI INF) are aligned with this Regulation, implying the alignment of provisions as well as the effective implementation.

Removed(Ex AM 218( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 17 – paragraph 6 c (new): 6 c. The Commission shall consider to provide, within two years from the date of entry in force of this Regulation, a legislative proposal for establishing a harmonised Rail Traffic Management System in order to improve cross-border operations on the trans-European transport network.

Removed(Ex AM 219( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 18 – paragraph 1 – introductory part: 1. Member States shall ensure that, by 31 December 2030, the quality of services provided by infrastructure managers to railway undertakings and terminal operators, technical, administrative and operational requirements for infrastructure use and procedures related to border controls do not prevent the operational performance of rail freight services along the rail freight lines of the European Transport Corridors from meeting the following target values:

Removed(Ex AM 220( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 18 – paragraph 1 – point a: (a) for each internal Union cross-border section, the dwelling time of all freight trains crossing the border does not exceed 15 minutes. Dwelling time of a train on a cross-border section means the total additional transit time that can be attributed to the existence of the border crossing, irrespective of the underlying causes, such as police border controls and procedures or considerations of infrastructural, operational, technical and administrative nature, without taking into account the time that cannot be attributed to the border crossing, such as operational procedures carried out in facilities located in the proximity of the border crossing but not intrinsically related to it;

Removed(Ex AM 221( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 18 – paragraph 1 – point b a (new): (b a) at least 90% of the passenger trains crossing at least one border of a European Transport Corridor arrive at their destination, or at the external Union border if their destination is outside the Union, at their scheduled time or with a delay of less than 30 minutes.

Removed(Ex AM 222( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 18 – paragraph 2: 2. Member States shall modify, as appropriate, contractual agreements referred to in Article 30 of Directive 2012/34/EU and take appropriate measures in accordance with Regulation (EU) No 913/2010 to meet the target values set out in points (a), (b) and (ba) of the first paragraph.

Removed(Ex AM 223( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedArticle 18 – paragraph 2 a (new): 2 a. The Commission, in close cooperation with all the rail stakeholders, shall ensure that a digital capacity management system, which enables passenger and freight operators to book a cross-border train path across several Member States, will be developed by 31 December 2025. The capacity management system shall be operated by the European Railway Agency. Member States shall fully deploy the system on the European Transport Corridors, core and extended core networks by 31 December 2027.

Removed(Ex AM 224( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Sources & citation

Where the facts on this page come from, and how to cite it.

Data source
Licensed CC BY 4.0.
Retrieved
30 September 2026

Cite as

European Parliament (2024). “Changes between A-9-2023-0147 and TA-9-2024-0317”. Text, 24 April 2024. from A-9-2023-0147, to TA-9-2024-0317. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=8 (retrieved 30 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2024-04-24,
  author = {{European Parliament}},
  title = {{Changes between A-9-2023-0147 and TA-9-2024-0317}},
  year = {2024},
  date = {2024-04-24},
  howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=8}},
  url = {https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=8},
  urldate = {2026-09-30},
  publisher = {EU Parl Watch Research},
  note = {Text. from A-9-2023-0147, to TA-9-2024-0317. Data: European Parliament Open Data (CC BY 4.0)}
}