Text · Comparison of two versions
Changes from plenary report to adopted text
A-9-2023-0147 → TA-9-2024-0317
- From
- A-9-2023-0147 Plenary report of 14 Apr 2023
- To
- TA-9-2024-0317 Adopted text of 24 Apr 2024
- Changes
- Not comparable
- Paragraphs
- +9 added · −1 254 removed · 1 changed
More facts (2)
- Title (from)
- on the proposal for a regulation of the European Parliament and of the Council Guidelines for the development of the trans-European transport network, amending Regulation (EU) 2021/1153 and Regulation (EU) No 913/2010 and repealing Regulation (EU) 1315/2013
- Title (to)
- Trans-European transport network
These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.
Every difference
The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.
Part 7 of 23: Paragraphs 361–420
RemovedArticle 12 – paragraph 1 – point i a (new): (i a) ensuring that sufficient capacity for rail passenger and freight is reserved on the corridors, with a fair share for each, following the integration of Rail Freight Corridors into the European Transport Corridors;
Removed(Ex AM 163( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 12 – paragraph 1 – point i b (new): (i b) seeking synergies across all modes of transport, including active modes, and removing barriers to active mobility, when infrastructure is being upgraded or newly built;
Removed(Ex AM 164( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 12 – paragraph 1 – point i c (new): (i c) adapting, where necessary, the infrastructure to a dual use in order to address both civilian and defence needs, paying particular attention to strategic infrastructure of the Union;
Removed(Ex AM 165( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 12 – paragraph 1 – point i d (new): (i d) updating and, where relevant, constructing new infrastructure, notably to increase capacity for more sustainable modes of transport in accordance with paragraph 1 point (a) of this Article.
Removed(Ex AM 166( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 12 – paragraph 2 – point a: (a) contributing to transport emission reduction and increased energy security by promoting the use of zero- and low-emission vehicles and vessels and renewable and low-carbon fuels, through the deployment of corresponding alternative fuels infrastructure in accordance with Regulation (EU) […][on the deployment of alternative fuels infrastructure];
Removed(Ex AM 167( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 12 – paragraph 2 – point b: (b) mitigating exposure of urban and rural areas to negative effects of transiting rail and road transport;
Removed(Ex AM 168( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 12 – paragraph 2 – point d a (new): (d a) ensuring equal access for all market participants on the TEN-T infrastructure.
Removed(Ex AM 169( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 12 – paragraph 2 – point d b (new): (d b) significant reduction of border waiting times for road freight transport;
Removed(Ex AM 170( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 12 – paragraph 2 – point d c (new): (d c) accelerating the construction of "projected new construction lines" in cross-border sections, through a single entity management and a fast track procedure, in order to increase rail freight traffic;
Removed(Ex AM 171( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 12 – paragraph 2 – point d d (new): (d d) increasing the resilience of the network, with a focus on critical infrastructure and dual-use infrastructure;
Removed(Ex AM 172( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 13 – paragraph 1 – point a: (a) the development of a high performance and seamless fully interoperable rail freight network across the Union;
Removed(Ex AM 173( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 13 – paragraph 1 – point c: (c) the development of a seamless inland waterways, aviation and maritime infrastructure system for passengers and freight;
Removed(Ex AM 174( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 13 – paragraph 1 – point d: (d) the development of a safe and secure road network, with sufficient alternative fuel infrastructures, and safe and secure truck parking areas;
Removed(Ex AM 175( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 13 – paragraph 1 – point e: (e) the development of multimodal and interoperable transport solutions;
Removed(Ex AM 176( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 13 – paragraph 1 – point g: (g) the deployment of the necessary infrastructure which ensures a seamless circulation of zero- and low-emission vehicles, vessels and aircrafts, using alternative fuels as defined in Regulation (EU)[…] [on the deployment of alternative fuels infrastructure];
Removed(Ex AM 177( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 13 – paragraph 1 – point g a (new): (g a) the deployment of ICT systems on all modes on the network in order to ensure an efficient use of the infrastructure;
Removed(Ex AM 178( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 13 – paragraph 1 – point g b (new): (g b) the improvement of connections between the trans-European transport network and the infrastructure networks of neighbouring countries, as well as the improvement of transeuropean transport infrastructure on the territory of neigbouring countries.
Removed(Ex AM 179( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 13 – paragraph 1 a (new): (1a) By ... [date six months after the entry into force of this Regulation], the Commission shall complete a study on connecting all Union Capitals, chosen major cities and metropolitan areas with a railway high speed line network. The study shall be developed in cooperation with the Member States which will consult with stakeholders, and especially railway infrastructure managers. The study shall identify the financial instruments to finance the construction of the network. The conclusions of the study shall become the basis for the Member States to develop a European high speed network.
Removed(Ex AM 180( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 14 – paragraph 1 – point f a (new): (f a) infrastructure related to alternative fuels facilities , as defined in Regulation (EU) […] [on the deployment of alternative fuels infrastructure];
Removed(Ex AM 181( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 15 – paragraph 2 – introductory part: 2. Member States shall ensure that the railway infrastructure of the comprehensive network by 31 December 2050:
Removed(Ex AM 182( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 15 – paragraph 2 – point a: (a) is electrified as regards line tracks and, to the extent necessary for electric train operations, as regards sidings;
Removed(Ex AM 183( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 15 – paragraph 2 – point b: Deleted / (see EC amended proposal - point 6)
Removed(Ex AM 184( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 15 – paragraph 2 – point d – point i: (i) on double track lines, at least 50% of the train paths for freight trains, and not less than two train paths per hour and direction, can be allocated to freight trains with a length of at least 740 m; in order to ensure seamless cross border operations, those train paths shall be aligned accordingly,
Removed(Ex AM 185( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 15 – paragraph 2 – subparagraph 1 (new): At the request of a Member State, in duly justified cases including reasons of cost-efficiency of the service, exemptions for the comprehensive network to the requirements under paragraph 2, first subparagraph, points (a), (d), and (e) may be granted by the Commission by means of implementing acts. Any request for exemption shall be based on a socio-economic cost-benefit analysis and an assessment of the impact on interoperability. An exemption shall comply with the requirements of Directive (EU) 2016/797 of the European Parliament and of the Council1a, be coordinated with and agreed by the neighbouring Member State(s) where applicable. / 1a Directive (EU) 2016/797 of the European Parliament and of the Council of 11 May 2016 on the interoperability of the rail system within the European Union (OJ L 138, 26.5.2016, p. 44).
Removed(Ex AM 186( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 15 – paragraph 2 a (new): 2 a. Without prejudice to paragraph 2, second subparagraph, Member States shall ensure that on the railway infrastructure of the comprehensive network, as of 1 December 2040, in case of construction of a new line, the requirement set out in paragraph 2, point (a), is complied with.
Removed(Ex AM 187( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 15 – paragraph 3: 3. Isolated networks are exempted from the requirements under paragraph 2. (see EC amended proposal - point 6) / deleted / deleted / (deleted)
Removed(Ex AM 188( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 16 – paragraph 2 – introductory part: 2. Member States shall ensure that the railway infrastructure of the extended core network by 31 December 2040:
Removed(Ex AM 189( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 16 – paragraph 2 – point -a (new): (-a) is fully electrified as regards line tracks and, to the extent necessary for electric train operations, as regards sidings;
Removed(Ex AM 190( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 16 – paragraph 2 – point a: (a) meets the requirements set out in Article 15(2), points (c), (d) and (e) / (see EC amended proposal - point 7)
Removed(Ex AM 191( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedArticle 16 – paragraph 2 – point a a (new): (a a) allows for a prevailing minimum operational line speed of 100 km/h for freight trains on the freight lines of the extended core network;
Removed(Ex AM 192( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
Sources & citation
Where the facts on this page come from, and how to cite it.
- Permalink
- https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=7
- Data source
- Licensed CC BY 4.0.
- Retrieved
- 30 September 2026
Cite as
European Parliament (2024). “Changes between A-9-2023-0147 and TA-9-2024-0317”. Text, 24 April 2024. from A-9-2023-0147, to TA-9-2024-0317. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=7 (retrieved 30 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2024-04-24,
author = {{European Parliament}},
title = {{Changes between A-9-2023-0147 and TA-9-2024-0317}},
year = {2024},
date = {2024-04-24},
howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=7}},
url = {https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=7},
urldate = {2026-09-30},
publisher = {EU Parl Watch Research},
note = {Text. from A-9-2023-0147, to TA-9-2024-0317. Data: European Parliament Open Data (CC BY 4.0)}
}