Skip to content

Text · Comparison of two versions

Changes from plenary report to adopted text

A-9-2023-0147 → TA-9-2024-0317

From
A-9-2023-0147 Plenary report of 14 Apr 2023
To
TA-9-2024-0317 Adopted text of 24 Apr 2024
Changes
Not comparable
Paragraphs
+9 added · −1 254 removed · 1 changed
More facts (2)
Title (from)
on the proposal for a regulation of the European Parliament and of the Council Guidelines for the development of the trans-European transport network, amending Regulation (EU) 2021/1153 and Regulation (EU) No 913/2010 and repealing Regulation (EU) 1315/2013
Title (to)
Trans-European transport network

These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.

Every difference

The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.

Part 18 of 23: Paragraphs 1021–1080

Removed(Ex AM 477( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 2 – table – section ES: Maritime port: Core

Removed(Ex AM 478( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 2 – table – section ES: Node name: Vilagarcía de Arousa / Maritime port: Comprehensive

Removed(Ex AM 1741( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 2 - table - section ES: Maritime port: Core (Bahía de Cádiz)

Removed(Ex AM 1745( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 2 - table - section ES: Maritime port: Core

Removed(Ex AM 1749( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 2 - table - section ES: Maritime port: Core / Rail road terminals: Básica (San Roque)

Removed(Ex AM 1750( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 2 - table - section ES: Maritime port: Core

Removed(Ex AM 1752( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 2 - table - section ES: Maritime port: Core

Removed(Ex AM 483( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 2 – table – section FI: Node Name: Kaskinen / Maritime port: Comprehensive

Removed(Ex AM 484( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 2 – table – section FI: Maritime port: Core (Oulu)

Removed(Ex AM 1774( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 2 - table - section FI: Maritime port: Core

Removed(Ex AM 1776( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 2 - table - section FI (new): Node name: Pietarsaari / Maritime port: Comprehensive

Removed(Ex AM 479( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 2 – table – section HR: Maritime port: Core

Removed(Ex AM 480( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 2 – table – section IT: Node name: Lecce / Urban node: X

Removed(Ex AM 1766( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 2 - table - section IT: Airport: Comprehensive

Removed(Ex AM 481( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 2 – table – section IT: Rail Road Terminals: Core (Marzaglia Multimodal Terminal)

Removed(Ex AM 1768( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 2 - table - section PL: Rail road terminals: core (Bydgoszcz, Bydgoszcz – Południe)

RemovedAnnex 2 - table - section RO: Maritime port: core (Constanţa/Midia)

Removed(Ex AM 485( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed(Ex AM 486( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

Removed(Ex AM 487( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 3 – part 1/14: Add the following to the map of European Transport corridors: / Prolong the Western Balkans Corridor from Durres (ALB) accross the Adriatic Sea to Bari (IT) and connect, via Tirrana (ALB), to Skopje (MK) and Sofia (BG).

Removed(Ex AM 488( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 3 – part 1/14: Add the following to the corridor Western Balkans : / - Sofia - Skopje - Durres - Igoumenitsa (entire section)

Removed(Ex AM 1789( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 3 - part 2/14: Add the following to the Atlantic Corridor: / - Madrid – Adanero – Tordesillas – Benavente – Ponferrada – Lugo – A Coruña (Road) / - Astorga – León – Carrión de los Condes – Burgos (Road) / - A Coruña – Gijón – Santander - Bilbao (Road) / - Santiago – Vigo (Rail freight) / - Port of Bahía de Cádiz / - Sevilla – Huelva – Faro (Rail passengers)

Removed(Ex AM 1790( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 3 - part 2/14: Add the following to the corridor Atlantic Corridor: / - Santander - Bilbao (rail freight and passengers)

Removed(Ex AM 1795( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 3 - part 5/14: Add the following to the corridor North Sea - Baltic Corridor : / - Zwolle (NL) - Münster (DE) rail passenger line

Removed(Ex AM 489( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 3 - part 6/14 - part 7/14: Add the followingto the Scandinavian-Mediterranean Corridor: / - Villa San Giovanni - Messina motorway, passengers’s rail line, freight rail line (bridge - fixed link).

Removed(Ex AM 490( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 3 – part 7/14: Add the following to the Scandinavian -Mediterranean corridor: / - Stockholm-Oslo railway (rail passengers line)

Removed(Ex AM 491( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 3 - part 7/14 and part 8/14: Add the following to the corridor Baltic Sea - Adriatic Sea: / - Rijeka - Zagreb motorway / - port of Rijeka (“core”) / -Rijeka - Zagreb rail freight/passenger line

Removed(Ex AM 492( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 3 - part 9/14: Add the following to the corridor Rhine-Danube Corridor: / - Nürnberg - Sulzbach - Rosenberg - Amberg - Schwandorf rail freight and rail passengers line / The above rail line shall be included in the core network as specified in Annex 1

Removed(Ex AM 493( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 3 – part 9/14: Add the following to the corridor Rhine-Danube / - Craiova - Alexandria Bucureşti

Removed(Ex AM 494( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 3 – part 9/14: Delete the following from the corridor Rhine-Danube: / - Craiova -Pitesti

Removed(Ex AM 1802( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 3 – part 9/14: Add the following to the corridor Rhine - Danube: / - Ruse - Razgrad - Shumen - Provadia - Devnya - Varna (inland waterways / The above lines shall be included in the core and/or the comprehensive network as specified in Annex

Removed(Ex AM 1811( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

Sources & citation

Where the facts on this page come from, and how to cite it.

Data source
Licensed CC BY 4.0.
Retrieved
30 September 2026

Cite as

European Parliament (2024). “Changes between A-9-2023-0147 and TA-9-2024-0317”. Text, 24 April 2024. from A-9-2023-0147, to TA-9-2024-0317. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=18 (retrieved 30 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2024-04-24,
  author = {{European Parliament}},
  title = {{Changes between A-9-2023-0147 and TA-9-2024-0317}},
  year = {2024},
  date = {2024-04-24},
  howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=18}},
  url = {https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=18},
  urldate = {2026-09-30},
  publisher = {EU Parl Watch Research},
  note = {Text. from A-9-2023-0147, to TA-9-2024-0317. Data: European Parliament Open Data (CC BY 4.0)}
}