Text · Comparison of two versions
Changes from plenary report to adopted text
A-9-2023-0147 → TA-9-2024-0317
- From
- A-9-2023-0147 Plenary report of 14 Apr 2023
- To
- TA-9-2024-0317 Adopted text of 24 Apr 2024
- Changes
- Not comparable
- Paragraphs
- +9 added · −1 254 removed · 1 changed
More facts (2)
- Title (from)
- on the proposal for a regulation of the European Parliament and of the Council Guidelines for the development of the trans-European transport network, amending Regulation (EU) 2021/1153 and Regulation (EU) No 913/2010 and repealing Regulation (EU) 1315/2013
- Title (to)
- Trans-European transport network
These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.
Every difference
The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.
Part 17 of 23: Paragraphs 961–1020
Removed(Ex AM 1689( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)
RemovedAnnex 1 – part 16/23 and part 17/23: Add the following to the core network: / - Port of Bahía de Cádiz
Removed(Ex AM 1692( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)
RemovedAnnex 1 – part 16/23 and part 17/23: Add the following to the comprehensive network: / - Granada – Motril (passenger and freight rail / Conventional / New Constr.)
Removed(Ex AM 1694( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)
RemovedAnnex 1 – part 16/23 and part 17/23: Add high speed for rail freight and passenger to the following to the core network: / Pamplona (ES)-Ezkio/Itxaso (ES)
Removed(Ex AM 1695( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)
RemovedAnnex 1 – part 16/23 and part 17/23: Add the following to the extended core network: / - Pau - Huesca (freight and passenger)
Removed(Ex AM 1696( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)
RemovedAnnex 1 – part 16/23 and part 17/23: Add high speed for rail freight and passenger to the following to the core network: / Bilbao (ES)-Santander (ES)
Removed(Ex AM 458( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 17/23: Add the following to the core network: / - Santiago - Ourense (passenger rail/ ≥ 200 km/h)
Removed(Ex AM 459( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 17/23: Add the following to the core network: / - Utrera- Granada- Almería (passenger and freight rail/ ≥ 200 km/h)
Removed(Ex AM 1701( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)
RemovedAnnex 1 – part 17/23: Add the following to the core network: / - Medina del Campo – Salamanca – Fuentes de Oñoro (passenger rail / ≥ 200 km/h) / - Madrid – Adanero – Tordesillas – Benavente – Ponferrada – Lugo – A Coruña (Road) / - Astorga – León – Carrión de los Condes – Burgos (Road) / - Port of Bahía de Cádiz / - Vigo - Porto (passenger rail/ ≥ 200 km/h)
Removed(Ex AM 1703( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)
RemovedAnnex 1 – part 17/23: Add the following to the extended core network: / - Sevilla – Huelva – Faro (passenger rail / ≥ 200 km/h / New Constr.) / - Córdoba - Jaén – Granada (Conventional) / - Madrid – Alcázar de San Juan – Jaén (Conventional) / - Bilbao – Santander (passenger and freight rail / ≥ 200 km/h / New Constr.)
Removed(Ex AM 462( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 18/23: Add the following to the core network: / - Bussoleno - Avigliana ( ≥ 200 km/h) / - Orbassano - Torino S.Paolo ( ≥ 200 km/h)
Removed(Ex AM 463( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 18/23: Add the following to the core network: / - Bologna – Ancona ( ≥ 200 km/h)
Removed(Ex AM 464( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 18/23: Add the following to the extended core network: / - Ancona – Foggia ( ≥ 200 km/h)
Removed(Ex AM 460( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 18/23 and part 19/23: Add the following to the extended core network: / - Zagreb (HR) - Maribor (SI) - Graz (AT) railfreight / passenger (conventional/new construction
Removed(Ex AM 461( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – parts 18/23and 19/23: Add the following to the comprehensive network: / - Pula - Buzet (HR) - Divača (SI) - Trieste (IT) rail freight/passenger line Lupoglav – Buzet - state border (SI) - Prešnica (SI)
Removed(Ex AM 465( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – parts 18/23 and 19/23: Add the following to the core network: / - Battipaglia - Praia a mare rail freight line and rail passenger line
Removed(Ex AM 466( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 18/23 and part 19/23: Add the following to the core network: / - Bolzano and Rovereto rail freight bypasses (conventional).
Removed(Ex AM 1852( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1268\1268304EN.docx)
RemovedAnnex 1 – part 18/23 and part 19/23: Add the following to the comprehensive network: / - Caltanissetta - Marsala/Agrigento/Licata/Gela/Pozzallo rail freight line, rail passengers’ line (conventional)
Removed(Ex AM 467( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 19/23: Add the following to the core network: / - Bussoleno - Avigliana ( ≥ 200 km/h) / - Orbassano - Torino S.Paolo ( ≥ 200 km/h)
Removed(Ex AM 468( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 19/23: Add the following to the core network: / - Bologna – Ancona ( ≥ 200 km/h)
Removed(Ex AM 469( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 19/23: Add the following to the extended core network: / - Ancona – Foggia ( ≥ 200 km/h)
Removed(Ex AM 470( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 19/23: Include the following sections as high-speed (≥ 250 km/h) rail passengers lines: / - Milano – Treviglio (core network) / - Treviglio – Verona (core network)
Removed(Ex AM 471( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 19/23: Add the following to the extended core network: / - Bari - Brindisi - Lecce passengers rail line (conventional) / - Bologna - Foggia passengers rail line (high speed) / - Pisa – Roma passengers rail line (conventional) / - Rosignano Marittimo - Civitavecchia motorway.
Removed(Ex AM 1723( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)
RemovedAnnex 1 – part 19/23: Add the following to the comprehensive network: / Rijeka - Divača (SI) - Trieste (IT) road connection Kanfanar – Umag – State border - (SI) road connection
Removed(Ex AM 472( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 21/23: Add the following to the core network: / - Craiova-Caracal-Alexandria-Bucureşti / Add Galati as Rail-Road Terminal
Removed(Ex AM 473( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 1 – part 21/23: Add the following to comprehensive network / - Craiova - Pitesti
Removed(Ex AM 482( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 2 – table – section AT: Rail road terminals: core (Villach -Fürnitz)
Removed(Ex AM 474( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 2 – table – section DE: Deletion of the node.
Removed(Ex AM 475( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 2 – table – section DE: Deletion of the node.
Removed(Ex AM 476( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)
RemovedAnnex 2 – table – section DE: Deletion of the node.
Removed(Ex AM 1731( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)
RemovedAnnex 2 - table - section DE: Maritime port: Core
Sources & citation
Where the facts on this page come from, and how to cite it.
- Permalink
- https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=17
- Data source
- Licensed CC BY 4.0.
- Retrieved
- 30 September 2026
Cite as
European Parliament (2024). “Changes between A-9-2023-0147 and TA-9-2024-0317”. Text, 24 April 2024. from A-9-2023-0147, to TA-9-2024-0317. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=17 (retrieved 30 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2024-04-24,
author = {{European Parliament}},
title = {{Changes between A-9-2023-0147 and TA-9-2024-0317}},
year = {2024},
date = {2024-04-24},
howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=17}},
url = {https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=17},
urldate = {2026-09-30},
publisher = {EU Parl Watch Research},
note = {Text. from A-9-2023-0147, to TA-9-2024-0317. Data: European Parliament Open Data (CC BY 4.0)}
}