Skip to content

Text · Comparison of two versions

Changes from plenary report to adopted text

A-9-2023-0147 → TA-9-2024-0317

From
A-9-2023-0147 Plenary report of 14 Apr 2023
To
TA-9-2024-0317 Adopted text of 24 Apr 2024
Changes
Not comparable
Paragraphs
+9 added · −1 254 removed · 1 changed
More facts (2)
Title (from)
on the proposal for a regulation of the European Parliament and of the Council Guidelines for the development of the trans-European transport network, amending Regulation (EU) 2021/1153 and Regulation (EU) No 913/2010 and repealing Regulation (EU) 1315/2013
Title (to)
Trans-European transport network

These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.

Every difference

The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.

Part 16 of 23: Paragraphs 901–960

RemovedRegulation (EU) No 913/2010

RemovedArticle 65 – paragraph 1 – point 8, Article 11 – paragraph 3: 3. The cooperation and the consultation between all parties shall address in particular:

Removed(Ex AM 435( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedRegulation (EU) No 913/2010

RemovedArticle 65 – paragraph 1 – point 8, Article 11 – paragraph 3 – point c: (c) need for targeted investments to upgrade infrastructure according to the TEN-T requirements and to remove local bottlenecks, such as connecting loops, improvements to nodes and last-mile infrastructure or technical equipment enhancing operational performance.’

Removed(Ex AM 436( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedRegulation (EU) No 913/2010

RemovedArticle 65 – paragraph 1 – point 10, Article 22 – paragraph 1: 1. Every two years from the time of the establishment of a freight corridor, the executive board referred to in Article 8(1) shall present to the Commission the results of the implementation plan for that corridor. The Commission shall analyse those results and notify the Committee referred to in Article 21 of its analysis.’

Removed(Ex AM 437( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 2/23: Add the following to the core network: / - Galati as Rail-Road Terminal (RRT)

Removed(Ex AM 1631( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 1 – part 2/23: Add the following to the core network: / - Buzau - Galati

Removed(Ex AM 438( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 3/23: Add the following to the core network: / - Craiova - Caracal - Alexandria - București

Removed(Ex AM 439( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 3/23: Add the following to comprehensive network: / - Craiova - Pitești

Removed(Ex AM 440( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 9/23: Add the following to comprehensive network: / - Colmar - Freiburg rail passengers line

Removed(Ex AM 441( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 9/23: Add the following to the comprehensive network: / - Haguenau - Roeschwoog - Rastatt rail passengers line

Removed(Ex AM 442( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 11/23: Add the following to the comprehensive network: / - Zwolle (NL) - Münster (DE) rail passenger line

Removed(Ex AM 443( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 11/23: Add the following to the comprehensive network: / - Railway from Emmen (NL) to Rheine (DE)

Removed(Ex AM 444( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 11/23: Add the following to the extended core network: / - Amsterdam (NL) - Groningen (NL) - Bremen (DE) rail passenger line

Removed(Ex AM 1648( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 1 – part 11/23: Add the following to the Extended Core network: / - Include the railway connection ‘Lelylijn’ from Amsterdam to Groningen (NL)

Removed(Ex AM 447( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 12/23: Add the following to the comprehensive network: / - Berlin – Küstrin-Kietz – Kostrzyn rail freight line (conventional/ new construction)

Removed(Ex AM 448( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 12/23: Add the following to the comprehensive network: / - Karlsruhe (DE) Wörth - Lauterbourg (FR)- Strasbourg (FR)

Removed(Ex AM 449( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 12/23: Add the following to the core network: / - Nürnberg - Amberg - Furth im Wald rail freight line (conventional/new construction

Removed(Ex AM 1659( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 1 – part 12/23: Add the following to the core network: / - Lübeck – Travemünde Skandinavienkai rail freight line (conventional/new construction)

Removed(Ex AM 1660( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 1 – part 12/23: Add the following to the core network: / - Neumünster – Bad Oldesloe rail freight line (conventional/new construction)

Removed(Ex AM 445( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 12/23 and part 13/23: Add the following to the comprehensive network: / - Colmar-Freiburg rail passenger line (conventional/new construction)

Removed(Ex AM 446( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 12/23 and part 13/23: Add the following to the comprehensive network: / - Rastatt-Hagenau rail passenger line (conventional/new construction)

Removed(Ex AM 450( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 13/23: Add the following to the extended core network: / - Berlin -Kostrzyn(conventional / new construction)

Removed(Ex AM 451( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 13/23: Add the following to the extended core network: / - Amsterdam (NL) - Groningen (NL) - Bremen (DE) rail passenger line

Removed(Ex AM 452( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 13/23: Add the following to the core network: / - Nürnberg - Amberg - Furth im Wald rail passenger line (conventional/new construction)

Removed(Ex AM 453( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 16/23: Add the following to the core network: / - Zaragoza-Tardienta (freight rail)

Removed(Ex AM 454( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 16/23: Add the following to the core network: / - Zaragoza-Lleida-Tarragona (freight/conventional)

Removed(Ex AM 455( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 16/23: Add the following to the core network: / - Santiago - Vigo - Ourense (rail freight / ≥ 200 km/h / New Constr.)

Removed(Ex AM 1678( Or. en) of FdR \\epadesres\commis\IPOL\TRAN\AM\1271\1271201EN.docx)

RemovedAnnex 1 – part 16/23: Add the following to the core network: / - El Ferrol - A Coruña (rail freight / ≥ 200 km/h.) / - El Ferrol - Lugo - Monforte (rail freight / ≥ 200 km/h.)

Removed(Ex AM 456( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 16/23 and part 17/23: Add the following to the extended core network: / - Astorga – Zamora – Salamanca – Plasencia (passenger and freight rail / New Constr.)

Removed(Ex AM 457( Or. en) of FdR \\ipolbrusnvf01\TRAN\docep\AM\1274380EN.docx)

RemovedAnnex 1 – part 16/23 and part 17/23: Add the following to the core network: / - Alicante - San Isidro (freight and passenger/≥ 200 km/h)

Sources & citation

Where the facts on this page come from, and how to cite it.

Data source
Licensed CC BY 4.0.
Retrieved
30 September 2026

Cite as

European Parliament (2024). “Changes between A-9-2023-0147 and TA-9-2024-0317”. Text, 24 April 2024. from A-9-2023-0147, to TA-9-2024-0317. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=16 (retrieved 30 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2024-04-24,
  author = {{European Parliament}},
  title = {{Changes between A-9-2023-0147 and TA-9-2024-0317}},
  year = {2024},
  date = {2024-04-24},
  howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=16}},
  url = {https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0147/compare/TA-9-2024-0317?all=1&part=16},
  urldate = {2026-09-30},
  publisher = {EU Parl Watch Research},
  note = {Text. from A-9-2023-0147, to TA-9-2024-0317. Data: European Parliament Open Data (CC BY 4.0)}
}