Skip to content

Text · Comparison of two versions

Changes from plenary report to adopted text

A-9-2023-0032 → TA-9-2024-0282

From
A-9-2023-0032 Plenary report of 16 Feb 2023
To
TA-9-2024-0282 Adopted text of 11 Apr 2024
Changes
Not comparable
Paragraphs
+8 added · −1 419 removed · 2 changed
More facts (2)
Title (from)
on the proposal for a regulation of the European Parliament and of the Council on the internal markets for renewable and natural gases and for hydrogen (recast)
Title (to)
Internal markets for renewable gas, natural gas and hydrogen (recast)

These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.

Every difference

The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.

Part 18 of 27: Paragraphs 1021–1080

Removed2.2.1. General provisions

Removed1. The provisions of point 2.2 shall apply to interconnection points between adjacent entry-exit systems, irrespective of whether they are physical or virtual, between two or more Member States or within the same Member State in so far as the points are subject to booking procedures by users. They may also apply to entry points from and exit points to third countries, subject to the decision of the relevant national regulatory authority. Exit points to end-consumers and distribution networks, entry points from LNG terminals and production facilities, and entry-exit points from and to storage facilities are not subject to the provisions of point 2.2.

Removed2. On the basis of the information published by the transmission system operators pursuant to Section 3 of this Annex and, where appropriate, validated by national regulatory authorities, ACER shall publish a monitoring report on congestion at interconnection points with respect to firm capacity products sold in the preceding year, taking into consideration to the extent possible capacity trading on the secondary market and the use of interruptible capacity.

RemovedThe monitoring report shall be published every two years. ACER shall publish additional reports based on a substantiated request from the Commission up to once per year.

Removed3. Any additional capacity made available through the application of one of the congestion-management procedures as provided for in points 2.2.2, 2.2.3, 2.2.4 and 2.2.5 shall be offered by the respective transmission system operator(s) in the regular allocation process.

Removed2.2.2. Capacity increase through oversubscription and buy-back scheme

Removed1. Transmission system operators shall propose and, after approval by the national regulatory authority, implement an incentive-based oversubscription and buy-back scheme in order to offer additional capacity on a firm basis. Before implementation, the national regulatory authority shall consult with the national regulatory authorities of adjacent Member States and take account of the adjacent national regulatory authorities’ opinions. Additional capacity is defined as the firm capacity offered in addition to the technical capacity of an interconnection point calculated on the basis of Article 5 (1) of this Regulation.

Removed2. The oversubscription and buy-back scheme shall provide transmission system operators with an incentive to make available additional capacity, taking account of the technical conditions, such as the calorific value, temperature and expected consumption, of the relevant entry-exit system and the capacities in adjacent networks. Transmission system operators shall apply a dynamic approach with regard to the recalculation of the technical or additional capacity of the entry-exit system.

Removed3. The oversubscription and buy-back scheme shall be based on an incentive regime reflecting the risks of transmission system operators in offering additional capacity. The scheme shall be structured in such a way that revenues from selling additional capacity and costs arising from the buy-back scheme or measures pursuant to point 6 are shared between the transmission system operators and the network users. National regulatory authorities shall decide on the distribution of revenues and costs between the transmission system operator and the network user.

Removed4. For the purpose of determining transmission system operators’ revenues, technical capacity, in particular surrendered capacity as well as, where relevant, capacity arising from the application of firm day-ahead use-it-or- lose-it and long term use-it-or-lose-it mechanisms, shall be considered to be allocated prior to any additional capacity.

Removed5. In determining the additional capacity, the transmission system operator shall take into account statistical scenarios for the likely amount of physically unused capacity at any given time at interconnection points. It shall also take into account a risk profile for offering additional capacity which does not lead to excessive buy-back obligation. The oversubscription and buy-back scheme shall also estimate the likelihood and the costs of buying back capacity on the market and reflect this in the amount of additional capacity to be made available.

Removed6. Where necessary to maintain system integrity, transmission system operators shall apply a market-based buy-back procedure in which network users can offer capacity. Network users shall be informed about the applicable buy-back procedure. The application of a buy-back procedure is without prejudice to the applicable emergency measures.

Removed7. Transmission system operators shall, before applying a buy-back procedure, verify whether alternative technical and commercial measures can maintain system integrity in a more cost-efficient manner.

Removed8. When proposing the oversubscription and buy-back scheme the transmission system operator shall provide all relevant data, estimates, and models to the national regulatory authority in order for the latter to assess the scheme. The transmission system operator shall regularly report to the national regulatory authority on the functioning of the scheme and, upon request of the national regulatory authority, provide all relevant data. The national regulatory authority may request the transmission system operator to revise the scheme.

Removed2.2.3. Firm day-ahead use-it-or-lose-it mechanism

Removed1. National regulatory authorities shall require transmission system operators to apply at least the rules laid down in point 3 per network user at interconnection points with respect to altering the initial nomination if, on the basis of the yearly monitoring report of ACER in accordance with point 2.2.1(2), it is shown that at interconnection points demand exceeded offer, at the reserve price when auctions are used, in the course of capacity allocation procedures in the year covered by the monitoring report for products for use in either that year or in one of the subsequent two years:

Removed(a) for at least three firm capacity products with a duration of one month; or

Removed(b) for at least two firm capacity products with a duration of one quarter; or

Removed(c) for at least one firm capacity product with a duration of one year or more; or

Removed(d) where for at least six months no firm capacity product with a duration of one month or more has been offered.

Removed2. If, on the basis of the yearly monitoring report, it is shown that a situation as defined in point 1 is unlikely to reoccur in the following three years, for example as a result of capacity becoming available from physical expansion of the network or termination of long-term contracts, the relevant national regulatory authorities may decide to terminate the firm day-ahead use-it-or-lose-it mechanism.

Removed3. Firm renomination is permitted up to 90 % and down to 10 % of the contracted capacity by the network user at the interconnection point. However, if the nomination exceeds 80 % of the contracted capacity, half of the non-nominated volume may be renominated upwards. If the nomination does not exceed 20 % of the contracted capacity, half of the nominated volume may be renominated downwards. The application of this point is without prejudice to the applicable emergency measures.

Removed4. The original holder of the contracted capacity may renominate the restricted part of its contracted firm capacity on an interruptible basis.

Removed5. Point 3 shall not apply to network users –— persons or undertakings and the undertakings they control pursuant to Article 3 of Regulation (EC) No 139/2004 – holding less than 10% of the average technical capacity in the preceding year at the interconnection point.

Removed6. On interconnection points where a firm day-ahead use-it-or-lose-it mechanism in accordance with point 3 is applied, an evaluation of the relationship with the oversubscription and buy-back scheme pursuant to point 2.2.2 shall be carried out by the national regulatory authority, which may result in a decision by the national regulatory authority not to apply the provisions of point 2.2.2 at those interconnection points. Such a decision shall be notified, without delay, to ACER and the Commission.

Removed7. A national regulatory authority may decide to implement a firm day-ahead use-it-or-lose-it mechanism pursuant to point 3 on an interconnection point. Before adopting its decision, the national regulatory authority shall consult with the national regulatory authorities of adjacent Member States. In adopting its decision, the national regulatory authority shall take account of the adjacent national regulatory authorities’ opinions.

Removed2.2.4. Surrender of contracted capacity

RemovedTransmission system operators shall accept any surrender of firm capacity which is contracted by the network user at an interconnection point, with the exception of capacity products with a duration of a day and shorter. The network user shall retain its rights and obligations under the capacity contract until the capacity is reallocated by the transmission system operator and to the extent the capacity is not reallocated by the transmission system operator. Surrendered capacity shall be considered to be reallocated only after all the available capacity has been allocated. The transmission system operator shall notify the network user without delay of any reallocation of its surrendered capacity. Specific terms and conditions for surrendering capacity, in particular for cases where several network users surrender their capacity, shall be approved by the national regulatory authority.

Removed2.2.5. Long term use-it-or-lose-it mechanism

Removed1. National regulatory authorities shall require transmission system operators to partially or fully withdraw systematically underutilised contracted capacity on an interconnection point by a network user where that user has not sold or offered under reasonable conditions its unused capacity and where other network users request firm capacity. Contracted capacity is considered to be systematically underutilised in particular if:

Removed(a) the network user uses less than on average 80% of its contracted capacity both from 1 April until 30 September and from 1 October until 31 March with an effective contract duration of more than one year for which no proper justification could be provided; or

Removed(b) the network user systematically nominates close to 100% of its contracted capacity and renominates downwards with a view to circumventing the rules laid down in point 2.2.3(3).

Removed2. The application of a firm day-ahead use-it-or-lose-it mechanism shall not be regarded as justification to prevent the application of point 1.

Removed3. Withdrawal shall result in the network user losing its contracted capacity partially or completely for a given period or for the remaining effective contractual term. The network user shall retain its rights and obligations under the capacity contract until the capacity is reallocated by the transmission system operator and to the extent the capacity is not reallocated by the transmission system operator.

Removed4. Transmission system operators shall regularly provide national regulatory authorities with all the data necessary to monitor the extent to which contracted capacities with effective contract duration of more than one year or recurring quarters covering at least two years are used.

Removed3. Definition of the technical information necessary for network users to gain effective access to the natural gas system, the definition of all relevant points for transparency requirements and the information to be published at all relevant points and the time schedule according to which this information shall be published.

Removed3.1. Definition of the technical information necessary for network users to gain effective access to the system

Removed3.1.1. Form of publication

Removed1. Transmission system operators (TSOs) shall provide all information referred to under point 3.1.2 and points 3.3(1) to 3.3(5) in the following manner:

Removed(a) on a website accessible to the public, free of charge and without any need to register or otherwise sign on with the transmission system operator;

Removed(b) on a regular/rolling basis; the frequency shall be according to the changes that take place and the duration of the service;

Removed(c) in a user-friendly manner;

Removed(d) in a meaningful, quantifiably clear and easily accessible way and on a non-discriminatory basis;

Removed(e) in a downloadable format that has been agreed between transmission system operators and the national regulatory authorities — on the basis of an opinion on a harmonised format that shall be provided by ACER — and that allows for quantitative and comparative analyses;

Removed(f) in consistent units, in particular kWh (with a combustion reference temperature of 298,15 K) shall be the unit for energy content and m 3 (at 273,15 K and 1,01325 bar) shall be the unit for volume. The constant conversion factor to energy content shall be provided. In addition to the format above, publication in other units is also possible;

Removed(g) in the official language(s) of the Member State and in English;

Removed(h) all data shall be made available on one Union-wide central platform, established by ENTSOG on a cost-efficient basis.

Removed2. Transmission system operators shall provide details on actual changes to all information referred to under point 3.1.2 and points 3.3(1) to 3.3(5) in a timely manner as soon as available to them.

Removed3.1.2. Content of publication

Removed1. Transmission system operators shall publish at least the following information about their systems and services:

Removed(a) a detailed and comprehensive description of the different services offered and their charges;

Removed(b) the different types of transportation contracts available for these services;

Removed(c) the network code and/or the standard conditions outlining the rights and responsibilities of all network users including:

Removed(i) harmonised transportation contracts and other relevant documents;

Removed(ii) if relevant for access to the system, for all relevant points as defined in point 3.2 of this Annex, a specification of relevant gas quality parameters, including at least the gross calorific value, Wobbe index and oxygen content, and the liability or costs of conversion for network users in case gas is outside these specifications;

Removed(iii) if relevant for access to the system, for all relevant points information on pressure requirements;

Removed(iv) the procedure in the event of an interruption of interruptible capacity, including, where applicable, the timing, extent, and ranking of individual interruptions (for example pro-rata or first-come-last-interrupted);

Removed(d) the harmonised procedures applied when using the transmission system, including the definition of key terms;

Removed(e) provisions on capacity allocation, congestion management and anti-hoarding and reutilisation procedures;

Removed(f) the rules applicable for capacity trade on the secondary market vis-à-vis the transmission system operator;

Sources & citation

Where the facts on this page come from, and how to cite it.

Data source
Licensed CC BY 4.0.
Retrieved
30 September 2026

Cite as

European Parliament (2024). “Changes between A-9-2023-0032 and TA-9-2024-0282”. Text, 11 April 2024. from A-9-2023-0032, to TA-9-2024-0282. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0032/compare/TA-9-2024-0282?all=1&part=18 (retrieved 30 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2024-04-11,
  author = {{European Parliament}},
  title = {{Changes between A-9-2023-0032 and TA-9-2024-0282}},
  year = {2024},
  date = {2024-04-11},
  howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0032/compare/TA-9-2024-0282?all=1&part=18}},
  url = {https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0032/compare/TA-9-2024-0282?all=1&part=18},
  urldate = {2026-09-30},
  publisher = {EU Parl Watch Research},
  note = {Text. from A-9-2023-0032, to TA-9-2024-0282. Data: European Parliament Open Data (CC BY 4.0)}
}