Text · Comparison of two versions
Changes from plenary report to adopted text
A-9-2023-0032 → TA-9-2024-0282
- From
- A-9-2023-0032 Plenary report of 16 Feb 2023
- To
- TA-9-2024-0282 Adopted text of 11 Apr 2024
- Changes
- Not comparable
- Paragraphs
- +8 added · −1 419 removed · 2 changed
More facts (2)
- Title (from)
- on the proposal for a regulation of the European Parliament and of the Council on the internal markets for renewable and natural gases and for hydrogen (recast)
- Title (to)
- Internal markets for renewable gas, natural gas and hydrogen (recast)
These two texts have too little in common to be compared paragraph by paragraph (under 15 % of their paragraphs match): they are different documents rather than versions of one — for example a group’s motion and the joint text that was adopted.
Every difference
The full paragraph comparison, packaging included; long runs of unchanged paragraphs are folded. One part of the text per page.
Part 12 of 27: Paragraphs 661–720
RemovedBefore granting an exemption, the regulatory authority shall decide upon the rules and mechanisms for management and allocation of capacity. The rules shall require that all potential users of the infrastructure are invited to indicate their interest in contracting capacity before capacity allocation in the new infrastructure, including for own use, takes place. The regulatory authority shall require congestion management rules to include the obligation to offer unused capacity on the market, and shall require users of the infrastructure to be entitled to trade their contracted capacities on the secondary market. In its assessment of the criteria referred to in paragraph 1, points (a), (b) and (e), the regulatory authority shall take into account the results of that capacity allocation procedure.
RemovedThe exemption decision, including any conditions referred to in the second subparagraph of this paragraph, shall be duly reasoned and published.
Removed7. When analysing whether a major new infrastructure is expected to enhance the security of supply pursuant to paragraph 1, point (a), the relevant authority shall consider to what extent the new infrastructure is expected to improve Member States’ compliance with their obligations under Regulation (EU) 2017/1938 of the European Parliament and of the Council, both at regional and national level.
Removed8. Member States shall provide that their regulatory authority or ACER, as the case may be, shall submit, for the purposes of the formal decision, to the relevant body in the Member State its opinion on the request for an exemption. That opinion shall be published together with the decision.
Removed9. The regulatory authority shall transmit to the Commission, without delay, a copy of every request for exemption as of its receipt. The exemption decision shall be notified, without delay, by the competent authority to the Commission, together with all the relevant information. That information may be submitted to the Commission in aggregate form, enabling the Commission to assess the exemption decision. In particular, the information shall contain:
Removed(a) the detailed reasons on the basis of which the regulatory authority, or Member State, granted or refused the exemption together with a reference to the relevant point or points of paragraph 1 on which that decision is based, including the financial information justifying the need for the exemption;
Removed(b) the analysis undertaken of the effect on competition and the effective functioning of the internal market resulting from the grant of the exemption;
Removed(c) the reasons for the duration of the exemption and the share of the total capacity of the infrastructure for which the exemption is granted;
Removed(d) where the exemption relates to an interconnector, the result of the consultation with the regulatory authorities concerned;
Removed(e) the contribution of the infrastructure to the diversification of supply.
Removed10. Within 50 working days of the day following that of receipt of the notification under paragraph 7, the Commission may adopt a decision requesting the notifying bodies to amend or withdraw the decision to grant an exemption. Before adopting the decision on the exemption, the Commission may seek an opinion of the European Scientific Advisory Board on Climate Change established under Article 10a of Regulation (EC) No 401/2009 as to whether the exemption contributes to achieving the Union’s climate and energy targets. That period may be extended by an additional 50 working days where further information is requested by the Commission. The additional period shall begin on the day following receipt of the complete information. The initial period may also be extended by consent of both the Commission and the notifying bodies.
RemovedWhere the requested information is not provided within the period set out in the request, the notification shall be deemed to be withdrawn unless, before the expiry of that period, either the period has been extended with the consent of both the Commission and the regulatory authority, or the regulatory authority, in a duly reasoned statement, has informed the Commission that it considers the notification to be complete.
RemovedThe regulatory authority shall comply with the Commission decision to amend or withdraw the exemption decision within a period of one month and shall inform the Commission accordingly.
RemovedThe Commission shall preserve the confidentiality of commercially sensitive information.
RemovedWhen the Commission approves an exemption decision, that approval shall lose its effect:
Removed(a) after two years from its adoption where the construction of the infrastructure has not yet started,
Removed(b) after five years from its adoption where the infrastructure has not become operational within that period, unless the Commission decides that any delay is due to major obstacles beyond control of the natural or legal person to whom the exemption has been granted.
Removed11. The Commission is empowered to adopt delegated acts in accordance with Article 63 in order to set guidelines for the application of the conditions laid down in paragraph 1 of this Article and for the procedure to be followed for the application of paragraphs 3, 6, 8 and 9 of this Article.
Removed11a. The exemptions granted by ... [the date of entry into force of this Regulation] shall remain valid.
Removed1. The Commission shall be assisted by the [name of the committee] established by Article 84 of [the recast Gas Directive as proposed in COM(2021)xxx]. That committee shall be a committee within the meaning of Regulation (EU) No 182/2011.
Removed2. Where reference is made to this paragraph, Article 4 of regulation (EU) No 182/2011 shall apply.
Removed3. Where reference is made to this paragraph, Article 5 of Regulation (EU) No 182/2011 shall apply.
RemovedThis Regulation shall not apply to natural gas transmission systems situated in Member States for the duration of derogations granted under Article 80 of [new Gas Directive].
RemovedAs regards the derogations granted under Article 81 (of recast Gas Directive XXXX) the Commission shall, by ... [three months after the date of entry into force of this Regulation] submit a report to the European Parliament and to the Council on derogations granted under that Article of [recast Gas Directive]. Thereafter, the Commission shall submit such a report upon the request of at least one Member State. The report shall, in particular, assess the impact of derogations on the effective functioning of and competition in the internal market in natural gas as well as on security of energy supply and the essential security interests of the Union and the Member States, taking into account the principle of energy solidarity and the REPowerEU Plan objectives. If the report finds that a derogation granted presents a threat to the effective functioning of or competition in the internal market in natural gas, to security of energy supply or the essential security interests of the Union or the Member States, the Commission shall, within one month of the submission of the report, adopt a decision requiring the relevant competent authority to revoke the derogation. Following any such revocation, the relevant Member State shall ensure that the enforcement of rules set out in this Regulation and [recast Gas Directive] takes into account their effective application on Union territory and the integrated nature of the transmission line.
Removed1. The power to adopt delegated acts is conferred on the Commission subject to the conditions laid down in this Article.
Removed2. The power to adopt delegated acts referred to in Articles 28, 53, 54, 56 and 60 shall be conferred on the Commission for a period of five years from ... [date of entry into force]. The Commission shall draw up a report in respect of the delegation of power not later than nine months before the end of the five-year period. The delegation of power shall be tacitly extended for periods of an identical duration, unless the European Parliament or the Council opposes such extension not later than three months before the end of each period.
Removed3. The delegation of power referred to in Articles 28, 53, 54, 56 and 60 may be revoked at any time by the European Parliament or by the Council. A decision to revoke shall put an end to the delegation of power specified in that decision. It shall take effect on the day following the publication of the decision in the Official Journal of the European Union or at a later date specified therein. It shall not affect the validity of any delegated acts already in force.
Removed4. Before adopting a delegated act, the Commission shall consult experts designated by each Member State in accordance with the principles laid down in the Interinstitutional Agreement of 13 April 2016 on Better Law-Making.
Removed5. As soon as it adopts a delegated act, the Commission shall notify it simultaneously to the European Parliament and to the Council.
Removed6. A delegated act adopted pursuant to Article ▌ 28, 53, 54, 56 or 60 shall enter into force only if no objection has been expressed either by the European Parliament or the Council within a period of two months of notification of that act to the European Parliament and the Council or if, before the expiry of that period, the European Parliament and the Council have both informed the Commission that they will not object. That period shall be extended by two months at the initiative of the European Parliament or of the Council.
RemovedThe notification obligations for intergovernmental agreements in the field of energy relating to gas as laid down in Decision (EU) 2017/684 shall be construed as including intergovernmental agreements relating to hydrogen, including hydrogen compounds such as ammonia and liquid organic hydrogen carriers.
RemovedRegulation (EU) 2019/942 is amended as follows:
Removed(1) Article 2, point (a) is replaced by the following:
Removed‘(a) issue opinions and recommendations addressed to transmission system operators, the ENTSO for Electricity, the ENTSOG&H, the EU DSO Entity, regional coordination centres, nominated electricity market operators, and entities established by transmission system operators for gas, LNG system operators, gas or hydrogen storage system operators or operators of networks for hydrogen;’;
Removed(2) Article 3(2), the first subparagraph is replaced by the following:
Removed‘At ACER's request, the regulatory authorities, the ENTSO for Electricity, the ENTSOG&H, the regional coordination centres, the EU DSO entity, the transmission system operators, hydrogen network operators, the nominated electricity market operators, and entities established by transmission system operators for gas, LNG system operators, gas or hydrogen storage system operators or hydrogen terminal, gas or hydrogen market operators and gas and hydrogen suppliers provide to ACER the information in the same level of detail necessary for the purpose of carrying out ACER's tasks under this Regulation, unless ACER has already requested and received such information.’;
Removed(3) Articles 4(1), 4(2), 4(3)(a) and (b) are replaced by the following:
Removed‘1. ACER shall provide an opinion to the Commission on the draft statutes, list of members and draft rules of procedure of the ENTSO for Electricity in accordance with Article 29(2) of Regulation (EU) 2019/943 and on those of the ENTSOG&H in accordance with Article 22(2) of [Gas Regulation] ▌and on those of the EU DSO entity in accordance with Article 53(3) of Regulation (EU) 2019/943 and Article 37(4) of [the recast Gas Regulation as proposed in COM(2021) 804].
Removed2. ACER shall monitor the execution of the tasks of the ENTSO for Electricity in accordance with Article 32 of Regulation (EU) 2019/943, of the ENTSOG&H in accordance with Article 24 of [the recast Gas Regulation as proposed in COM(2021) 804] ▌and of the EU DSO entity as set out in Article 55 of Regulation (EU) 2019/943 and Article 38 of [the recast Gas Regulation as proposed in COM(2021) 804].
Removed3. ACER may provide an opinion:
Removed(a) to the ENTSO for Electricity in accordance with point (a) of Article 30(1) of Regulation (EU) 2019/943 and to the ENTSOG&H in accordance with Article 23(2) of [the recast Gas Regulation as proposed in COM(2021)804 ▌on the network codes;
Removed(b) to the ENTSO for Electricity in accordance with Article 32(2) of Regulation (EU) 2019/943, to the ENTSOG&H in accordance with the Article 24(2) of [the recast Gas Regulation as proposed in COM(2021)xxx] ▌on the draft Union-wide network development plan and on other relevant documents referred to in Article 30(1) of Regulation (EU) 2019/943 Articles 23(3) and 42(1) of [the recast Gas Regulation as proposed in COM(2021)804], taking into account the objectives of non-discrimination, effective competition and the efficient and secure functioning of the internal markets for electricity and natural gas;’;
Removed(4) Articles 4(6), 4(7) and 4(8) are replaced by the following:
Removed‘6. The relevant regulatory authorities shall coordinate in order to jointly identify whether there is non-compliance of the ENTSO for Electricity, the ENTSOG&H, the EU DSO entity or regional coordination centres with their obligations under Union law, and shall take appropriate action in accordance with Article 59(1) point (c) and Article 62(1) point (f) of Directive (EU) 2019/944 or with Article 72(1) point (e) of [the recast Gas Directive as proposed in COM(2021) 803].
RemovedAt the request of one or more regulatory authorities or at its own initiative, ACER shall issue a reasoned opinion as well as a recommendation to the ENTSO for Electricity, the ENTSOG&H, the EU DSO entity or the regional coordination centres with regard to compliance with their obligations.’;
Removed7. Where a reasoned opinion of ACER identifies a case of potential non-compliance of the ENTSO for Electricity, the ENTSOG&H, the EU DSO entity or a regional coordination centre with their respective obligations, the regulatory authorities concerned shall unanimously take coordinated decisions establishing whether there is non-compliance with the relevant obligations and, where applicable, determining the measures to be taken by the ENTSO for Electricity, the ENTSOG&H, the EU DSO entity or the regional coordination centre to remedy that non-compliance. Where the regulatory authorities fail to take such coordinated decisions unanimously within four months of the date of receipt of ACER's reasoned opinion, the matter shall be referred to ACER for a decision pursuant to Article 6(10).
Removed8. Where the non-compliance by the ENTSO for Electricity, the ENTSOG&H, the EU DSO entity or a regional coordination centre that was identified pursuant to paragraph 6 or 7 of this Article has not been remedied within three months, or where the regulatory authority in the Member State in which the entity has its seat has not taken action to ensure compliance, ACER shall issue a recommendation to the regulatory authority to take action in accordance with Article 59(1) point (c) and Article 62(1) point (f) of Directive (EU) 2019/944 or with Article 74(1) point (d) of [the recast Gas Directive as proposed in COM(2021) xxx, in order to ensure that the ENTSO for Electricity, the ENTSOG&H, the EU DSO entity or the regional coordination centre comply with their obligations, and shall inform the Commission.’;
Removed(5) Article 5(1) is replaced by the following:
Removed‘1. ACER shall participate in the development of network codes in accordance with Article 59 of Regulation (EU) 2019/943 and Articles 53 and 54 of [the recast Gas Regulation as proposed in COM(2021) 804] and of guidelines in accordance with Article 61(6) of Regulation (EU) 2019/943 and Article 56(5) of [the recast Gas Regulation as proposed in COM(2021) 804]. It shall in particular:
Removed(a) submit non-binding framework guidelines to the Commission where it is requested to do so under Article 59(4) of Regulation (EU) 2019/943 or Articles 53(4) or 54(4) of [the recast Gas Regulation as proposed in COM(2021) 804]. ACER shall review the framework guidelines and re-submit them to the Commission where requested to do so under Article 59(7) of Regulation (EU) 2019/943 or Articles 53(7) or 54(7) of [the recast Gas Regulation as proposed in COM(2021) 804];
Removed(b) revise the network code in accordance with Article 59(11) of Regulation (EU) 2019/943 or Articles 53(11) or 54(11) of [the recast Gas Regulation as proposed in COM(2021) 804]. In its revision, ACER shall take account of the views provided by the parties involved during the drafting of that revised network code led by the ENTSO for Electricity, the ENTSOG&H or the EU DSO entity, and shall consult the relevant stakeholders on the version to be submitted to the Commission. For this purpose, ACER may use the committee established under the network codes where appropriate. ACER shall report to the Commission on the outcome of the consultations. Subsequently, ACER shall submit the revised network code to the Commission in accordance with Article 59(11) of Regulation (EU) 2019/943 or Articles 53(11) or 54(11) of [the recast Gas Regulation as proposed in COM(2021) 804]. Where the ENTSO for Electricity, the ENTSOG&H or the EU DSO entity have failed to develop a network code, ACER shall prepare and submit a draft network code to the Commission where it is requested to do so under Article 59(12) of Regulation (EU) 2019/943 or Articles 53(12) or 54(12) of [the recast Gas Regulation as proposed in COM(2021) 804];
Removed(c) provide a duly reasoned opinion to the Commission, in accordance with Article 32(1) of Regulation (EU) 2019/943 or Articles 24(1) or 46(2) of [the recast Gas Regulation as proposed in COM(2021) 804], where the ENTSO for Electricity, the ENTSOG&H or the EU DSO entity has failed to implement a network code elaborated under Article 30(1), point (a) of Regulation (EU) 2019/943 or Articles 23(1) or 42(1), point (a) of [the recast Gas Directive as proposed in COM(2021) xxx] or a network code which has been established in accordance with Article 59(3) to (12) of Regulation (EU) 2019/943 or Articles 53(3) to (12) or 54(3) to (12) of [the recast Gas Regulation as proposed in COM(2021) 804] but which has not been adopted by the Commission under Article 59(13) of Regulation (EU) 2019/943 or under Articles 53(13) or 54(13) of [the recast Gas Regulation as proposed in COM(2021 804];
Removed(d) monitor and analyse the implementation of the network codes adopted by the Commission in accordance with Article 59 of Regulation (EU) 2019/943 and Articles 53 and 54 of [the recast Gas Regulation as proposed in COM(2021) 804] and the guidelines adopted in accordance with Article 61 of Regulation (EU) 2019/943 and Article 56 of [the recast Gas Regulation as proposed in COM(2021) 804], and their effect on the harmonisation of applicable rules aimed at facilitating market integration as well as on non-discrimination, effective competition and the efficient functioning of the market, and report to the Commission.’;
Removed(6) Article 6(3), first subparagraph is replaced by the following:
Removed‘3. By 5 July 2022, and every four years thereafter the Commission shall submit a report to the European Parliament and the Council on the independence of regulatory authorities pursuant to Article 57(7) of Directive (EU) 2019/944 and Article 70(6) of [the recast Gas Directive as proposed in COM(2021) 803].’;
Removed(7) In Article 6 the following paragraphs (9a), (9b), (9c) and (9d) are inserted:
Removed‘(9a) ACER shall issue recommendations to regulatory authorities and network operators related to regulated asset bases pursuant to Article 4(4) of [Gas Regulation].
Removed(9b) ACER may issue recommendations to regulatory authorities on the allocation of costs of solutions for restrictions to cross-border flows due to gas quality differences pursuant to Article 19(8) of [the recast Gas Regulation as proposed in COM (2021)804] and due to the disruption of the gas supply.
Removed(9c) ACER may issue recommendations to regulatory authorities on the allocation of costs of solutions for restrictions to cross-border flows due to hydrogen quality differences pursuant to Article 39(8) of [the recast Gas Regulation as proposed in COM(2021) 804].
Removed(9d) ACER shall publish monitoring reports on congestion at interconnection points pursuant to Annex I, section 2.2.1, point 2 of [the recast Gas Regulation as proposed in COM(2021) 804].’;
Sources & citation
Where the facts on this page come from, and how to cite it.
- Permalink
- https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0032/compare/TA-9-2024-0282?all=1&part=12
- Data source
- Licensed CC BY 4.0.
- Retrieved
- 30 September 2026
Cite as
European Parliament (2024). “Changes between A-9-2023-0032 and TA-9-2024-0282”. Text, 11 April 2024. from A-9-2023-0032, to TA-9-2024-0282. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0032/compare/TA-9-2024-0282?all=1&part=12 (retrieved 30 September 2026). Data: European Parliament Open Data, https://data.europarl.europa.eu/ (CC BY 4.0).
BibTeX
@misc{epw-text-2024-04-11,
author = {{European Parliament}},
title = {{Changes between A-9-2023-0032 and TA-9-2024-0282}},
year = {2024},
date = {2024-04-11},
howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0032/compare/TA-9-2024-0282?all=1&part=12}},
url = {https://news.eu-parl.st-solutions.dev/texts/A-9-2023-0032/compare/TA-9-2024-0282?all=1&part=12},
urldate = {2026-09-30},
publisher = {EU Parl Watch Research},
note = {Text. from A-9-2023-0032, to TA-9-2024-0282. Data: European Parliament Open Data (CC BY 4.0)}
}