On the joint text on the draft general budget of the European Union for the financial year 2027 approved by the Conciliation Committee under the budgetary procedure

Report A-10-2026-0305 · 11547/2026 – C100218/2026 – 2026/0196(BUD)

Kind
Plenary report A-10-2026-0305
Date
17 November 2026
Committee
European Parliament delegation to the Conciliation Committee
Rapporteur
Nils Ušakovs (Section III – Commission)
More facts (2)
Reference
11547/2026 – C100218/2026 – 2026/0196(BUD)
More

In short

A summary of the text written by AI; ¶ opens the paragraph it rests on.

AI: In short Written by AI from the official text — check the source · deepseek-flash · 21 Nov 2026

Parliament's legislative resolution approves the joint text on the 2027 EU budget agreed by the Conciliation Committee and confirms the annexed joint statements. The 2027 budget sets commitment appropriations at EUR 199 707,5 million and payment appropriations at EUR 211 525,8 million, leaving margins of EUR 710,1 million and EUR 949,7 million below the MFF ceilings. It mobilises the Flexibility Instrument, the Single Margin Instrument and the EURI instrument, and sets spending levels for each expenditure heading, agencies and 26 pilot projects and preparatory actions. It approves Draft Amending Budget No. 3/2026 and includes joint statements on monitoring payment appropriations and on the possible use of the Ukraine Support Loan instrument in 2027.

Position. The delegation to the Conciliation Committee proposes that Parliament approve the joint text on the 2027 budget, confirm the annexed joint statements and declare the budget definitively adopted.

Key points

  1. Parliament approves the joint text on the 2027 budget and confirms the joint statements annexed to the resolution.
  2. Commitment appropriations for 2027 are set at EUR 199 707,5 million, leaving a margin of EUR 710,1 million below the MFF ceilings.
  3. Payment appropriations for 2027 are set at EUR 211 525,8 million, leaving a margin of EUR 949,7 million below the MFF ceiling.
  4. The Flexibility Instrument is mobilised for EUR 1 990,2 million, of which EUR 1 943,5 million for sub-heading 2b and EUR 46,7 million for the Ukraine Support Loan.
  5. The Single Margin Instrument is mobilised for EUR 1 035,4 million under Article 11(1)(a) and EUR 478,6 million under Article 11(1)(c), the latter offset against 2026 and 2027 margins.
  6. Decentralised agency budgets are set at the Commission's proposed level, with increases for EASA, the BEREC Office and EPPO and a decrease for the EU Centre on Child Sexual Abuse.
  7. A package of 26 pilot projects and preparatory actions, of which 19 are new, is agreed for EUR 69,7 million in commitment appropriations.
  8. Commitment appropriations are set for each heading, including EUR 22 007,5 million for heading 1, EUR 58 483,6 million for sub-heading 2a and EUR 17 281,3 million for sub-heading 2b.
  9. Further heading levels are set: EUR 57 113,4 million for heading 3, EUR 5 811,6 million for heading 4, EUR 3 078,5 million for heading 5 and EUR 15 537,9 million for heading 6.
  10. Heading 7 is set at EUR 13 869,7 million with no margin, mobilising the Single Margin Instrument for EUR 910,7 million; posts are adjusted for the Court of Auditors, Ombudsman, Data Protection Supervisor and EEAS.
  11. Ukraine Support Loan debt service costs are set at EUR 650 million, financed by the Flexibility Instrument and the Single Margin Instrument.
  12. Draft Amending Budget No. 3/2026 is approved, and joint statements call on the Commission to monitor 2027 payments and to propose a draft amending budget if needed.

Who is affected

  • EU institutions and bodies, whose 2027 budgets and establishment plans are set, including post changes for several institutions.
  • Decentralised agencies, whose EU contributions and posts are set at the Commission's proposed level with listed exceptions.
  • Member states, which are expected to provide accurate forecasts and may face a shortened eight-week period for budget decisions.
  • The Commission, which is asked to monitor programme implementation and present updated payment figures and, if needed, a draft amending budget.

Figures and deadlines

  • Commitment appropriations: EUR 199 707,5 million; margin below MFF ceilings: EUR 710,1 million.
  • Payment appropriations: EUR 211 525,8 million; margin below MFF ceiling: EUR 949,7 million.
  • Flexibility Instrument: EUR 1 990,2 million, of which EUR 1 943,5 million for sub-heading 2b and EUR 46,7 million for the Ukraine Support Loan.
  • Single Margin Instrument: EUR 1 035,4 million under Article 11(1)(a) and EUR 478,6 million under Article 11(1)(c).
  • Pilot projects and preparatory actions: 26 in total, of which 19 new, for EUR 69,7 million.
  • Heading 7: EUR 13 869,7 million, with the Single Margin Instrument mobilised for EUR 910,7 million.
  • Ukraine Support Loan debt service costs: EUR 650 million.
  • Payment appropriations decrease by EUR 22,1 million compared with the Draft Budget as amended by Amending Letter 1/2027.

Legal basis. Article 314 of the Treaty on the Functioning of the European Union and Article 106a of the Treaty establishing the European Atomic Energy Community.

Read the text · Report a problem

Text

The text as parsed from the official Word file. Every paragraph has a link (¶) and can be saved to a project as a passage.

Draft european parliament legislative resolution

(11547/2026 – C100218/2026 – 2026/0196(BUD))

The European Parliament,

–having regard to the joint text approved by the Conciliation Committee including the relevant Parliament, Council and Commission statements (11547/2026 – C100218/2026),

–having regard to the draft general budget of the European Union for the financial year 2027, which the Commission adopted on 10 June 2026 (COM(2026)0300),

–having regard to the position on the draft general budget of the European Union for the financial year 2027, which the Council adopted on 11 September 2026 and forwarded to Parliament on the same day (11547/2026 – C100218/2026),

–having regard to Letter of amendment No 1/2027 to the draft general budget of the European Union for the financial year 2027, which the Commission presented on 9 October (COM(2026)0960),

–having regard to its resolution of 21 October 2026 on the Council position on the draft general budget of the European Union for the financial year 2027 and to the budget amendments contained therein,

–having regard to Article 314 of the Treaty on the Functioning of the European Union,

–having regard to Article 106a of the Treaty establishing the European Atomic Energy Community,

–having regard to Council Decision (EU, Euratom) 2020/2053 EU of 14 December 2020 on the system of own resources of the European Union and repealing Decision 2014/335/EU, Euratom,

− having regard to Regulation (EU, Euratom) 2024/2509 of the European Parliament and of the Council of 23 September 2024 on the financial rules applicable to the general budget of the Union (recast),

–having regard to Council Regulation (EU, Euratom) 2020/2093 of 17 December 2020 laying down the multiannual financial framework for the years 2021-2027 and to the joint declarations agreed between Parliament, the Council and the Commission in this context and the related unilateral declarations,

– having regard to Council Regulation (EU, Euratom) 2022/2496 of 15 December 2022 amending Regulation (EU, Euratom) 2020/2093 laying down the multiannual financial framework for the years 2021 to 2027,

– having regard to the Council Regulation (EU, Euratom) 2024/765 amending Regulation (EU, Euratom) 2020/2093 laying down the multiannual financial framework for the years 2021 to 2027 (MFF Revision),

–having regard to the Interinstitutional Agreement of 16 December 2020 between the European Parliament, the Council of the European Union and the European Commission on budgetary discipline, on cooperation in budgetary matters and on sound financial management, as well as on new own resources, including a roadmap towards the introduction of new own resources,

–having regard to Rule 97 and Rule 98 of its Rules of Procedure,

– having regard to the report of its delegation to the Conciliation Committee (A10-0305/2026),

1.Approves the joint text;

2.Confirms the joint statement by the European Parliament and the Council and the joint statement by the European Parliament, the Council and the Commission annexed to this resolution;

3.Instructs its President to declare that the general budget of the European Union for the financial year 2027 has been definitively adopted and to arrange for its publication in the Official Journal of the European Union;

4.Instructs its President to forward this legislative resolution to the Council, the Commission, the other institutions and bodies concerned and the national parliaments.

Back matter, 2

Parts that accompany the text rather than belong to it: explanatory statement, annexes, opinions appended by other committees. Collapsed.

Annex 120 blocks

FINAL Budget 2027 – Elements for joint conclusions

These joint conclusions cover the following sections:

1. Budget 2027

2. Budget 2026 – Draft Amending Budget No. 3/2026

3. Statements

Summary overview

According to the elements for joint conclusions:

- The overall level of commitment appropriations in the 2027 budget is set at EUR 199 707,5 million. Overall, this leaves a margin below the MFF ceilings for 2027 of EUR 710,1 million in commitment appropriations.

- The overall level of payment appropriations in the 2027 budget is set at EUR 211 525,8 million. Overall, this leaves a margin below the MFF ceiling for 2027 of EUR 949,7 million in payment appropriations.

- The Flexibility Instrument for 2027 is mobilised in commitment appropriations for an amount of EUR 1 990,2 million, of which EUR 1 943,5 million for sub-heading 2b Resilience and Values and EUR 46,7 million for the Ukraine Support Loan.

- In accordance with Article 11(1) a of the MFF Regulation, the Single Margin Instrument is mobilised in commitment appropriations for an amount of EUR 1 035,4 million, of which EUR 910,7 million for heading 7 European Public Administration and EUR 124,7 million for the Ukraine Support Loan.

- In accordance with Article 11(1) c of the MFF Regulation, the Single Margin Instrument is mobilised in commitment appropriations for an amount of EUR 478,6 million for the Ukraine Support Loan. The mobilisation is offset as follows: EUR 297,1 million against remaining 2026 margins and EUR 181,4 million against the margin in heading 6 in 2027.

The 2027 payment appropriations related to the mobilisation of the Flexibility Instrument in the years 2024 to 2027 are estimated by the Commission at EUR 2 047,5 million. The estimated payment schedule of the related outstanding amounts for these years is detailed in the following table:

Table from the text: block 14
Flexibility Instrument - payment profile (in EUR million)
Mobilisation year20272028Beyond 2028Total
202446,30,00,046,3
20259,45,70,015,1
20261,71,60,03,2
20271 990,20,00,01 990,2
Total2 047,57,20,02 054,7

1. Budget 2027

1.1. ‘Closed’ lines

Unless stated otherwise below in these conclusions, all budget lines are confirmed as proposed by the Commission in the Draft Budget for 2027 as amended in Amending Letter No.1/2027.

Additionally, unless stated otherwise, all budget lines amended by the Council and agreed by the Parliament in its reading are confirmed as amended by the Council.

For the other budget lines, the Conciliation Committee has agreed on the conclusions included in sections 1.2 to 1.7 below.

1.2. Horizontal issues

Decentralised agencies

The EU contribution (in commitment and payment appropriations) and the number of establishment plan posts for all decentralised agencies are set at the level proposed by the Commission in the Draft Budget for 2027 as amended in Amending Letter No.1/2027, with the following exceptions:

Under heading 1:

For the European Union Aviation Safety Agency (EASA, budget article 02 10 01), for which the level of commitment and payment appropriations is increased by EUR 1,5 million.

For the Agency for Support for BEREC (BEREC Office, budget line 02 10 05), for which the level of commitment and payment appropriations is increased by EUR 0,5 million.

Under sub-heading 2b:

The European Public Prosecutor’s Office (EPPO, budget article 07 10 08), for which the level of commitment and payment appropriations is increased by EUR 2,0 million.

Under heading 4:

For the European Border and Coast Guard Agency (Frontex, budget article 11 10 01), 10 positions for Seconded National Experts are transformed into contract agent positions. This change has no budgetary impact.

Under heading 5:

For the EU Centre on Child Sexual Abuse (CSA, budget line 30 02 02, reserve for Article 12 10 04), for which the level of commitment and payment appropriations is decreased by EUR 10,0 million.

Under heading 7:

For the Translation Centre for bodies of the European Union (CdT, budget line 20 10 01), for which the level of commitment and payment appropriations is decreased by EUR 0,3 million.

Executive agencies

The EU contribution (in commitment and payment appropriations) and the number of establishment plan posts for executive agencies are set at the level proposed by the Commission in the Draft Budget for 2027 as amended in Amending Letter No.1/2027.

Pilot Projects/Preparatory Actions

A comprehensive package of 26 pilot projects/preparatory actions (PP/PA), of which 19 new, for a total amount of EUR 69,7 million in commitment appropriations is agreed as proposed by the Parliament.

This package respects the ceilings for pilot projects and preparatory actions set out in the Financial Regulation.

1.3. Expenditure headings of the financial framework - commitment appropriations

After taking into account the above conclusions on agencies and pilot projects and preparatory actions, the Conciliation Committee has agreed on the following:

Heading 1 – Single Market, Innovation and Digital

Commitment appropriations are set at the level proposed by the Commission in the Draft Budget, as amended by Amending Letter 1/2027 but with the following adjustments, agreed by the Conciliation Committee, set out in the table below:

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
1.0.11Horizon Europe12 751 475 51312 772 975 51321 500 000
01 02 02 10Cluster ‘Health’760 906 035767 656 0356 750 000
01 02 02 20Cluster ‘Culture, Creativity and Inclusive Society’315 749 388317 749 3882 000 000
01 02 02 41Cluster ‘Digital, Industry and Space’ — European High-Performance Computing Joint Undertaking (EuroHPC)307 775 829312 775 8295 000 000
01 02 02 50Cluster ‘Climate, Energy and Mobility’1 263 747 5751 268 497 5754 750 000
01 02 02 60Cluster ‘Food, Bioeconomy, Natural Resources, Agriculture and Environment’1 042 288 9811 045 288 9813 000 000
1.0.221Connecting Europe Facility (CEF) - Transport1 682 823 0501 700 323 05017 500 000
02 03 01Connecting Europe Facility (CEF) — Transport1 669 539 7991 687 039 79917 500 000
1.0.222Connecting Europe Facility (CEF) - Energy1 079 948 4231 084 948 4235 000 000
02 03 02Connecting Europe Facility (CEF) — Energy1 074 435 2661 079 435 2665 000 000
1.0.23Digital Europe Programme1 063 723 9201 064 723 9201 000 000
02 04 01 11European Cybersecurity Industrial, Technology and Research Competence Centre91 793 17192 793 1711 000 000
1.0.2DAGDecentralised agencies260 248 239262 248 2392 000 000
02 10 01European Union Aviation Safety Agency (EASA)49 050 44650 550 4461 500 000
02 10 05Agency for Support for BEREC (BEREC Office)8 975 6719 475 671500 000
1.0.31Single Market Programme (incl. SMEs)700 128 208707 128 2087 000 000
03 02 02Improving the competitiveness of enterprises, particularly SMEs, and supporting their access to markets137 142 000144 142 0007 000 000
PPPAPilot projects and preparatory actions57 850 000
TotalTotal111 850 000

As a consequence, the agreed level of commitment appropriations is set at EUR 22 007,5 million, leaving a margin of EUR 72,5 million under the expenditure ceiling of heading 1.

Sub-heading 2a – Economic, social and territorial Cohesion

Commitment appropriations are set at the level proposed by the Commission in the Draft Budget as amended in Amending Letter No. 1/2027 but with the following adjustments, agreed by the Conciliation Committee, set out in the table below:

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
PPPAPilot projects and preparatory actions250 000
TotalTotal250 000

As a consequence, the agreed level of commitment appropriations is set at EUR 58 483,6 million, leaving a margin of EUR 0,4 million under the expenditure ceiling of heading 2a.

Sub-heading 2b – Resilience and Values

Commitment appropriations are set at the level proposed by the Commission in the Draft Budget, as amended by Amending Letter 1/2027 but with the following adjustments, agreed by the Conciliation Committee, set out in the table below:

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
2.2.13Support to the Turkish-Cypriot Community36 197 00037 197 0001 000 000
05 04 01Financial support for encouraging the economic development of the Turkish Cypriot community33 966 20734 966 2071 000 000
2.2.21European Recovery and Resilience Facility (incl. Technical Support Instrument)112 241 00062 241 000- 50 000 000
06 02 02Technical Support Instrument110 000 00060 000 000- 50 000 000
2.2.24Union Civil Protection Mechanism (RescEU)180 015 271193 515 27113 500 000
06 05 01Union Civil Protection Mechanism180 015 271193 515 27113 500 000
2.2.25EU4Health635 057 918636 057 9181 000 000
06 06 01EU4Health Programme605 768 985606 768 9851 000 000
2.2.32Erasmus+4 511 360 9504 525 360 95014 000 000
07 03 01 01Promoting learning mobility of individuals and groups, and cooperation, inclusion and equity, excellence, creativity and innovation at the level of organisations and policies in the field of education and training — Indirect management3 112 467 1033 126 467 10314 000 000
2.2.34Creative Europe417 348 436418 348 4361 000 000
07 05 02Media strand226 405 577227 405 5771 000 000
2.2.352Rights and Values311 239 270312 239 2701 000 000
07 06 02Citizens’ engagement and participation in the democratic life of the Union58 604 96559 604 9651 000 000
2.2.3DAGDecentralised agencies360 608 655362 608 6552 000 000
07 10 08European Public Prosecutor’s Office (EPPO)102 556 619104 556 6192 000 000
2.2.3SPECActions financed under the prerogatives of the Commission and specific competences conferred to the Commission189 332 190191 332 1902 000 000
07 20 04 09Information and training measures for workers’ organisations23 286 34825 286 3482 000 000
PPPAPilot projects and preparatory actions10 850 000
TotalTotal- 3 650 000

The overall needs of the EURI interest line of EUR 4 919,7 million above the financial programming for 2027 are financed in part by the remaining margin under sub-Heading 2b of EUR 516,4 million and the mobilisation of EUR 1 943,5 million under the Flexibility Instrument, for an overall amount of EUR 2 459,8 million corresponding to 50% of the additional needs. The EURI instrument will be mobilised for the remaining 50%, i.e. EUR 2 459,8 million. This amount is fully covered by the de-commitments made since 2021 in line with Article 10a para 3(a) of the MFF Regulation.

As a consequence, the agreed level of commitment appropriations is set at EUR 17 281,3 million, with no margin left under the expenditure ceiling of sub-heading 2b and the mobilisation of the Flexibility Instrument for an amount of EUR 1 943,5 million in accordance with Article 12 of the MFF Regulation and the mobilisation of the EURI instrument for an amount of EUR 2 459,8 million in accordance with Article 10a para 3(a) of the MFF Regulation.

Heading 3 – Natural Resources and Environment

Commitment appropriations are set at the level proposed by the Commission in the Draft Budget, as amended by Amending Letter 1/2027 but with the following adjustments, agreed by the Conciliation Committee, set out in the table below:

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
3.1.11European Agricultural Guarantee Fund (EAGF)40 474 198 34840 421 672 707- 52 525 641
08 02 01Agricultural reserve437 064 492436 581 350- 483 142
08 02 03 02Promotion of agricultural products — Simple programmes under shared management86 000 00089 000 0003 000 000
08 02 03 03Promotion of agricultural products — Multi-programmes and actions implemented by the Commission under direct management70 000 00072 000 0002 000 000
08 02 04 01Basic income support for sustainability17 957 000 00017 897 957 501- 59 042 499
08 02 04 03Complementary income support for young farmers721 000 000723 000 0002 000 000
3.2.21Programme for Environment and Climate Action (LIFE)845 362 879855 362 87910 000 000
09 02 01Nature and biodiversity348 542 606355 542 6067 000 000
09 02 04Clean energy transition139 530 119142 530 1193 000 000
PPPAPilot projects and preparatory actions750 000
TotalTotal- 41 775 641

As a consequence, the agreed level of commitment appropriations is set at EUR 57 113,4 million, leaving a margin of EUR 202,6 million under the expenditure ceiling of heading 3.

Heading 4 – Migration and Border Management

Commitment appropriations are set at the level proposed by the Commission in the Draft Budget, as amended by Amending Letter 1/2027 but with the following adjustments, agreed by the Conciliation Committee, set out in the table below:

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
4.0.11Asylum, Migration and Integration Fund2 109 688 0002 114 688 0005 000 000
10 02 01Asylum, Migration and Integration Fund (AMIF)2 102 638 0002 107 638 0005 000 000
4.0.211Integrated Border Management Fund (IBMF) - Instrument for border management and visa (BMVI)1 812 963 4251 837 963 42525 000 000
11 02 01Instrument for Financial Support for Border Management and Visa Policy1 771 638 8531 796 638 85325 000 000
4.0.212Integrated Border Management Fund (IBMF) - Instrument for financial support for customs control equipment (CCEi)144 032 000131 532 000- 12 500 000
11 03 01Instrument for financial support for customs control equipment143 945 000131 445 000- 12 500 000
TotalTotal17 500 000

As a consequence, the agreed level of commitment appropriations is set at EUR 5 811,6 million, leaving a margin of EUR 81,4 million under the expenditure ceiling of heading 4.

Heading 5 – Security and Defence

Commitment appropriations are set at the level proposed by the Commission in the Draft Budget, as amended by Amending Letter 1/2027 but with the following adjustments, agreed by the Conciliation Committee, set out in the table below:

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
5.0.11Internal Security Fund (ISF)289 921 000299 921 00010 000 000
12 02 01Internal Security Fund (ISF)287 451 000297 451 00010 000 000
5.0.1DAGDecentralised agencies310 092 916300 092 916- 10 000 000
12 10 04EU Centre on Child Sexual Abuse (CSA)11 122 0001 122 000- 10 000 000
5.0.22Military Mobility256 192 743266 192 74310 000 000
13 04 01Military mobility254 318 147264 318 14710 000 000
TotalTotal10 000 000

As a consequence, the agreed level of commitment appropriations is set at EUR 3 078,5 million, leaving a margin of EUR 1,5 million under the expenditure ceiling of heading 5.

Heading 6 – Neighbourhood and the World

Commitment appropriations are set at the level proposed by the Commission in the Draft Budget, as amended by Amending Letter 1/2027 but with the following adjustments, agreed by the Conciliation Committee, set out in the table below:

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
6.0.111Neighbourhood, Development and International Cooperation Instrument - Global Europe ( NDICI - Global Europe )10 066 775 10210 106 775 10240 000 000
14 02 01 10Southern Neighbourhood1 784 100 0001 810 100 00026 000 000
14 02 01 11Eastern Neighbourhood253 239 461266 239 46113 000 000
14 02 01 13Reform and Growth Facility for the Republic of Moldova81 500 00082 500 0001 000 000
6.0.12Humanitarian Aid (HUMA)1 962 449 9411 992 449 94130 000 000
14 03 01Humanitarian aid1 866 615 3791 896 615 37930 000 000
TotalTotal70 000 000

As a consequence, the agreed level of commitment appropriations is set at EUR 15 537,9 million, leaving a margin of EUR 351,7 million under the expenditure ceiling of heading 6 after using EUR 181,4 million to offset the mobilisation of the Single Margin Instrument in accordance with Article 11(1)(c) of the MFF Regulation.

Heading 7 – European Public Administration

The number of posts in the establishment plans of the institutions and the appropriations proposed by the Commission in the Draft Budget, as amended by Amending Letter 1/2027, are agreed by the Conciliation Committee with the following adjustments and technical corrections:

For the Translation Centre for bodies of the European Union (CdT) under the section of the European Commission, for which the level of commitment and payment appropriations is decreased by EUR 0,3 million.

The European Court of Auditors requested that 29 temporary posts be converted into permanent posts, of which 10 AD 5 posts and 19 AD 7 posts. These posts were linked to the implementation of NGEU and had been authorised in the annual budgets for 2022 and 2023 as temporary posts until the end of 2027, to reflect the time-limited nature of the related tasks. While the Commission proposed not to take this request into account in DB2027 as clearly stated in the presentation of the draft budget, the statement of estimates of the European Court of Auditors (included in Section V of the budget) showed the Court’s request without the intended adjustment. As a technical correction for the section of the European Court of Auditors, 29 permanent posts are converted back into temporary posts. This has no budgetary impact.

For the section of the European Ombudsman, one post is added to the establishment plan. The corresponding level of commitment and payment appropriations is increased by EUR 0,1 million considering recruitment on average mid-year.

For the section of the European Data Protection Supervisor, three posts are added to the establishment plan (of which two for the European Data Protection Supervisor and one for the European Data Protection Board), whereas the number of contract agents for the European Data Protection Supervisor is increased by one. The corresponding level of commitment and payment appropriations is increased by EUR 0,3 million considering recruitment on average mid-year.

For the section of the European External Action Service (EEAS), for which the number of contract agents is increased by three. The level of commitment and payment appropriations is increased accordingly considering recruitment on average mid-year. Together with an increase for buildings and communications security, the combined effect results in a total increase of EUR 3,4 million.

The overall adjustment results in an increase of EUR 3,5 million of heading 7.

Section 3 – European Commission

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
20 10 01Translation Centre for bodies of the European Union3 000 0002 700 000- 300 000
TotalTotal- 300 000

Section 8 – European Ombudsman

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
1 2 0 0Remuneration and allowances12 041 71612 126 71685 000
TotalTotal85 000

Section 9 – European Data Protection Supervisor

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
1 1 0 0Remuneration and allowances11 926 00012 096 000170 000
3 0 1 0Remuneration and allowances3 509 0003 594 00085 000
1 1 1 0Contract staff3 316 6433 355 59338 950
TotalTotal293 950

Section 10 – European External Action Service

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
3 0 0 1External staff and outside services126 479 515126 596 365116 850
2 0 0 2Fitting-out and security works4 240 0005 065 000825 000
2 0 1 2Security and surveillance of buildings10 734 00011 559 000825 000
2 1 0 1Cryptography and highly classified information and communications technology23 112 00023 937 000825 000
2 1 0 2Security of information and communication technology up to the level ‘EU restricted’5 570 0006 378 150808 150
TotalTotal3 400 000

Also, the proposed - budgetary neutral – changes to the level of appropriations by budget lines for which amendments have been introduced by the European Parliament to its own section are approved, as follows:

Section 1 – European Parliament

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in commitment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
1 4 0 4Traineeships, seconded national experts, exchanges of officials and study visits17 745 03917 445 039- 300 000
4 2 2Expenditure relating to parliamentary assistance268 503 619268 303 619- 200 000
1 6 5 2Expenditure on catering1 000 0001 500 000500 000
TotalTotal0

As a consequence, the agreed level of commitment appropriations is set at EUR 13 869,7 million, with no margin left under the expenditure the ceiling of heading 7 and the mobilisation of the Single Margin Instrument for an amount of EUR 910,7 million in accordance with Article 11(1)(a) of the MFF Regulation.

Ukraine Support Loan (USL) debt service costs

Commitment appropriations are set at the level proposed by the Commission in the Draft Budget, as amended by Amending Letter 1/2027. As a consequence, the agreed level of commitment appropriations is set at EUR 650 million.

Due to adjustments made in other headings impacting budgetary availabilities, agreed by the Conciliation Committee, the USL debt service costs are financed by: the mobilisation of the Flexibility Instrument for an amount of EUR 46,7 million in accordance with Article 12 of the MFF Regulation, the mobilisation of the Single Margin Instrument for an amount of EUR 124,7 million in accordance with Article 11(1)(a) of the MFF Regulation and the mobilisation of the Single Margin Instrument – last resort for an amount of EUR 478,6 million in accordance with Article 11(1)(c) of the MFF Regulation.

The latter mobilisation will be fully offset against margins of the ceilings in 2026 and 2027 as follows: EUR 297,1 million from the margins in headings 2a, 3, 4 and 6 in 2026 (leaving no margins available) and EUR 181,4 million from the margin in heading 6 in 2027.

Thematic special instruments: EGF, ESR, EAR and BAR

Commitment appropriations for the European Globalisation Adjustment Fund for Displaced Workers (EGF), the European Solidarity Reserve (ESR), the Emergency Aid Reserve (EAR) and the Brexit Adjustment Reserve (BAR) are set at the level proposed by the Commission in the Draft Budget.

1.4. Payment appropriations

The overall level of payment appropriations in the 2027 budget is set at the level of the Draft Budget, as amended by Amending Letter 1/2027 with the following adjustments agreed by the Conciliation Committee:

1. The agreed level of commitment appropriations for non-differentiated expenditure (headings 1 to 6), for which the level of payment appropriations is equal to the level of commitment appropriations, is taken into account. This applies to the overall reduction for the EAGF – under shared management – of EUR 54,5 million. Taking into account also the adjustment to the Union contribution to decentralised agencies (excluding the Translation Centre for bodies of the European Union; CdT) and EPPO, the combined effect is a decrease of EUR 60,5 million;

2. The adjustment under heading 7 resulting in an increase of EUR 3,5 million (including CdT);

3. The payment appropriations for all new pilot projects and preparatory actions proposed by the Parliament are set at 25% of the corresponding commitment appropriations, or at the level proposed by Parliament, if lower. In the case of extension of existing pilot projects and preparatory actions, the level of payment appropriations is the level defined in the Draft Budget as amended by the Amending letter 1/2027 plus 25% of the corresponding new commitment appropriations. The combined effect is an increase of EUR 17,4 million;

4. The adjustments to differentiated expenditure budget lines, for which the combined effect is an increase of EUR 17,5 million.

The adjustments, resulting in an overall decrease of EUR 22,1 million, are set out in the following table:

Table from the text: Budget line / Programme
Budget line / ProgrammeNameVariation in payment appropriations (in EUR)
DB 2027 (incl. AL 1/2027)Budget 2027Difference
Heading 1
1.0.11Horizon Europe14 121 123 13514 126 498 1355 375 000
01 02 02 10Cluster ‘Health’762 211 165763 898 6651 687 500
01 02 02 20Cluster ‘Culture, Creativity and Inclusive Society’276 250 246276 750 246500 000
01 02 02 41Cluster ‘Digital, Industry and Space’ — European High-Performance Computing Joint Undertaking (EuroHPC)339 849 858341 099 8581 250 000
01 02 02 50Cluster ‘Climate, Energy and Mobility’1 538 409 9171 539 597 4171 187 500
01 02 02 60Cluster ‘Food, Bioeconomy, Natural Resources, Agriculture and Environment’958 318 841959 068 841750 000
1.0.221Connecting Europe Facility (CEF) - Transport1 721 283 2511 725 658 2514 375 000
02 03 01Connecting Europe Facility (CEF) — Transport1 668 000 0001 672 375 0004 375 000
1.0.222Connecting Europe Facility (CEF) - Energy888 122 157889 372 1571 250 000
02 03 02Connecting Europe Facility (CEF) — Energy542 609 000543 859 0001 250 000
1.0.2DAGDecentralised agencies260 248 239262 248 2392 000 000
02 10 01European Union Aviation Safety Agency (EASA)49 050 44650 550 4461 500 000
02 10 05Agency for Support for BEREC (BEREC Office)8 975 6719 475 671500 000
1.0.31Single Market Programme (incl. SMEs)624 319 095626 069 0951 750 000
03 02 02Improving the competitiveness of enterprises, particularly SMEs, and supporting their access to markets113 375 000115 125 0001 750 000
PPPAPilot projects and preparatory actions14 462 500
Total 1Total Heading 129 212 500
Sub-heading 2.1
PPPAPilot projects and preparatory actions62 500
Total 2.1Total Sub-heading 2.162 500
Sub-heading 2.2
2.2.13Support to the Turkish-Cypriot Community39 430 79339 680 793250 000
05 04 01Financial support for encouraging the economic development of the Turkish Cypriot community37 000 00037 250 000250 000
2.2.21European Recovery and Resilience Facility (incl. Technical Support Instrument)114 333 35794 333 357- 20 000 000
06 02 02Technical Support Instrument112 092 35792 092 357- 20 000 000
2.2.24Union Civil Protection Mechanism (RescEU)115 000 000118 375 0003 375 000
06 05 01Union Civil Protection Mechanism105 000 000108 375 0003 375 000
2.2.25EU4Health670 738 933670 988 933250 000
06 06 01EU4Health Programme641 450 000641 700 000250 000
2.2.32Erasmus+4 428 671 1794 432 171 1793 500 000
07 03 01 01Promoting learning mobility of individuals and groups, and cooperation, inclusion and equity, excellence, creativity and innovation at the level of organisations and policies in the field of education and training — Indirect management3 040 464 0473 043 964 0473 500 000
2.2.34Creative Europe406 448 272406 698 272250 000
07 05 02Media strand216 042 660216 292 660250 000
2.2.352Rights and Values273 120 913273 370 913250 000
07 06 02Citizens’ engagement and participation in the democratic life of the Union68 580 10768 830 107250 000
2.2.3DAGDecentralised agencies364 466 637366 466 6372 000 000
07 10 08European Public Prosecutor’s Office (EPPO)102 556 619104 556 6192 000 000
2.2.3SPECActions financed under the prerogatives of the Commission and specific competences conferred to the Commission180 717 238181 217 238500 000
07 20 04 09Information and training measures for workers’ organisations23 500 00024 000 000500 000
PPPAPilot projects and preparatory actions2 712 500
Total 2.2Total Sub-heading 2.2- 6 912 500
Heading 3
3.1.11European Agricultural Guarantee Fund (EAGF)40 504 840 62840 452 314 987- 52 525 641
08 02 01Agricultural reserve437 064 492436 581 350- 483 142
08 02 03 02Promotion of agricultural products — Simple programmes under shared management86 000 00089 000 0003 000 000
08 02 03 03Promotion of agricultural products — Multi-programmes and actions implemented by the Commission under direct management88 595 69590 595 6952 000 000
08 02 04 01Basic income support for sustainability17 957 000 00017 897 957 501- 59 042 499
08 02 04 03Complementary income support for young farmers721 000 000723 000 0002 000 000
3.2.21Programme for Environment and Climate Action (LIFE)784 092 687786 592 6872 500 000
09 02 01Nature and biodiversity217 663 278219 413 2781 750 000
09 02 04Clean energy transition165 000 000165 750 000750 000
PPPAPilot projects and preparatory actions187 500
Total 3Total Heading 3- 49 838 141
Heading 4
4.0.11Asylum, Migration and Integration Fund1 141 600 5771 142 850 5771 250 000
10 02 01Asylum, Migration and Integration Fund (AMIF)1 048 209 7181 049 459 7181 250 000
4.0.211Integrated Border Management Fund (IBMF) - Instrument for border management and visa (BMVI)756 444 703762 694 7036 250 000
11 02 01Instrument for Financial Support for Border Management and Visa Policy741 258 540747 508 5406 250 000
4.0.212Integrated Border Management Fund (IBMF) - Instrument for financial support for customs control equipment (CCEi)205 464 179202 339 179- 3 125 000
11 03 01Instrument for financial support for customs control equipment205 377 179202 252 179- 3 125 000
Total 4Total Heading 44 375 000
Heading 5
5.0.11Internal Security Fund (ISF)183 011 180188 011 1805 000 000
12 02 01Internal Security Fund (ISF)172 541 180177 541 1805 000 000
5.0.1DAGDecentralised agencies313 076 444303 076 444- 10 000 000
12 10 04EU Centre on Child Sexual Abuse (CSA)11 122 0001 122 000- 10 000 000
5.0.22Military Mobility151 874 596154 374 5962 500 000
13 04 01Military mobility150 000 000152 500 0002 500 000
Total 5Total Heading 5- 2 500 000
Heading 7
7.2Administrative expenditure of the institutions10 329 248 28710 332 727 2373 478 950
7.2.1European Parliament2 694 311 1362 694 311 1360
7.2.3Commission4 757 249 9064 756 949 906- 300 000
7.2.8European Ombudsman16 900 61216 985 61285 000
7.2.9European Data Protection Supervisor30 634 18930 928 139293 950
7.2.XEuropean External Action Service969 858 055973 258 0553 400 000
Total Heading 73 478 950
TOTAL- 22 121 691

Overall, this results in a level of payment appropriations of EUR 211 525,8 million, which represents a decrease of EUR 22,1 million in comparison with the Draft Budget, as amended by Amending Letter 1/2027.

1.5. Reserves

Compared to the Draft Budget, as amended by Amending Letter 1/2027, EUR 10,0 million in commitment and payment appropriations are moved from the reserve under Article 30 02 02 Differentiated appropriations to the Internal Security Fund programme under budget line 12 02 01.

1.6. Budget remarks

The text of budget remarks corresponds to the Draft Budget, as amended by Amending Letter 1/2027 with the following adjustments proposed in the letter of executability and agreed by the Conciliation Committee:

Budget lines for which amendments have been introduced by the European Parliament to its own section are approved without modifications.

This is with the understanding that amendments introduced by the European Parliament or the Council cannot modify or extend the scope of an existing legal base, or impinge on the administrative autonomy of the institutions, and that the action can be covered by available resources.

1.7. Budget nomenclature

The budget nomenclature proposed by the Commission in the Draft Budget, as amended by Amending Letter 1/2027, is agreed, with the inclusion of the new pilot projects and preparatory actions.

2. Budget 2026

DAB 3/2026 is approved as proposed by the Commission.

3. Statements

3.1. Joint statement by the European Parliament and the Council on payment appropriations

In order to ensure the proper implementation of Union's programmes and to avoid an excessive level of outstanding commitments (RAL) in the final year of the current MFF, the European Parliament and the Council call on the Commission to continue closely and actively monitoring, during the year 2027, the implementation of the programmes (particularly in sub-heading 2a (Economic, social and territorial cohesion) and Rural Development). To that end, taking into account the forecasts accuracy of the Member States where applicable and the payments margin in the draft budget 2027 - mainly driven by sub heading 2a, the European Parliament and the Council expect the Commission to present in a timely manner updated figures concerning the state of affairs and estimates regarding 2027 payment appropriations.

If the figures show that the appropriations entered in the 2027 budget are insufficient to cover the justified needs, the European Parliament and the Council invite the Commission to present as soon as possible an appropriate solution, inter alia a draft amending budget, with a view to allowing the European Parliament and the Council to take any necessary decisions as soon as possible without undue delay for justified needs. Where applicable, the European Parliament and the Council will take into account the urgency of the matter, shortening the eight-week period for a decision if deemed necessary. The same applies mutatis mutandis if the figures show that the appropriations entered in the 2027 budget are higher than needed.

3.2. Joint statement by the European Parliament, the Council and the Commission on the use of special instruments in the 2027 budget

While the European Parliament and the Council did not mobilise the Ukraine Support Loan special instrument in the context of the 2027 budget, the mobilisation of the USL instrument remains possible in 2027 in accordance with Article 10(c) of the MFF Regulation. Should new unforeseen and exceptional circumstances emerge, the European Parliament and the Council invite the Commission to present an appropriate solution, inter alia a draft amending budget, with a view to allowing the European Parliament and the Council to take any necessary decisions for such justified needs.

Annex: declarations of input 4 blocks

DECLARATION OF INPUT FROM NILS UŠAKOVS

The rapporteur declares under his exclusive responsibility that he did not include in his report input from interest representatives falling within the scope of the Interinstitutional Agreement on a mandatory transparency register[1], or from representatives of public authorities of third countries, including their diplomatic missions and embassies, to be listed in this Annex pursuant to Article 8 of Annex I to the Rules of Procedure.

DECLARATION OF INPUT FROM MICHALIS HADJIPANTELA

The rapporteur declares under his exclusive responsibility that he did not include in his report input from interest representatives falling within the scope of the Interinstitutional Agreement on a mandatory transparency register[2], or from representatives of public authorities of third countries, including their diplomatic missions and embassies, to be listed in this Annex pursuant to Article 8 of Annex I to the Rules of Procedure.

Procedure pages and committee votes

How the committees handled the text and how their members voted on it. Collapsed.

Procedure – committee responsible 1 block
Table from the text: Title
TitleGeneral budget of the European Union for the financial year 2027
References0000/2026 – C100218/2026 – 2026/0196(BUD)
Delegation Chair: PresidentRoberta Metsola
Committee responsible ChairBUDG Johan Van Overtveldt
Rapporteur(s)Nils UšakovsMichalis Hadjipantela
Draft acts consideredCOM(2026)0300
Council position Date adopted Date announced in plenary11547/2026 – C10-0218/2026 11.9.2026 14.9.2026
Date of Parliament’s position21.10.2026P10_TA-PROV(2026)10-21(ANN01)
Date of Council letter on non-approval of Parliament amendments21.10.2026
Conciliation Committee meetings03.11.202610.11.202611.11.2026
Date of adoption by Parliament’s delegation under Article 314(5) TFEU11.11.2026
Members presentIsabel Benjumea Benjumea, Tamás Deutsch, Jean-Marc Germain, Sandra Gómez López, Michalis Hadjipantela, Andrzej Halicki, Monika Hohlmeier, Fabienne Keller, Moritz Körner, Siegfried Mureşan, Victor Negrescu, Danuše Nerudová, Rasmus Nordqvist, Karlo Ressler, Hélder Sousa Silva, Carla Tavares, Kai Tegethoff, Nils Ušakovs, Johan Van Overtveldt, Lucia Yar
Date of agreement in Conciliation Committee11.11.2026
Date on which the co-Chairs established that the joint text had been approved and forwarded it to Parliament and the Council11.11.2026
Date tabled17.11.2026

Connections

The dossier, the decisions on this text and its other versions.

No connections found for this item.

Sources & citation

Where the facts on this page come from, and how to cite it.

Data source
Licensed CC BY 4.0.
Retrieved
23 November 2026

Cite as

European Parliament (2026). “REPORT on the joint text on the draft general budget of the European Union for the financial year 2027 approved by the Conciliation Committee under the budgetary procedure”. Text, 17 November 2026. docId A-10-2026-0305, reference A10-0305/2026. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-10-2026-0305 (retrieved 23 November 2026). Official source: The text on the European Parliament’s website, https://www.europarl.europa.eu/doceo/document/A-10-2026-0305_EN.html. Data: EP Open Data API: document record, https://data.europarl.europa.eu/api/v2/documents/A-10-2026-0305 (CC BY 4.0).
BibTeX
@misc{epw-text-a-10-2026-0305,
  author = {{European Parliament}},
  title = {{REPORT on the joint text on the draft general budget of the European Union for the financial year 2027 approved by the Conciliation Committee under the budgetary procedure}},
  year = {2026},
  date = {2026-11-17},
  howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-10-2026-0305}},
  url = {https://news.eu-parl.st-solutions.dev/texts/A-10-2026-0305},
  urldate = {2026-11-23},
  publisher = {EU Parl Watch Research},
  note = {Text. docId A-10-2026-0305, reference A10-0305/2026. Official source: https://www.europarl.europa.eu/doceo/document/A-10-2026-0305\_EN.html. Data: EP Open Data API: document record (CC BY 4.0)}
}