Text
The text as parsed from the official Word file. Every paragraph has a link (¶) and can be saved to a project as a passage.
▸Jump to an amendment (10)
on behalf of the ESN Group
(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))
Proposal for a regulation
Amendment: Text proposed by the Commission and Amendment| Text proposed by the Commission | Amendment |
|---|
| Text proposed by the Commission | Amendment(2a) International climate commitments, such as the Paris Agreement, have previously faced rejection or withdrawal by certain countries, including the United States due to perceived severe economic disadvantages and burdens on domestic industries. |
on behalf of the ESN Group
Speeding-up environmental assessments (Omnibus VIII on environmental legislation)
(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))
Proposal for a regulation
Amendment: Text proposed by the Commission and Amendment| Text proposed by the Commission | Amendment |
|---|
| Text proposed by the Commission | Amendment(3a) While the Draghi report provided valuable and actionable recommendations for structural reform, the Commission has predominantly utilised them to justify further regulation and centralisation of competencies. |
on behalf of the ESN Group
Speeding-up environmental assessments (Omnibus VIII on environmental legislation)
(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))
Proposal for a regulation
Amendment: Text proposed by the Commission and Amendment| Text proposed by the Commission | Amendment |
|---|
| Text proposed by the Commission | Amendment(37a) Member States should be able to designate projects as strategic, based on objective and published criteria established by the competent national authority, if such projects contribute significantly to the security of a reliable, affordable, and continuous energy supply or are essential for food security and the maintenance of agricultural production and processing capacities. Energy security should be assessed independently of technology and should include, in particular, secured generation capacity, energy storage, and transmission and distribution networks. With regard to food security, projects relating to primary agricultural production, livestock farming, the supply of feed and fertilisers, irrigation, storage, refrigeration, processing, and the transport of agricultural products may be particularly important. The classification is carried out by the Member State without prior approval or confirmation from the Commission. Projects should be granted access to the instruments listed in the Annex in accordance with the respective conditions. The requirements of the relevant environmental directives remain unaffected. |
on behalf of the ESN Group
Speeding-up environmental assessments (Omnibus VIII on environmental legislation)
(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))
Proposal for a regulation
Article 5 – paragraph 1 a (new)
Amendment: Text proposed by the Commission and Amendment| Text proposed by the Commission | Amendment |
|---|
| Text proposed by the Commission | Amendment1a. During the preliminary assessment and, where necessary, the environmental assessment of a modification or extension of a lawfully authorised project within the meaning of Article 1(2), point (a), of Directive 2011/92/EU, the competent authority shall assess the likely significant effects of the proposed modification or extension, including its cumulative effects, in conjunction with the existing project and other relevant projects. The authority shall use the results of previous assessments to the extent that they remain current and relevant. A new assessment of unaffected parts of the existing project may be required solely on the basis of the proposed modification or extension only to the extent that this is necessary to assess cumulative effects or is required under Union law. |
on behalf of the ESN Group
Speeding-up environmental assessments (Omnibus VIII on environmental legislation)
(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))
Proposal for a regulation
Article 6 – paragraph 1 a (new)
Amendment: Text proposed by the Commission and Amendment| Text proposed by the Commission | Amendment |
|---|
| Text proposed by the Commission | AmendmentMember States shall ensure that natural and legal persons, as well as affected local communities, have access to effective judicial remedies against decisions, acts, or omissions related to environmental assessments. A claim may not be excluded in judicial proceedings solely on the grounds that it was not raised during the administrative proceedings. The rules of procedure must safeguard access to environmental information and public participation, as well as the rights under the Aarhus Convention. |
on behalf of the ESN Group
Speeding-up environmental assessments (Omnibus VIII on environmental legislation)
(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))
Proposal for a regulation
Article 7 – paragraph 1 – point d – paragraph 2 a (new)
Amendment: Text proposed by the Commission and Amendment| Text proposed by the Commission | Amendment |
|---|
| Text proposed by the Commission | AmendmentIf, by the end of the period specified in point (d), first subparagraph, the competent authority has neither confirmed that the application is complete nor provided the project promoter with a written and reasoned statement specifying which information required for the environmental assessment is missing, the period specified in point (e) shall start upon the expiry of the period specified in point (d), first subparagraph. If the time limit referred to in point (d), first subparagraph, has been extended in accordance with Article 7(1), third subparagraph, the period specified in point (e) shall start upon the expiry of the extended time limit. The expiry of those time limits shall not be deemed to constitute either a confirmation of completeness or an approval of the project. The competent authority shall conduct the environmental review required under Union law and shall, in every case, issue a reasoned conclusion. |
on behalf of the ESN Group
Speeding-up environmental assessments (Omnibus VIII on environmental legislation)
(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))
Proposal for a regulation
Article 7 – paragraph 1 – point e – paragraph 3
Amendment: Text proposed by the Commission and Amendment| Text proposed by the Commission | Amendment |
|---|
| Text proposed by the CommissionIn exceptional cases, where the nature, complexity, location or size of the proposed project so require, the competent authority may extend the deadlines set out in this paragraph by a period of maximum 30 days. In that event, the competent authority shall inform the developer in writing without delay of the reasons justifying the extension and of the date when the respective administrative act is expected. | AmendmentIn exceptional cases, where the nature, complexity, location or size of the proposed project so require, the competent authority may extend the deadlines set out in this paragraph by a period of maximum 30 days. Member States may provide for further extensions in duly justified cases where this is necessary to ensure a comprehensive environmental assessment, taking into account the specific circumstances of the project and national environmental protection requirements. |
on behalf of the ESN Group
Speeding-up environmental assessments (Omnibus VIII on environmental legislation)
(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))
Proposal for a regulation
Amendment: Text proposed by the Commission and Amendment| Text proposed by the Commission | Amendment |
|---|
| Text proposed by the Commission4. From [OP: please insert the date = twenty-four months after the date of entry into force of this Regulation], Member States shall ensure that environmental assessment and screening procedures are fully digitalized and enable the re-use of data and documents held by public authorities at national level as well as the sharing of such data between Member States, developers and the public, in a seamless manner. Where appropriate, such procedures shall be interoperable with European Digital Identity Wallets and European Business Wallets. From that date, Member States shall also take the necessary measures to enhance the efficiency and effectiveness of their environmental assessment and screening procedures, including through the use of automated systems. These automated systems shall be aligned with relevant Union policies, respect data protection and privacy laws, and adhere to principles of transparency and accountability, including human decisional control. | Amendment4. From [OP: please insert the date = twenty-four months after the date of entry into force of this Regulation], Member States shall also take the necessary measures to enhance the efficiency and effectiveness of their environmental assessment and screening procedures, including through the use of automated systems. The choice, development and deployment of such systems shall remain within the competence of Member States. These automated systems shall be aligned with relevant Union policies, respect data protection and privacy laws, and adhere to principles of transparency and accountability, including human decisional control. Final decisions on environmental assessments shall remain the responsibility of the competent national authorities. |
on behalf of the ESN Group
Speeding-up environmental assessments (Omnibus VIII on environmental legislation)
(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))
Proposal for a regulation
Article 14 – paragraph 1 – subparagraph 2
Amendment: Text proposed by the Commission and Amendment| Text proposed by the Commission | Amendment |
|---|
| Text proposed by the CommissionThe Commission is empowered to adopt an implementing act identifying strategic projects for the construction and renovation of residential affordable or social buildings, as well as the necessary infrastructure that directly serves those buildings. The provisions set out in the Annex shall apply to those projects. | AmendmentThe Commission is empowered to adopt an implementing act identifying strategic projects for the construction and renovation of residential affordable or social buildings, as well as the necessary infrastructure that directly serves those buildings, subject to the prior consent of the Member State on whose territory the project is to be implemented. The provisions set out in the Annex shall apply to those projects. |
on behalf of the ESN Group
Speeding-up environmental assessments (Omnibus VIII on environmental legislation)
(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))
Proposal for a regulation
Article 14 – paragraph 2 a (new)
Amendment: Text proposed by the Commission and Amendment| Text proposed by the Commission | Amendment |
|---|
| Text proposed by the Commission | Amendment2a. Member States may, through the competent national authority, classify projects for energy generation, energy storage, and energy transmission and distribution within their territory as strategic on the basis of objective and published criteria, provided that they contribute significantly to the security of energy supply. Such classification shall be carried out by the Member State without prior approval or confirmation by the Commission. Security of energy supply includes, in particular, a reliable, affordable, and continuous supply, sufficient secured generation capacity, grid stability, and storage and transmission capacity. The designation shall be made regardless of the technology used and may, in particular, cover nuclear energy as well as other dispatchable generation technologies, storage, and grids. Sections I, II, and III of the Annex also apply to those projects in accordance with the conditions set out therein. The application of the Annex pursuant to this paragraph requires neither a determination under paragraph 1 nor a reference under paragraph 2. The conditions set out in paragraphs 1 and 2 regarding a contribution to resilience and decarbonisation or to resource efficiency shall not apply in this context. When conducting the review pursuant to Section I of the Annex, the competent authority shall give special consideration to the project’s contribution to energy supply security and shall assess on a case-by-case basis whether the requirements of the directives specified therein are met. |