Skip to content

Text · Amendment list

Speeding-up environmental assessments (Omnibus VIII on environmental legislation)

Report A-10-2026-0290-AM-115-117 · COM(2025)0984 – C10-0337/2025 – 2025/0391(COD)

Kind
Amendment list A-10-2026-0290-AM-115-117
Date
18 November 2026
Dossier
2025-0391
More facts (2)
Reference
COM(2025)0984 – C10-0337/2025 – 2025/0391(COD)
More

Text

The text as parsed from the official Word file. Every paragraph has a link (¶) and can be saved to a project as a passage.

18.11.2026 A10-0290/115

Amendment 115

Mathilde Androuët, Valérie Deloge, Jorge Buxadé Villalba, Anne-Sophie Frigout, Kateřina Konečná, Antonín Staněk

on behalf of the PfE Group

Report A10-0290/2026

Emma Ytterell

(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))

Proposal for a regulation

Article 5 – paragraph 2 a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
2a. The maintenance, cleaning and clearing of riverbeds, ravines, drainage channels, irrigation channels and existing flood defence works, including dredging, desilting, removal of debris and sediment, restoration of water flow and reinforcement of existing protective infrastructure as well as the management of vegetation and forest fuel for the prevention of wildfires, including brush clearing, removal of deadwood, controlled vegetation management and the creation and maintenance of firebreaks which restore or preserve theexisting functionality, safety or resilience of the land or infrastructure shall not constitute projects or changes to projects within the meaning of Directive 2011/92/EU and shall not be subject to screening or an environmental impact assessment.

Or. en

18.11.2026 A10-0290/116

Amendment 116

Mathilde Androuët, Valérie Deloge, Jorge Buxadé Villalba, Anne-Sophie Frigout, Kateřina Konečná, Antonín Staněk

on behalf of the PfE Group

Report A10-0290/2026

Emma Ytterell

Speeding-up environmental assessments (Omnibus VIII on environmental legislation)

(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))

Proposal for a regulation

Article 7 – paragraph 1 a (new)

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
1a. By way of derogation from paragraph 1, for projects for the construction or renovation of residential buildings, water infrastructure projects contributing to water security, drought resilience or flood protection, including water storage facilities, reservoirs, dams, drainage systems and flood defence infrastructure, and projects for the modernisation of agricultural and livestock holdings and of irrigation infrastructure, including water storage, water reuse and on-farm water management systems, Member States shall ensure that:
(a) the screening is carried out within a maximum of 30 days from the date on which the developer has submitted all information required; where the competent authority has not taken a screening decision within that period, the project shall be deemed not to require an environmental impact assessment, unless the project may pose a demonstrable and significant risk to the safety of residents in its vicinity;
(b) where an environmental impact assessment is required, the complete environmental assessment, excluding the preparation of the environmental impact assessment report by the developer, does not exceed 90 days.

Or. en

18.11.2026 A10-0290/117

Amendment 117

Mathilde Androuët, Valérie Deloge, Kateřina Konečná, Antonín Staněk

on behalf of the PfE Group

Report A10-0290/2026

Emma Ytterell

Speeding-up environmental assessments (Omnibus VIII on environmental legislation)

(COM(2025)0984 – C10-0337/2025 – 2025/0391(COD))

Proposal for a regulation

Article 8 – paragraph 1

Amendment: Text proposed by the Commission and Amendment
Text proposed by the CommissionAmendment
1. When the implementation of plans or when the construction, operation or decommissioning of projects result in the occasional killing or disturbance of birds protected under Directive 2009/147/EC or other species protected under Directive 92/43/EEC, such killing or disturbance of protected species shall not be considered to be deliberate within the meaning of Article 5 of Directive 2009/147/EC and Article 12(1) of Directive 92/43/EEC, provided that the plan or project has adopted appropriate and proportionate mitigation measures and considering the best available technologies to avoid such killing and to prevent disturbance.1. Where the plans, projects, works or recurring activities referred to in the first subparagraph result in the deterioration or destruction of breeding sites or resting places of species protected under Directive 92/43/EEC, this shall not be considered as prohibited within the meaning of Article 12(1), point (d), of that Directive, provided that the relevant Member State authority has determined that the plan, project, works or recurring activity includes appropriate and proportionate measures, which may be defined under specific national or regional regimes, to avoid such deterioration or destruction.

Or. en

Connections

The dossier, the decisions on this text and its other versions.

No connections found for this item.

Sources & citation

Where the facts on this page come from, and how to cite it.

Data source
Licensed CC BY 4.0.
Retrieved
24 November 2026

Cite as

European Parliament (2026). “A10-0290/115 - Amendement 115 - Mathilde Androuët, Valérie Deloge, Jorge Buxadé Villalba, Anne-Sophie Frigout, Kateřina Konečná, Antonín Staněk - au nom du groupe PfE - Rapport A10-0290/2026 - Emma Ytterell - Accélération des évaluations environnementales (Omnibus VIII sur la législation environnementale) - (COM(2025)0984 - C10-0337/2025 - 2025/0391(COD))”. Text, 18 November 2026. docId A-10-2026-0290-AM-115-117, reference A10-0290/2026. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-10-2026-0290-AM-115-117 (retrieved 24 November 2026). Data: EP Open Data API: document record, https://data.europarl.europa.eu/api/v2/documents/A-10-2026-0290-AM-115-117 (CC BY 4.0).
BibTeX
@misc{epw-text-a-10-2026-0290-am-115-117,
  author = {{European Parliament}},
  title = {{A10-0290/115 - Amendement 115 - Mathilde Androuët, Valérie Deloge, Jorge Buxadé Villalba, Anne-Sophie Frigout, Kateřina Konečná, Antonín Staněk - au nom du groupe PfE - Rapport A10-0290/2026 - Emma Ytterell - Accélération des évaluations environnementales (Omnibus VIII sur la législation environnementale) - (COM(2025)0984 - C10-0337/2025 - 2025/0391(COD))}},
  year = {2026},
  date = {2026-11-18},
  howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-10-2026-0290-AM-115-117}},
  url = {https://news.eu-parl.st-solutions.dev/texts/A-10-2026-0290-AM-115-117},
  urldate = {2026-11-24},
  publisher = {EU Parl Watch Research},
  note = {Text. docId A-10-2026-0290-AM-115-117, reference A10-0290/2026. Data: EP Open Data API: document record (CC BY 4.0)}
}