Text · Amendment list
Electricity grids: the backbone of the EU energy system
Report A-10-2025-0091-AM-001-001 · 2025/2006(INI)
- Kind
- Amendment list A-10-2025-0091-AM-001-001
- Date
- 10 June 2025
- Dossier
- 2025/2006(INI)
More facts (2)
- Formats
- Official page PDF Word
- Reference
- 2025/2006(INI)
Text
The text as parsed from the official Word file. Every paragraph has a link (¶) and can be saved to a project as a passage.
Seán Kelly, Anna Stürgkh, Bruno Tobback, Dirk Gotink, Herbert Dorfmann, Raúl de la Hoz Quintano, Esteban González Pons, Riho Terras, Dolors Montserrat, Michalis Hadjipantela, Isabel Benjumea Benjumea, Fredis Beleris, Pablo Arias Echeverría, Niels Geuking, Angelika Niebler, Paulo Cunha, Tom Berendsen, Adam Jarubas, Wouter Beke, Gabriel Mato, Jessika Van Leeuwen, Peter Liese, Aura Salla, Niels Flemming Hansen, Jan Farský, Eszter Lakos, Andrea Wechsler, Michał Kobosko, João Cotrim De Figueiredo, Eero Heinäluoma, Mohammed Chahim, Jens Geier, Nicolás González Casares, Dario Nardella, Matthias Ecke, Mirosława Nykiel, Christian Ehler, Pilar del Castillo Vera, Juan Ignacio Zoido Álvarez, Antonio López-Istúriz White, Borja Giménez Larraz, Javier Zarzalejos, Maravillas Abadía Jover, Carmen Crespo Díaz, Susana Solís Pérez, Adrián Vázquez Lázara, Elena Nevado del Campo, Esther Herranz García, Nicolás Pascual de la Parte, Alma Ezcurra Almansa, Rosa Estaràs Ferragut, Fernando Navarrete Rojas, Francisco José Millán Mon, Salvatore De Meo, Kinga Kollár, Georgios Aftias, Maria Walsh, Pascal Arimont, Tomáš Zdechovský, Daniel Buda, Alexandra Mehnert, Niclas Herbst, Oliver Schenk, Zoltán Tarr, Romana Tomc, Michał Wawrykiewicz, Tomas Tobé, Hanna Gronkiewicz-Waltz, Angelika Winzig, Nina Carberry, Stefan Köhler, Miriam Lexmann
| Motion for a resolution | Amendment |
|---|---|
| Q. whereas the electricity system blackout experienced in the Iberian Peninsula and parts of France on 28 April 2025 illustrated how important it is to increase the energy grid’s resilience by ensuring that it is well maintained, protected and balanced at all times, including through flexible system services and enhanced cross-border interconnections, to allow for an agile recovery in the event of system failure; | Q. whereas the electricity system blackout experienced in the Iberian Peninsula and parts of France on 28 April 2025 illustrated, among other things, how important it is to increase the energy grid’s resilience by ensuring that it is well maintained, protected and balanced at all times, including through flexible system services and enhanced cross-border interconnections, to allow for an agile recovery in the event of system failure; |
Connections
The dossier, the decisions on this text and its other versions.
No connections found for this item.
Sources & citation
Where the facts on this page come from, and how to cite it.
- Data source
- Licensed CC BY 4.0.
- Retrieved
- 25 September 2026
Cite as
European Parliament (2025). “A10-0091/1 - Amendment 1 - Seán Kelly, Anna Stürgkh, Bruno Tobback, Dirk Gotink, Herbert Dorfmann, Raúl de la Hoz Quintano, Esteban González Pons, Riho Terras, Dolors Montserrat, Michalis Hadjipantela, Isabel Benjumea Benjumea, Fredis Beleris, Pablo Arias Echeverría, Niels Geuking, Angelika Niebler, Paulo Cunha, Tom Berendsen, Adam Jarubas, Wouter Beke, Gabriel Mato, Jessika Van Leeuwen, Peter Liese, Aura Salla, Niels Flemming Hansen, Jan Farský, Eszter Lakos, Andrea Wechsler, Michał Kobosko, João Cotrim De Figueiredo, Eero Heinäluoma, Mohammed Chahim, Jens Geier, Nicolás González Casares, Dario Nardella, Matthias Ecke, Mirosława Nykiel, Christian Ehler, Pilar del Castillo Vera, Juan Ignacio Zoido Álvarez, Antonio López-Istúriz White, Borja Giménez Larraz, Javier Zarzalejos, Maravillas Abadía Jover, Carmen Crespo Díaz, Susana Solís Pérez, Adrián Vázquez Lázara, Elena Nevado del Campo, Esther Herranz García, Nicolás Pascual de la Parte, Alma Ezcurra Almansa, Rosa Estaràs Ferragut, Fernando Navarrete Rojas, Francisco José Millán Mon, Salvatore De Meo, Kinga Kollár, Georgios Aftias, Maria Walsh, Pascal Arimont, Tomáš Zdechovský, Daniel Buda, Alexandra Mehnert, Niclas Herbst, Oliver Schenk, Zoltán Tarr, Romana Tomc, Michał Wawrykiewicz, Tomas Tobé, Hanna Gronkiewicz-Waltz, Angelika Winzig, Nina Carberry, Stefan Köhler, Miriam Lexmann - Report A10-0091/2025 - Anna Stürgkh - Electricity grids: the backbone of the EU energy system - (2025/2006(INI))”. Text, 10 June 2025. docId A-10-2025-0091-AM-001-001, reference A10-0091/2025. EU Parl Watch Research. https://news.eu-parl.st-solutions.dev/texts/A-10-2025-0091-AM-001-001 (retrieved 25 September 2026). Data: EP Open Data API: document record, https://data.europarl.europa.eu/api/v2/documents/A-10-2025-0091-AM-001-001 (CC BY 4.0).
BibTeX
@misc{epw-text-a-10-2025-0091-am-001-001,
author = {{European Parliament}},
title = {{A10-0091/1 - Amendment 1 - Seán Kelly, Anna Stürgkh, Bruno Tobback, Dirk Gotink, Herbert Dorfmann, Raúl de la Hoz Quintano, Esteban González Pons, Riho Terras, Dolors Montserrat, Michalis Hadjipantela, Isabel Benjumea Benjumea, Fredis Beleris, Pablo Arias Echeverría, Niels Geuking, Angelika Niebler, Paulo Cunha, Tom Berendsen, Adam Jarubas, Wouter Beke, Gabriel Mato, Jessika Van Leeuwen, Peter Liese, Aura Salla, Niels Flemming Hansen, Jan Farský, Eszter Lakos, Andrea Wechsler, Michał Kobosko, João Cotrim De Figueiredo, Eero Heinäluoma, Mohammed Chahim, Jens Geier, Nicolás González Casares, Dario Nardella, Matthias Ecke, Mirosława Nykiel, Christian Ehler, Pilar del Castillo Vera, Juan Ignacio Zoido Álvarez, Antonio López-Istúriz White, Borja Giménez Larraz, Javier Zarzalejos, Maravillas Abadía Jover, Carmen Crespo Díaz, Susana Solís Pérez, Adrián Vázquez Lázara, Elena Nevado del Campo, Esther Herranz García, Nicolás Pascual de la Parte, Alma Ezcurra Almansa, Rosa Estaràs Ferragut, Fernando Navarrete Rojas, Francisco José Millán Mon, Salvatore De Meo, Kinga Kollár, Georgios Aftias, Maria Walsh, Pascal Arimont, Tomáš Zdechovský, Daniel Buda, Alexandra Mehnert, Niclas Herbst, Oliver Schenk, Zoltán Tarr, Romana Tomc, Michał Wawrykiewicz, Tomas Tobé, Hanna Gronkiewicz-Waltz, Angelika Winzig, Nina Carberry, Stefan Köhler, Miriam Lexmann - Report A10-0091/2025 - Anna Stürgkh - Electricity grids: the backbone of the EU energy system - (2025/2006(INI))}},
year = {2025},
date = {2025-06-10},
howpublished = {\url{https://news.eu-parl.st-solutions.dev/texts/A-10-2025-0091-AM-001-001}},
url = {https://news.eu-parl.st-solutions.dev/texts/A-10-2025-0091-AM-001-001},
urldate = {2026-09-25},
publisher = {EU Parl Watch Research},
note = {Text. docId A-10-2025-0091-AM-001-001, reference A10-0091/2025. Data: EP Open Data API: document record (CC BY 4.0)}
}